Introduction
Director(E&M) Desk
OC Projects
UG Mines
Machine Mining
Power Houses
Workshops
Coal Handling Plants
Energy Conservation
Mining Machinery Suppliers
News
Condition Based Monitoring
Back
INDUSTRIAL
 
STRATEGY | CONSERVATION ACTIVITIES | DOMESTIC | ECONOMICS
 
INDUSTRIAL
Automatic Control Switches[for Street lighting,Yard lighting, Mine surface lighting]
• Total Quantity proposed : 380 Nos.
• Total initial cost : Rs.40.84 Lakhs
• Expected savings / year : Rs.37.44 Lakhs
• Payback period : 1.1 Year
Lighting system in Under Ground Mine
• Proposed to use Light Emitting Diode [LED] based lights for Underground roadway illumination.
• LED has got long service life of eleven years.
• Expected energy savings of 60% [Approx.].
• For 54 Underground Mines and minimum 100Kms roadway lighting expected savings are Rs.51.6Lakh per year.
Illumination of Open Cast Mines[Quarry Lighting]
• Proposed to install effective and energy efficient lighting system in Open cast Mines.
• To cover all locations in all Open cast Mines.
• Initially it is being implemented at Open cast-II, Manuguru. Order placed for luminaries and towers.
Energy conservation in Pumping activity
• Reorganization of pumping layouts in all Underground mines is planned and action initiated for implementation.
• Procurement of energy efficient pumps is under processing.
• Expected reduction in energy consumption per annum is 10-15%
Energy efficient Starters for Mining Machinery
• For Direct Haulers, Belt conveyors, ventilation fans and pumpsets, variable speed drives are proposed.
• Fibre Reinforced Plastic [FRP] runners for mine ventilation fans in place of metallic runners are proposed.
• Expected reduction in energy consumption per annum is 10-15%
Solar Powered Security Fence system
• Enhanced protection to company’s property and avoiding pilferage.
• Reduction in security manpower.
• Reduction in patrolling Costs.
• Energy savings by Reduced flood lighting.
• Expected payback period : 3.5Years