THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Jan-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.90| 3.17| 6.07| | 0.70| 2.71| 3.41| 6.94| 3.07| 3.85| 2.90| 2.80| 5.70| 1.08| 1.75| | 0.50| 1.00| 3.25| | 0.56| 1.92| 2.48| 35.85| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.90| 3.17| 6.07| | 0.70| 2.71| 3.41| 6.94| 3.07| 3.85| 2.90| 2.80| 5.70| 1.08| 1.75| | 0.50| 1.00| 3.25| | 0.56| 1.92| 2.48| 35.85| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 3.36| 3.60| 6.96| | 0.93| 3.67| 4.60| 7.97| 2.84| 4.20| 3.98| 1.70| 5.68| 0.01| 3.28| | 2.17| | 5.46| | 0.61| 2.75| 3.35| 41.06| | - Contractor | | 0.48| 0.48| | | | | 1.21| 0.45| | | 0.43| 0.43| | | | | | | | | 0.73| 0.73| 3.30| | - Total | 3.36| 4.08| 7.45| | 0.93| 3.67| 4.60| 9.18| 3.29| 4.20| 3.98| 2.12| 6.10| 0.01| 3.28| | 2.17| | 5.46| | 0.61| 3.48| 4.09| 44.35| | % Achievement | 116| 129| 123| | 134| 135| 135| 132| 107| 109| 137| 76| 107| 1| 188| | 435| | 168| | 108| 181| 165| 124| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | | | | | | | | 0.45| | | | | 0.45| | | | | | | | 2.08| | 2.08| 2.53| | % Rehandle in Total | | | | | | | | 6| | | | | 8| | | | | | | | 344| | 62| 6| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 3.98| 3.12| | 3.12| | | | | | | | | | | 7.10| | -Shovels | 7.15| | 7.15| | | | | 23.22| 1.51| 20.18| 31.17| 1.50| 32.67| | | | | | | 0.96| | | | 85.68| | -Total | 7.15| | 7.15| | | | | 23.22| 1.51| 24.16| 34.29| 1.50| 35.79| | | | | | | 0.96| | | | 92.78| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 10.00| 22.50| 5.50| | 13.00| 18.50| 35.00| 12.00| 11.00| | 17.00| 17.00| 10.00| 15.00| 2.20| 15.00| 10.00| 42.20| | 5.45| 12.54| 17.99| 186.19| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 19.65| 10.00| 29.65| 5.50| | 13.00| 18.50| 58.22| 13.51| 35.16| 34.29| 18.50| 52.79| 10.00| 15.00| 2.20| 15.00| 10.00| 42.20| 0.96| 5.45| 12.54| 17.99| 278.97| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 3.51| 1.95| | 1.95| | | | | | | | | | | 5.46| | -Shovels | 4.86| 0.40| 5.25| | 0.31| | 0.31| 13.25| 0.92| 17.48| 29.27| | 29.27| | 0.03| | | | 0.03| | | | | 66.51| | -Total | 4.86| 0.40| 5.25| | 0.31| | 0.31| 13.25| 0.92| 20.99| 31.22| | 31.22| | 0.03| | | | 0.03| | | | | 71.97| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 13.70| 6.99| 20.70| | | 6.82| 6.82| 25.19| 11.49| 8.25| | 9.77| 9.77| 0.97| 16.03| | 15.92| | 31.95| | 4.97| 8.10| 13.07| 128.20| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.56| 7.39| 25.95| | 0.31| 6.82| 7.13| 38.44| 12.41| 29.24| 31.22| 9.77| 40.98| 0.97| 16.06| | 15.92| | 31.98| | 4.97| 8.10| 13.07| 200.17| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 88| 63| | 63| | | | | | | | | | | 77| | -Shovels | 68| | 73| | | | | 57| 61| 87| 94| | 90| | | | | | | | | | | 78| | -Total | 68| | 73| | | | | 57| 61| 87| 91| | 87| | | | | | | | | | | 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 110| 70| 92| | | 52| 37| 72| 96| 75| | 57| 57| 10| 107| | 106| | 76| | 91| 65| 73| 69| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 94| 74| 88| | | 52| 39| 66| 92| 83| 91| 53| 78| 10| 107| | 106| | 76| | 91| 65| 73| 72| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.30| 1.84| | 1.84| | | | | | | | | | | 3.14| | - Shovels | | | | | | | | | | | | 12.80| 12.80| | | | | | | | | | | 12.80| | - Total | | | | | | | | | | 1.30| 1.84| 12.80| 14.64| | | | | | | | | | | 15.94| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 6| 6| | 47| | | | | | | | | | | 22| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 78| 132| 88| | 200| 135| 149| 67| 79| 89| 94| 34| 88| 1| 190| | 435| | 169| | 108| 143| 135| 85| | % Utiln. of Excav.Cap. | 76| 77| 77| | 46| | 46| 65| 65| 87| 92| 85| 89| | 111| | 72| 0| 73| | 60| | 60| 79| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Jan-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | | 93| 93| | 88| 93| 93| 93| 93| | 1| 93| 78| 93| 52| | | 93| 93| | | | - In O B | 93| 93| | | 93| 93| | 88| 77| 93| 93| 93| | 93| 93| | | | | 4| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | | | 2| | | | | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | | | | | | | | | | | | | 26| | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 11154| 12192| 23346| | 2780| 8742| 11522| 26692| 12280| 15400| 11600| 11200| 22800| 4154| 6731| | 1923| 3846| 12500| | 2154| 7385| 9538| 138233| | Actual | 10849| 11608| 22457| | 2997| 11833| 14830| 27171| 9160| 13533| 12834| 5476| 18311| 1800| 10585| | 7015| | 17599| | 1954| 8867| 10821| 135682| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 27500| | 27500| | | | | 89269| 6040| 96640|137160| 6000|143160| | | | | | | 3692| | | | 366302| | Actual | 15661| 1288| 16950| | 998| | 998| 45182| 3583| 67710|100708| |100708| | 86| | | | 86| | | | | 235218| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 10.83| 45.20| 17.84| | 11.53|107.82| 40.12| 10.13| 18.72| 9.18| 8.43| 19.10| 10.12| 0.33| 38.71| | 34.03| | 34.17| | 46.20| 46.05| 46.07| 15.14| | Simple Formula | 15.28| 45.20| 23.23| | 11.53|107.82| 40.12| 17.18| 20.89| 10.80| 6.49| 41.38| 8.68| 0.33| 38.71| | 34.03| | 34.17| | 46.20| 46.05| 46.07| 17.80| | Excavation(Cu.M)| 32.24| 35.15| 33.01| | 11.53| 71.88| 29.44| 40.03| 20.69| 61.22| 55.28| 27.58| 53.54| 0.22| 26.12| | 22.68| | 22.94| | 30.80| 30.70| 30.72| 43.06| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 927| 319| 1246| | 331| 142| 473| 1878| 573| 1558| 2579| 173| 2752| 111| 339| 55| 264| 66| 724| 70| 55| 252| 307| 9692| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 5.45| 12.22| 17.67| | 5.64| 0.16| 5.80| 12.41| 0.77| 18.18| 2.24| 0.12| 2.35| 0.06| 7.89| 0.18| 3.67| 0.17| 11.91| 0.28| 0.25| 1.15| 1.40| 70.83| | - Cost/Cu.M (Rs.) | 0.77| 4.37| 1.79| | 6.07| 0.07| 1.72| 0.67| 0.28| 0.76| 0.07| 0.10| 0.07| 14.00| 3.56| | 2.53| | 3.25| | 0.62| 0.63| 0.63| 0.71| | - Cost/MOR/MTH (Rs.)| 587.8|3830.1|1417.9| |1704.1| 113.9|1226.8| 660.8| 135.1|1166.8| 86.8| 67.4| 85.5| 50.5|2327.0| 319.2|1391.2| 264.5|1645.2| 404.1| 457.8| 455.2| 455.7| 730.9| | PLD Allowance-Rs.Lakhs | 20.87| 7.27| 28.14| | 7.14| 4.07| 11.21| 47.49| 16.22| 59.02| 80.11| 5.20| 85.31| 0.65| 7.34| 0.52| 4.95| 0.58| 13.38| 0.50| 1.08| 4.93| 6.01| 267.95| | - Cost/Cu.M (Rs.) | 2.94| 2.60| 2.84| | 7.69| 1.66| 3.32| 2.56| 5.77| 2.48| 2.37| 4.59| 2.44|163.51| 3.31| | 3.41| | 3.65| | 2.68| 2.69| 2.69| 2.70| | - Cost/MOR/MTH (Rs.)|2250.9|2278.9|2258.0| |2158.6|2862.8|2370.0|2529.0|2831.5|3788.2|3106.2|3006.0|3099.9| 589.2|2164.0| 946.1|1874.2| 878.9|1848.7| 721.2|1966.8|1955.5|1957.5| 2764.6| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.49| 0.38| 0.46| | 0.44| | 0.12| 0.82| 0.51| 0.82| 0.62| 0.57| 0.60| | 0.44| | 0.45| | 0.45| | 2.10| | 0.38| 0.65| | b)Other Equipments | 0.37| 0.45| 0.39| | 0.60| | 0.17| 0.33| 0.51| 0.26| 0.30| 0.40| 0.34| 8.64| 0.40| | 0.49| | 0.45| | 2.13| | 0.38| 0.33| | c)Total | 0.87| 0.83| 0.85| | 1.05| | 0.29| 1.15| 1.02| 1.08| 0.91| 0.97| 0.95| 8.64| 0.84| | 0.95| | 0.90| | 4.22| | 0.76| 0.98| | d)Dumpers(Ltr/CuM/KM) | 0.39| 0.28| | | 0.37| | | 0.27| 0.33| 0.22| 0.27| 0.26| | | 0.21| | 0.20| | | | 1.22| | | | | e)Lubricants -Ltrs | 14380| 5665| 20045| | 4984| | 4984| 62473| 11469| 59785| 39663| 31336| 70999| | 4360| | 5586| | 9946| 311| 7651| | 7651| 361288| | -Ltrs/CuM| 0.02| 0.02| 0.02| | 0.05| | 0.01| 0.03| 0.04| 0.03| 0.02| 0.02| 0.02| | 0.02| | 0.04| | 0.03| | 0.19| | 0.03| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.93| 3.91| 3.92| | 7.95| | 7.95| 3.15| 5.95| 5.95| 5.58| 6.54| 5.84| | 3.76| | 2.57| | 3.18| | 7.56| 7.53| 7.53| 3.86| | Shovel-O B(CuM/Kg)| 2.34| 2.84| 2.37| | 3.61| | 3.61| 1.46| 1.55| 2.54| 2.06| | 2.06| | | | | | | | | | | 2.01| | Dragline -O B(CuM/Kg)| | | | | | | | | |125.09| 1.35| | 1.35| | | | | | | | | | | 3.71| | b)% Cap Sensitive | 61.02| 24.54| 49.91| | 80.00| | 80.00| 11.16| 25.98| 0.76| 1.81| 1.10| 1.64| | 3.85| | 6.33| | 4.75| | 94.01| 94.01| 94.01| 20.86| | c)Total Explosives(T) | 971| 425| 1396| | 20| | 20| 1939| 411| 762| 1637| 498| 2136| | 480| | 273| | 753| | 107| 487| 594| 8012| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Jan-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 110| 110| | 110| | | | | | | | | | | 110| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 79| 90| | 90| | | | | | | | | | | 84| | d)% Utilisation-SSH | | | | | | | | | | 74| 72| | 72| | | | | | | | | | | 73| | -MAH | | | | | | | | | | 93| 80| | 80| | | | | | | | | | | 86| | e)Down time/Hr worked | | | | | | | | | | 0.29| 0.15| | 0.15| | | | | | | | | | | 0.22| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| | 2| 1| 5| | 3| | 3| 31| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| | 2| 1| 5| | 3| | 3| 66| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 76| 77| 77| | 46| | 46| 65| 65| 83| 89| 85| 87| | 111| | 72| | 73| | 60| | 60| 77| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 91| 89| 90| | 90| | 90| 79| 76| 83| 79| 93| 84| | 93| | 72| 60| 79| | 73| | 73| 82| | d)% Utilisation-SSH | 70| 64| 68| | 57| | 57| 55| 57| 62| 61| 73| 66| | 62| | 57| 9| 51| | 56| | 56| 61| | -MAH | 77| 72| 75| | 63| | 63| 70| 75| 74| 78| 79| 78| | 66| | 79| 16| 64| | 77| | 77| 74| | e)Down time/Hr worked | 0.13| 0.17| 0.15| | 0.18| | 0.18| 0.39| 0.43| 0.28| 0.35| 0.10| 0.25| | 0.11| | 0.49| 4.31| 0.42| | 0.49| | 0.49| 0.29| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 7| | 7| | | | | | | | | | | 52| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 28| 16| 44| | 9| | 9| 45| 27| 34| 33| | 33| | 14| | 10| 2| 26| | 19| | 19| 237| | TOTAL | 41| 16| 57| | 9| | 9| 93| 27| 94| 75| 26| 101| | 14| | 10| 2| 26| | 19| | 19| 426| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 82| 86| 83| | 74| | 74| 77| 73| 69| 71| 91| 76| | 83| | 51| 0| 65| | 67| | 67| 75| | c)% Utilisation-SSH | 46| 48| 46| | 36| | 36| 48| 34| 46| 48| 70| 54| | 42| | 40| 0| 38| | 35| | 35| 46| | -MAH | 56| 56| 56| | 49| | 49| 62| 47| 67| 67| 77| 71| | 50| | 78| | 58| | 52| | 52| 62| | f)Down time/Hr worked | 0.38| 0.29| 0.36| | 0.73| | 0.73| 0.47| 0.78| 0.67| 0.61| 0.13| 0.44| | 0.40| | 1.23| | 0.90| | 0.95| | 0.95| 0.55| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 38| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 10| 22| | 3| | 2| 1| 6| 1| 3| | 3| 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 70| 63| 68| | 80| | 80| 64| 84| 47| 78| 62| 71| | 95| | 59| 47| 75| 92| 55| | 55| 66| | c)% Utilisation-SSH | 32| 23| 29| | 28| | 28| 32| 31| 25| 43| 34| 39| | 26| | 25| 17| 24| 10| 22| | 22| 31| | -MAH | 46| 36| 43| | 35| | 35| 51| 37| 53| 55| 55| 55| | 28| | 42| 37| 33| 10| 41| | 41| 48| | f)Down time/Hr worked | 0.93| 1.60| 1.10| | 0.69| | 0.69| 1.12| 0.51| 2.13| 0.51| 1.10| 0.74| | 0.19| | 1.66| 3.07| 1.02| 0.87| 2.01| | 2.01| 1.08| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Jan-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 7| 1| 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 6| 1| 5| 3| 4| 7| | 2| | 1| | 3| | 1| | 1| 30| | TOTAL | 4| 2| 6| | 2| | 2| 12| 3| 12| 10| 8| 18| | 2| | 1| | 3| | 1| | 1| 57| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 24.15| 21.40| 23.37| | 0.00| | 0.00| 35.23| 28.90| 23.10| 26.99| 33.15| 29.95| | 29.24| | 17.81| | 23.52| | 36.72| | 36.72| 28.24| | c)% Availability | 79| 88| 82| | 85| | 85| 84| 85| 70| 77| 79| 78| | 95| | 80| | 90| | 72| | 72| 79| | d)% Utilisation-SSH | 42| 34| 39| | 10| | 10| 30| 19| 26| 33| 38| 35| | 28| | 49| | 35| | 32| | 32| 31| | -MAH | 53| 39| 48| | 12| | 12| 35| 22| 37| 42| 49| 45| | 29| | 61| | 39| | 45| | 45| 39| | e)Down time/Hr worked | 0.50| 0.36| 0.46| | 1.54| | 1.54| 0.54| 0.81| 1.16| 0.69| 0.56| 0.63| | 0.19| | 0.40| | 0.30| | 0.86| | 0.86| 0.68| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| 1| 1| | 1| 1| 3| 1| 1| | 1| 19| | LOADER | 1| 1| 2| | 1| | 1| 6| 2| 1| | 3| 3| | 1| | | | 1| | 1| | 1| 17| | GRADER | 3| 1| 4| | 1| | 1| 8| 3| 5| 6| 4| 10| | 2| | 1| 1| 4| 1| 2| | 2| 38| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 7| 3| 10| | 2| | 2| 1| 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 6| 1| 7| 30| 9| 12| 15| 16| 31| 1| 6| | 4| 3| 13| 3| 6| | 6| 127| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 77| 70| 75| | 83| 0| 70| 77| 71| 75| 72| 61| 67| 91| 89| | 32| 40| 61| 97| 80| | 80| 71| | c)% Utilisation-SSH | 32| 25| 29| | 19| 0| 16| 32| 29| 46| 38| 22| 30| 26| 32| | 19| 6| 22| 3| 26| | 26| 29| | -MAH | 41| 35| 39| | 23| 100| 23| 42| 41| 62| 53| 36| 45| 28| 36| | 60| 14| 37| 3| 33| | 33| 41| | d)Down time/Hr worked | 0.74| 1.19| 0.86| | 0.89|743.00| 1.91| 0.72| 0.98| 0.55| 0.74| 1.77| 1.12| | 0.36| | 3.57| 10.91| 1.77| | 0.77| | 0.77| 1.02| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 67| 29| 96| | 21| 1| 22| 168| 47| 143| 124| 66| 190| 1| 27| | 19| 7| 53| 4| 32| | 32| 756| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 82| 81| | 80| 0| 76| 76| 75| 69| 73| 79| 75| 91| 87| | 52| 32| 68| 96| 69| | 69| 75| | c)% Utilisation-SSH | 45| 43| 44| | 30| 0| 29| 43| 34| 44| 46| 51| 48| 26| 38| | 36| 6| 34| 5| 34| | 34| 43| | -MAH | 55| 52| 54| | 38| 100| 38| 57| 46| 64| 64| 64| 64| 28| 44| | 70| 19| 50| 5| 49| | 49| 57| | d)Down time/Hr worked | 0.42| 0.43| 0.42| | 0.67|743.00| 0.85| 0.55| 0.73| 0.70| 0.58| 0.42| 0.52| | 0.33| | 1.34| 10.98| 0.95| | 0.91| | 0.91| 0.59| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | | 4.81| 3.79| | 3.79| | | | | | | | | | | 8.60| |b)Shovels(LCu.M)-Cap. | 8.93| 3.63| 12.55| | 2.00| | 2.00| 29.21| 4.26| 24.30| 22.00| 16.32| 38.32| | 2.00| | 2.00| 1.00| 5.00| | 3.00| | 3.00| 118.64| | -OB | 4.85| 0.40| 5.25| | 0.31| | 0.31| 13.25| 0.92| 17.48| 16.91| 12.80| 29.71| | 0.03| | | | 0.03| | | | | 66.95| | -Coal(LT) | 2.95| 3.60| 6.55| | 0.93| | 0.93| 8.42| 2.75| 4.20| 3.98| 1.70| 5.68| | 3.28| | 2.17| | 5.46| | 2.69| | 2.69| 36.66| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month S.No Mine Eqpt Make Mfg Sl.No 1. PK.OC Loader TATA 02728 2. KTK OC 1.0 Cu.M.Support Shovel Telco 11589 List of Surveyed Off HEMM during the month S.No Mine Eqpt Make Mfg Sl.No - N I L - List of Eqpt tranfered between the mines S.No From Mine To Mine Eqpt Make Mfg Sl.No 1. KRG OC RK OC 1.0 Cu.M.Support Shovel Telcon 07789 2. DOR OC1 KRG OC 150mm Drill Atlas Capco 06681 3. DOR OC1 DOR OC2 Grader BEML 06518 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Dec-2011 12.00 NOON OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.90| 3.17| 6.07| | 0.72| 2.80| 3.52| 6.68| 3.20| 4.00| 2.90| 2.80| 5.70| 1.08| 1.75| | 0.50| 1.00| 3.25| | 0.56| 1.92| 2.48| 35.98| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.90| 3.17| 6.07| | 0.72| 2.80| 3.52| 6.68| 3.20| 4.00| 2.90| 2.80| 5.70| 1.08| 1.75| | 0.50| 1.00| 3.25| | 0.56| 1.92| 2.48| 35.98| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.60| 3.79| 6.38| | 0.76| 3.62| 4.38| 7.20| 2.91| 3.81| 4.56| 0.33| 4.89| 0.02| 2.88| | 1.79| | 4.67| | 0.43| 2.82| 3.25| 37.51| | - Contractor | | 0.41| 0.41| | | | | 1.65| 0.05| | | 1.26| 1.26| | | | | | | | 0.20| | 0.20| 3.58| | - Total | 2.60| 4.20| 6.80| | 0.76| 3.62| 4.38| 8.85| 2.96| 3.81| 4.56| 1.59| 6.15| 0.02| 2.88| | 1.79| | 4.67| | 0.63| 2.82| 3.44| 41.08| | % Achievement | 90| 132| 112| | 106| 129| 124| 132| 92| 95| 157| 57| 108| 2| 165| | 359| | 144| | 112| 147| 139| 114| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | | | | | | | | 1.38| | | | 0.15| 1.52| | | | | | | | 2.38| | 2.38| 3.90| | % Rehandle in Total | | | | | | | | 19| | | | 44| 31| | | | | | | | 554| | 73| 10| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 4.13| 3.25| | 3.25| | | | | | | | | | | 7.38| | -Shovels | 7.15| | 7.15| | | | | 22.52| 1.57| 20.98| 32.42| 1.50| 33.92| | | | | | | 0.96| | | | 87.10| | -Total | 7.15| | 7.15| | | | | 22.52| 1.57| 25.11| 35.67| 1.50| 37.17| | | | | | | 0.96| | | | 94.48| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 10.00| 22.50| 5.50| | 13.00| 18.50| 35.00| 12.00| 11.00| | 17.00| 17.00| 9.20| 14.00| 2.20| 13.00| 10.00| 39.20| | 5.45| 12.54| 17.99| 182.39| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 19.65| 10.00| 29.65| 5.50| | 13.00| 18.50| 57.52| 13.57| 36.11| 35.67| 18.50| 54.17| 9.20| 14.00| 2.20| 13.00| 10.00| 39.20| 0.96| 5.45| 12.54| 17.99| 276.87| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 2.60| 1.97| | 1.97| | | | | | | | | | | 4.57| | -Shovels | 3.80| 0.46| 4.26| | 0.29| | 0.29| 13.54| 0.76| 15.90| 29.24| | 29.24| | 0.05| | | | 0.05| | | | | 64.03| | -Total | 3.80| 0.46| 4.26| | 0.29| | 0.29| 13.54| 0.76| 18.50| 31.21| | 31.21| | 0.05| | | | 0.05| | | | | 68.60| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 13.10| 7.42| 20.52| | | 5.98| 5.98| 27.79| 11.00| 8.13| | 9.48| 9.48| 0.31| 13.07| | 14.29| | 27.37| | 5.50| 8.98| 14.48| 125.06| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 16.90| 7.88| 24.78| | 0.29| 5.98| 6.27| 41.33| 11.76| 26.63| 31.21| 9.48| 40.69| 0.31| 13.12| | 14.29| | 27.41| | 5.50| 8.98| 14.48| 193.67| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 63| 61| | 61| | | | | | | | | | | 62| | -Shovels | 53| | 60| | | | | 60| 48| 76| 90| | 86| | | | | | | | | | | 74| | -Total | 53| | 60| | | | | 60| 48| 74| 88| | 84| | | | | | | | | | | 73| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 105| 74| 91| | | 46| 32| 79| 92| 74| | 56| 56| 3| 93| | 110| | 70| | 101| 72| 80| 69| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 86| 79| 84| | | 46| 34| 72| 87| 74| 88| 51| 75| 3| 94| | 110| | 70| | 101| 72| 80| 70| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.04| 1.96| | 1.96| | | | | | | | | | | 3.00| | - Shovels | | | | | | | | | | 0.28| | 12.94| 12.94| | | | | 0.03| 0.03| | | | | 13.25| | - Total | | | | | | | | | | 1.32| 1.96| 12.94| 14.90| | | | | 0.03| 0.03| | | | | 16.25| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 7| 6| | 48| | | | | | 63| | | | | 24| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 61| 141| 76| | 166| 129| 137| 68| 73| 76| 91| 6| 84| 2| 169| | 359| | 146| | 77| 147| 131| 79| | % Utiln. of Excav.Cap. | 62| 81| 67| | 40| | 40| 66| 60| 79| 95| 82| 90| | 98| | 60| 3| 64| | 64| | 64| 76| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Dec-2011 12.00 NOON OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 90| | | 78| 90| | 90| 90| 90| 90| 90| | 6| 90| 78| 90| 52| | | 90| 90| | | | - In O B | 90| 90| | | 78| 90| | 90| 77| 90| 90| 90| | 29| 90| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | | | | | | | | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | | | | | | | | | | | | | 26| | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 11154| 12192| 23346| | 2769| 9333| 12103| 22267| 12308| 15385| 11154| 10769| 21923| 4154| 6731| | 1923| 3846| 12500| | 2154| 7385| 9538| 133523| | Actual | 8662| 12619| 21281| | 2940| 12053| 14993| 23996| 9689| 12699| 15193| 1093| 16286| 1050| 9605| | 5977| | 15582| | 1433| 9393| 10826| 126402| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 27500| | 27500| | | | | 75067| 6038| 96577|137192| 5769|142962| | | | | | | 3692| | | | 351836| | Actual | 12658| 1538| 14196| | 1108| | 1108| 45137| 2945| 61667|104043| |104043| | 158| | | | 158| | | | | 229254| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 8.85| 51.17| 17.36| | 10.21|117.44| 41.45| 10.71| 19.22| 8.52| 8.78| 5.13| 8.38| 1.16| 36.31| | 30.08| | 30.76| | 47.55| 46.59| 46.72| 14.61| | Simple Formula | 12.38| 51.17| 22.49| | 10.21|117.44| 41.45| 16.64| 22.85| 10.29| 7.65| 11.11| 7.82| 1.16| 36.31| | 30.08| | 28.81| | 47.55| 46.59| 46.72| 17.17| | Excavation(Cu.M)| 26.34| 40.35| 29.99| | 10.65| 78.29| 30.36| 42.40| 21.18| 56.81| 57.51| 7.41| 55.14| 0.77| 24.81| | 20.05| | 19.50| | 31.70| 31.06| 31.14| 42.85| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 938| 309| 1247| | 326| 141| 467| 1872| 564| 1559| 2637| 130| 2767| 114| 338| 75| 262| 54| 729| 67| 39| 265| 304| 9690| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 7.72| 11.97| 19.69| | 6.56| 0.15| 6.71| 13.11| 1.06| 15.41| 2.72| 0.18| 2.90| 0.13| 8.76| 0.15| 4.21| 0.11| 13.24| 0.06| 0.40| 2.68| 3.08| 75.38| | - Cost/Cu.M (Rs.) | 1.40| 4.01| 2.31| | 8.22| 0.06| 2.09| 0.71| 0.39| 0.73| 0.08| 0.82| 0.08| 8.95| 4.45| | 3.52| | 4.18| | 1.40| 1.43| 1.42| 0.81| | - Cost/MOR/MTH (Rs.)| 822.9|3873.7|1578.9| |2011.4| 104.9|1435.8| 700.5| 187.2| 988.8| 103.1| 137.7| 104.7| 110.0|2591.6| 205.5|1607.4| 207.8|1815.8| 86.9|1028.1|1012.6|1014.6| 777.9| | PLD Allowance-Rs.Lakhs | 20.12| 6.61| 26.74| | 5.45| 2.99| 8.44| 45.19| 12.36| 45.24| 62.68| 3.02| 65.70| 0.68| 6.73| 0.53| 4.72| 0.36| 12.34| 0.35| 0.83| 5.53| 6.36| 223.39| | - Cost/Cu.M (Rs.) | 3.64| 2.21| 3.14| | 6.83| 1.24| 2.63| 2.46| 4.59| 2.15| 1.83| 13.83| 1.91| 48.34| 3.42| | 3.94| | 3.90| | 2.89| 2.95| 2.94| 2.39| | - Cost/MOR/MTH (Rs.)|2145.4|2139.9|2144.0| |1672.0|2118.3|1806.8|2414.1|2191.9|2901.9|2376.8|2325.3|2374.4| 593.6|1991.5| 707.7|1799.9| 664.1|1692.2| 515.4|2120.3|2088.3|2092.4| 2305.3| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.50| 0.27| 0.42| | 0.52| | 0.13| 0.77| 0.44| 0.84| 0.56| 0.62| 0.60| | | | 0.51| | 0.19| | 3.71| | 0.49| 0.63| | b)Other Equipments | 0.41| 0.39| 0.40| | 0.68| | 0.17| 0.31| 0.50| 0.25| 0.28| 0.39| 0.34| | 0.01| | 0.53| | 0.24| | 3.14| | 0.42| 0.32| | c)Total | 0.91| 0.66| 0.82| | 1.20| | 0.30| 1.08| 0.94| 1.09| 0.84| 1.01| 0.94| | 0.01| | 1.04| | 0.43| | 6.85| | 0.91| 0.95| | d)Dumpers(Ltr/CuM/KM) | 0.39| 0.21| | | 0.40| | | 0.31| 0.31| 0.23| 0.14| 16.89| | | | | 0.23| | | | 1.92| | | | | e)Lubricants -Ltrs | 13747| 9237| 22984| | 5608| | 5608| 49484| 9793| 54330| 32002| 28480| 60482| | 3956| 120| 6995| 306| 11377| 270| 9358| | 9358| 333495| | -Ltrs/CuM| 0.02| 0.03| 0.03| | 0.07| | 0.02| 0.03| 0.04| 0.03| 0.02| 0.02| 0.02| | 0.02| | 0.06| | 0.04| | 0.33| | 0.04| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 4.98| 5.66| 5.36| | 31.76| | 31.76| 3.33| 4.68| 7.04| 7.49| 3.78| 7.03| | 3.50| | 2.53| | 3.05| | 5.77| 5.66| 5.67| 4.13| | Shovel-O B(CuM/Kg)| 1.68| 3.07| 1.77| | 13.44| | 13.44| 1.94| 3.05| 3.13| 1.90| | 1.88| | | | | | | | | | | 2.11| | Dragline -O B(CuM/Kg)| | | | | | | | | | 1.52| 3.07| | 3.07| | | | | | | | | | | 1.94| | b)% Cap Sensitive | 52.39| 24.22| 43.58| | 64.84| | 64.84| 18.59| 22.70| 0.73| 2.81| 2.01| 2.64| | 4.82| | 6.99| | 5.63| | 92.80| 92.80| 92.80| 22.02| | c)Total Explosives(T) | 830| 378| 1208| | 5| | 5| 1718| 383| 734| 1667| 447| 2114| | 347| | 208| | 555| | 83| 554| 636| 7352| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Dec-2011 12.00 NOON OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 83| 114| | 114| | | | | | | | | | | 97| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 71| 90| | 90| | | | | | | | | | | 81| | d)% Utilisation-SSH | | | | | | | | | | 64| 72| | 72| | | | | | | | | | | 68| | -MAH | | | | | | | | | | 90| 79| | 79| | | | | | | | | | | 84| | e)Down time/Hr worked | | | | | | | | | | 0.46| 0.13| | 0.13| | | | | | | | | | | 0.28| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| | 2| 1| 5| | 3| | 3| 31| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| | 2| 1| 5| | 3| | 3| 66| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 62| 81| 67| | 40| | 40| 66| 60| 78| 92| 82| 88| | 98| | 60| 3| 64| | 64| | 64| 75| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 88| 88| 88| | 90| | 90| 82| 68| 84| 85| 93| 87| | 93| | 80| 52| 80| | 92| | 92| 84| | d)% Utilisation-SSH | 66| 67| 66| | 55| | 55| 55| 55| 63| 65| 72| 67| | 68| | 51| 12| 51| | 65| | 65| 61| | -MAH | 75| 76| 75| | 61| | 61| 68| 80| 75| 77| 78| 77| | 73| | 63| 23| 63| | 71| | 71| 73| | e)Down time/Hr worked | 0.18| 0.18| 0.18| | 0.17| | 0.17| 0.33| 0.59| 0.25| 0.24| 0.10| 0.19| | 0.11| | 0.39| 4.03| 0.38| | 0.13| | 0.13| 0.26| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 7| | 7| | | | | | | | | | | 52| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 28| 16| 44| | 9| | 9| 45| 27| 34| 33| | 33| | 14| | 10| 2| 26| | 19| | 19| 237| | TOTAL | 41| 16| 57| | 9| | 9| 93| 27| 94| 75| 26| 101| | 14| | 10| 2| 26| | 19| | 19| 426| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 83| 75| 81| | 77| | 77| 76| 81| 69| 71| 94| 77| | 85| | 51| 0| 66| | 74| | 74| 75| | c)% Utilisation-SSH | 42| 48| 43| | 36| | 36| 49| 33| 45| 46| 70| 52| | 40| | 41| 0| 38| | 40| | 40| 46| | -MAH | 50| 64| 54| | 46| | 46| 64| 40| 65| 64| 75| 68| | 47| | 80| | 57| | 54| | 54| 61| | f)Down time/Hr worked | 0.41| 0.52| 0.44| | 0.64| | 0.64| 0.49| 0.57| 0.71| 0.64| 0.09| 0.44| | 0.37| | 1.19| | 0.90| | 0.66| | 0.66| 0.55| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 38| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 10| 22| | 3| | 2| 1| 6| 1| 3| | 3| 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 73| 70| 72| | 81| | 81| 59| 77| 53| 76| 66| 71| | 97| 91| 58| 93| 82| 92| 71| | 71| 67| | c)% Utilisation-SSH | 31| 27| 30| | 30| | 30| 31| 32| 24| 38| 30| 35| | 31| 15| 17| 18| 24| 18| 26| | 26| 30| | -MAH | 42| 39| 41| | 37| | 37| 54| 41| 46| 50| 46| 48| | 32| 16| 30| 19| 29| 19| 36| | 36| 45| | f)Down time/Hr worked | 0.86| 1.10| 0.93| | 0.65| | 0.65| 1.31| 0.74| 1.92| 0.63| 1.12| 0.82| | 0.11| 0.60| 2.49| 0.38| 0.75| 0.47| 1.12| | 1.12| 1.10| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Dec-2011 12.00 NOON OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 7| 1| 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 6| 1| 5| 3| 4| 7| | 1| | 2| | 3| | 1| | 1| 30| | TOTAL | 4| 2| 6| | 2| | 2| 12| 3| 12| 10| 8| 18| | 1| | 2| | 3| | 1| | 1| 57| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 24.57| 20.41| 23.44| | 0.00| | 0.00| 31.21| 25.04| 24.83| 28.39| 35.16| 31.42| | 24.18| | 21.76| | 23.22| | 39.54| | 39.54| 28.42| | c)% Availability | 73| 87| 78| | 91| | 91| 86| 81| 72| 87| 74| 81| | 94| | 71| | 79| | 93| | 93| 80| | d)% Utilisation-SSH | 37| 28| 34| | 7| | 7| 30| 19| 22| 33| 36| 34| | 56| | 20| | 32| | 25| | 25| 29| | -MAH | 50| 32| 43| | 8| | 8| 35| 23| 31| 38| 48| 42| | 59| | 28| | 41| | 27| | 27| 36| | e)Down time/Hr worked | 0.72| 0.48| 0.66| | 1.16| | 1.16| 0.45| 1.03| 1.25| 0.40| 0.73| 0.55| | 0.11| | 1.49| | 0.66| | 0.30| | 0.30| 0.68| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| | 1| 1| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| | 1| | 1| 5| 2| 1| | 3| 3| | 1| | | | 1| | 1| | 1| 16| | GRADER | 3| 1| 4| | 1| | 1| 8| 3| 5| 6| 4| 10| | 2| | 2| | 4| 1| 2| | 2| 38| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 7| 3| 10| | 2| | 2| 1| 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 6| 1| 7| 29| 9| 12| 15| 16| 31| | 7| | 5| 2| 14| 2| 6| | 6| 125| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 77| 77| 77| | 84| 0| 71| 76| 64| 68| 79| 70| 74| | 95| 78| 51| 61| 77| 100| 78| | 78| 75| | c)% Utilisation-SSH | 31| 26| 30| | 16| 0| 14| 30| 27| 43| 38| 20| 29| | 21| 4| 22| 7| 20| 0| 23| | 23| 27| | -MAH | 41| 34| 38| | 19| 100| 19| 39| 42| 63| 48| 29| 39| | 23| 5| 44| 11| 26| 0| 29| | 29| 36| | d)Down time/Hr worked | 0.72| 0.87| 0.76| | 0.95|719.00| 2.05| 0.81| 1.35| 0.73| 0.55| 1.50| 0.89| | 0.25| 5.80| 2.18| 5.67| 1.19| | 0.95| | 0.95| 0.94| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 67| 29| 96| | 21| 1| 22| 167| 47| 143| 124| 66| 190| | 27| | 21| 6| 54| 3| 32| | 32| 754| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 77| 80| | 82| 0| 78| 75| 76| 69| 75| 82| 78| | 90| 85| 57| 31| 73| 97| 77| | 77| 76| | c)% Utilisation-SSH | 41| 43| 42| | 29| 0| 28| 43| 33| 43| 45| 49| 46| | 37| 9| 33| 5| 32| 6| 37| | 37| 41| | -MAH | 51| 56| 52| | 35| 100| 35| 57| 43| 62| 60| 60| 60| | 41| 11| 59| 16| 45| 6| 49| | 49| 55| | d)Down time/Hr worked | 0.45| 0.52| 0.48| | 0.61|719.00| 0.79| 0.57| 0.72| 0.73| 0.55| 0.37| 0.49| | 0.28| 1.60| 1.30| 13.45| 0.84| | 0.62| | 0.62| 0.58| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | | 3.64| 3.93| | 3.93| | | | | | | | | | | 7.57| |b)Shovels(LCu.M)-Cap. | 8.94| 3.67| 12.62| | 2.00| | 2.00| 29.18| 4.50| 24.00| 22.00| 16.24| 38.24| | 2.00| | 2.00| 1.00| 5.00| | 2.92| | 2.92| 118.46| | -OB | 3.80| 0.46| 4.26| | 0.29| | 0.29| 13.54| 0.74| 16.18| 17.23| 12.94| 30.17| | 0.05| | | 0.03| 0.08| | | | | 65.25| | -Coal(LT) | 2.59| 3.79| 6.38| | 0.76| | 0.76| 8.58| 2.91| 3.80| 4.56| 0.47| 5.03| | 2.88| | 1.79| | 4.67| | 2.81| | 2.81| 34.94| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month S.No Mine Eqpt Make Mfg Sl.No 1. PK.OC Grader VOLVO 08020 List of Surveyed Off HEMM during the month S.No Mine Eqpt Make Mfg Sl.No - N I L - List of Eqpt tranfered between the mines S.No From Mine To Mine Eqpt Make Mfg Sl.No 1. GK. OC JVR OC 35T Dumper BEML 01206 2. " " " " 35T Dumper BEML 01207 3. RG.OC3 RK. OC Grader BEML 03050 4. RG.OC1 RG.OC2 250mm Drill Atlas 10181 5. BPA OC DOR OC2 2.8 Cu.M. Shovel L&T 00451 6. " " " " Water Tanker BEML 00204 7. " " " " 155 Dozer BEML 12650 8. " " DOR OC1 35T Dumper HM 00310 9. " " " " 35T Dumper HM 00311 10. RK. OC SRP OC1 3.0 Cu.M. Shovel L&T TB-544 11. " " SRP OC1 35T Dumper HM 00761 12. " " SRP OC1 35T Dumper HM 00764 13. " " SRP OC1 35T Dumper HM 00765 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Nov-2011 4.30 PM OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.68| 3.01| 5.69| | 0.67| 2.64| 3.31| 6.35| 2.83| 3.56| 2.90| 2.80| 5.70| 1.04| 1.75| | 0.50| 1.00| 3.25| | 0.52| 1.80| 2.32| 34.05| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.68| 3.01| 5.69| | 0.67| 2.64| 3.31| 6.35| 2.83| 3.56| 2.90| 2.80| 5.70| 1.04| 1.75| | 0.50| 1.00| 3.25| | 0.52| 1.80| 2.32| 34.05| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.48| 2.74| 5.23| | 0.60| 2.73| 3.33| 4.86| 1.41| 1.74| 2.10| 0.21| 2.32| 0.07| 1.30| | 0.74| | 2.03| | 0.28| 0.99| 1.27| 22.26| | - Contractor | | | | | | | | 3.03| 0.26| | | 0.47| 0.47| | | | | | | | 0.04| | 0.04| 3.81| | - Total | 2.48| 2.74| 5.23| | 0.60| 2.73| 3.33| 7.89| 1.67| 1.74| 2.10| 0.69| 2.79| 0.07| 1.30| | 0.74| | 2.03| | 0.32| 0.99| 1.32| 26.06| | % Achievement | 93| 91| 92| | 90| 103| 101| 124| 59| 49| 73| 25| 49| 7| 74| | 148| | 63| | 62| 55| 57| 77| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.89| 0.53| 1.43| | | | | 1.95| | | | | 1.95| | 0.00| | | | 0.00| | 0.99| | 0.99| 4.37| | % Rehandle in Total | 36| 19| 27| | | | | 40| | | | | 84| | 0| | | | 0| | 354| | 78| 20| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 3.65| 2.87| | 2.87| | | | | | | | | | | 6.52| | -Shovels | 6.60| | 6.60| | | | | 22.52| 1.39| 18.57| 28.68| 1.50| 30.18| | | | | | | 0.88| | | | 80.14| | -Total | 6.60| | 6.60| | | | | 22.52| 1.39| 22.22| 31.55| 1.50| 33.05| | | | | | | 0.88| | | | 86.66| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 8.00| 10.00| 18.00| 5.50| | 13.00| 18.50| 35.00| 10.00| 10.00| | 16.00| 16.00| 7.00| 14.00| 2.00| 10.00| 10.05| 36.05| | 5.45| 12.54| 17.99| 168.54| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 14.60| 10.00| 24.60| 5.50| | 13.00| 18.50| 57.52| 11.39| 32.22| 31.55| 17.50| 49.05| 7.00| 14.00| 2.00| 10.00| 10.05| 36.05| 0.88| 5.45| 12.54| 17.99| 255.20| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 1.65| 1.04| | 1.04| | | | | | | | | | | 2.69| | -Shovels | 3.20| 0.39| 3.59| | 0.26| | 0.26| 13.54| 0.42| 6.90| 14.16| | 14.16| | 0.01| 0.08| | | 0.09| | | | | 38.96| | -Total | 3.20| 0.39| 3.59| | 0.26| | 0.26| 13.54| 0.42| 8.55| 15.20| | 15.20| | 0.01| 0.08| | | 0.09| | | | | 41.65| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 10.09| 7.36| 17.45| | | 6.63| 6.63| 26.31| 7.50| 4.31| | 6.43| 6.43| 0.12| 5.84| | 8.61| | 14.45| | 3.58| 5.83| 9.41| 92.60| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 13.29| 7.75| 21.04| | 0.26| 6.63| 6.89| 39.85| 7.92| 12.86| 15.20| 6.43| 21.62| 0.12| 5.85| 0.08| 8.61| | 14.54| | 3.58| 5.83| 9.41| 134.25| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 45| 36| | 36| | | | | | | | | | | 41| | -Shovels | 49| | 54| | | | | 60| 30| 37| 49| | 47| | | | | | | | | | | 49| | -Total | 49| | 54| | | | | 60| 30| 38| 48| | 46| | | | | | | | | | | 48| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 126| 74| 97| | | 51| 36| 75| 75| 43| | 40| 40| 2| 42| | 86| | 40| | 66| 47| 52| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 91| 77| 86| | | 51| 37| 69| 70| 40| 48| 37| 44| 2| 42| 4| 86| | 40| | 66| 47| 52| 53| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 0.80| 0.75| | 0.75| | | | | | | | | | | 1.55| | - Shovels | | | | | | | | | | 0.15| | 6.73| 6.73| | | | | | | | | | | 6.88| | - Total | | | | | | | | | | 0.95| 0.75| 6.73| 7.48| | | | | | | | | | | 8.43| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 11| 5| | 49| | | | | | | | | | | 20| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 58| 110| 68| | 148| 103| 112| 63| 41| 39| 50| 4| 45| 7| 75| | 148| | 67| | 54| 55| 55| 52| | % Utiln. of Excav.Cap. | 60| 72| 64| | 33| | 33| 62| 32| 38| 42| 42| 42| | 44| 8| 25| | 29| 0| 42| | 42| 47| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Nov-2011 4.30 PM OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 93| | | 72| 86| | 81| 39| 42| 42| 46| | 24| 42| 33| 51| 22| | | 42| 42| | | | - In O B | 90| 93| | | 72| 86| | 81| 39| 42| 42| 48| | 25| 42| 33| | | | 33| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | | | 3| | | | | | | | | | | | | | | | | | - Strikes | 3| | | | | | | | 36| 48| 36| 32| | 39| 39| 39| 39| 39| | 39| 39| 39| | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | 4| | | | | | | | | | | | 11| | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 11167| 12542| 23708| | 2771| 8800| 11571| 22679| 12304| 15478| 12609| 12174| 24783| 4333| 7292| | 2083| 4167| 13542| | 2167| 7500| 9667| 138065| | Actual | 8279| 8850| 17129| | 2481| 9531| 12012| 18000| 10815| 12433| 15027| 1387| 16414| 912| 9255| | 4346| | 13601| | 2002| 7094| 9096| 110411| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 27500| | 27500| | | | | 80429| 6043| 96609|137174| 6522|143696| | | | | | | 3667| | | | 357943| | Actual | 10681| 1244| 11925| | 1076| | 1076| 50148| 3234| 61071|108561| |108561| | 104| 731| | | 835| | | | | 236850| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 7.44| 35.30| 12.70| | 7.48| 88.57| 30.11| 9.05| 15.81| 7.01| 7.44| 7.07| 7.41| 4.11| 29.39| | 21.39| | 21.48| | 31.74| 31.72| 31.73| 11.96| | Simple Formula | 11.30| 35.30| 17.57| | 7.48| 88.57| 30.11| 10.43| 18.08| 8.37| 6.18| 15.31| 6.54| 4.11| 29.39| | 21.39| | 21.48| | 31.74| 31.72| 31.73| 13.36| | Excavation(Cu.M)| 22.11| 28.49| 23.78| | 8.22| 59.04| 22.41| 36.01| 17.46| 46.71| 48.79| 10.21| 47.28| 2.74| 19.92| 5.07| 14.26| | 15.32| | 21.16| 21.15| 21.15| 33.90| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 917| 305| 1222| | 322| 142| 464| 1887| 566| 1557| 2683| 109| 2792| 114| 332| 119| 261| 24| 736| 67| 66| 233| 299| 9704| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 5.73| 10.98| 16.70| | 7.37| 0.11| 7.48| 10.29| 1.43| 3.53| 8.50| 0.30| 8.80| 0.09| 2.12| 0.19| 2.62| 0.05| 4.96| 0.14| 0.32| 1.13| 1.45| 54.88| | - Cost/Cu.M (Rs.) | 1.18| 4.96| 2.36| | 11.25| 0.06| 3.02| 0.61| 1.05| 0.36| 0.51| 2.11| 0.53| 1.89| 2.41| 2.30| 5.31| | 3.42| | 1.70| 1.70| 1.70| 0.97| | - Cost/MOR/MTH (Rs.)| 624.4|3598.4|1366.7| |2289.2| 74.4|1611.4| 545.4| 252.7| 227.0| 316.7| 275.0| 315.1| 80.6| 637.1| 155.7|1002.3| 202.1| 674.6| 210.1| 482.0| 484.1| 483.6| 565.5| | PLD Allowance-Rs.Lakhs | 22.70| 7.42| 30.12| | 5.91| 2.71| 8.63| 54.50| 7.60| 25.81| 34.36| 1.37| 35.73| 0.60| 4.23| 0.99| 2.92| 0.05| 8.18| 0.49| 0.78| 2.76| 3.54| 175.20| | - Cost/Cu.M (Rs.) | 4.67| 3.35| 4.26| | 9.03| 1.49| 3.48| 3.25| 5.60| 2.66| 2.07| 9.67| 2.13| 12.37| 4.81| 12.26| 5.94| | 5.64| | 4.17| 4.17| 4.17| 3.10| | - Cost/MOR/MTH (Rs.)|2475.5|2431.6|2464.6| |1836.4|1911.3|1859.3|2888.3|1342.2|1657.9|1280.7|1258.4|1279.8| 527.7|1272.8| 828.4|1120.3| 192.6|1111.7| 727.9|1180.2|1185.2|1184.1| 1805.4| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.58| 0.43| 0.53| | 0.53| | 0.14| 0.80| 0.46| 0.84| 0.56| 0.58| 0.57| | 0.45| 0.30| 0.52| | 0.47| | 2.48| | 0.55| 0.65| | b)Other Equipments | 0.46| 0.51| 0.48| | 0.77| | 0.20| 0.34| 0.50| 0.29| 0.31| 0.37| 0.34| | 0.46| 0.80| 0.56| | 0.52| | 1.89| | 0.42| 0.35| | c)Total | 1.04| 0.94| 1.01| | 1.31| | 0.35| 1.15| 0.96| 1.13| 0.87| 0.95| 0.91| | 0.91| 1.10| 1.09| | 0.98| | 4.36| | 0.96| 1.01| | d)Dumpers(Ltr/CuM/KM) | 0.41| 0.34| | | 0.41| | | 0.31| 0.33| 0.23| 0.13| 11.80| | | 0.20| 0.30| 0.22| | | | 1.27| | | | | e)Lubricants -Ltrs | 19597| 6788| 26385| | 2940| | 2940| 52257| 4821| 25118| 14459| 9072| 23531| | 2536| 340| 1783| | 4659| 650| 2548| | 2548| 202972| | -Ltrs/CuM| 0.04| 0.03| 0.04| | 0.04| | 0.01| 0.03| 0.04| 0.03| 0.02| 0.01| 0.01| | 0.03| 0.04| 0.04| | 0.03| | 0.14| | 0.03| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.25| 3.79| 3.52| | 19.05| | 19.05| 3.42| 6.37| 6.72| 4.15| | 4.57| | 3.41| | 2.17| | 2.83| | 3.75| 4.22| 4.11| 3.39| | Shovel-O B(CuM/Kg)| 1.83| 5.78| 1.97| | 3.04| | 3.04| 1.83| 1.24| 3.19| 2.45| | 2.44| | | | | | | | | | | 2.21| | Dragline -O B(CuM/Kg)| | | | | | | | | | 0.86| 1.91| | 1.91| | | | | | | | | | | 1.09| | b)% Cap Sensitive | 29.67| 27.30| 28.72| | 15.91| | 15.91| 21.03| 15.65| 2.71| 3.50| 0.00| 2.63| | 4.54| | 8.13| | 5.71| | 85.21| 72.57| 76.91| 18.11| | c)Total Explosives(T) | 724| 485| 1209| | 12| | 12| 1757| 358| 434| 683| 224| 907| | 176| | 86| | 261| | 40| 77| 118| 5056| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Nov-2011 4.30 PM OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 56| 52| | 52| | | | | | | | | | | 54| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 94| 95| | 95| | | | | | | | | | | 95| | d)% Utilisation-SSH | | | | | | | | | | 43| 31| | 31| | | | | | | | | | | 36| | -MAH | | | | | | | | | | 45| 33| | 33| | | | | | | | | | | 38| | e)Down time/Hr worked | | | | | | | | | | 0.14| 0.15| | 0.15| | | | | | | | | | | 0.14| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| 1| 2| | 5| 1| 2| | 2| 31| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| 1| 2| | 5| 1| 2| | 2| 66| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 60| 72| 64| | 33| | 33| 62| 32| 34| 41| 42| 42| | 44| 8| 25| | 29| | 42| | 42| 46| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 87| 87| 87| | 92| | 92| 80| 71| 84| 80| 97| 86| | 97| 89| 93| | 94| 96| 95| | 95| 85| | d)% Utilisation-SSH | 59| 64| 61| | 52| | 52| 54| 28| 37| 32| 44| 36| | 33| 17| 25| | 27| 2| 41| | 41| 44| | -MAH | 67| 74| 70| | 57| | 57| 67| 40| 44| 40| 45| 42| | 34| 19| 27| | 29| 2| 43| | 43| 51| | e)Down time/Hr worked | 0.21| 0.21| 0.21| | 0.16| | 0.16| 0.37| 1.04| 0.42| 0.62| 0.07| 0.37| | 0.08| 0.63| 0.27| | 0.22| 2.40| 0.11| | 0.11| 0.35| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 7| | 7| | | | | | | | | | | 52| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 30| 14| 44| | 9| | 9| 45| 27| 34| 33| | 33| | 14| 2| 8| 2| 26| 3| 16| | 16| 237| | TOTAL | 43| 14| 57| | 9| | 9| 93| 27| 94| 75| 26| 101| | 14| 2| 8| 2| 26| 3| 16| | 16| 426| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 75| 82| | 77| | 77| 77| 86| 65| 71| 92| 77| | 90| 98| 63| 0| 76| 96| 79| | 79| 76| | c)% Utilisation-SSH | 40| 49| 42| | 32| | 32| 46| 16| 23| 23| 40| 27| | 19| 13| 21| 0| 18| 2| 21| | 21| 31| | -MAH | 47| 66| 51| | 42| | 42| 59| 19| 34| 32| 43| 36| | 21| 13| 33| 100| 24| 2| 27| | 27| 41| | f)Down time/Hr worked | 0.41| 0.51| 0.44| | 0.70| | 0.70| 0.50| 0.87| 1.53| 1.26| 0.20| 0.85| | 0.50| 0.12| 1.74|575.00| 1.31| 2.40| 0.99| | 0.99| 0.76| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 2| 3| | 3| 1| 2| | 6| 1| 3| | 3| 38| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 10| 22| | 3| 1| 2| | 6| 1| 3| | 3| 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 70| 57| 65| | 86| | 86| 60| 75| 53| 73| 64| 69| | 97| 95| 94| | 95| 96| 90| | 90| 68| | c)% Utilisation-SSH | 26| 26| 26| | 21| | 21| 35| 12| 13| 20| 17| 19| | 12| 16| 9| | 12| 6| 16| | 16| 22| | -MAH | 38| 46| 40| | 25| | 25| 59| 16| 24| 28| 26| 27| | 13| 16| 10| | 12| 6| 18| | 18| 32| | f)Down time/Hr worked | 1.15| 1.67| 1.32| | 0.67| | 0.67| 1.15| 2.03| 3.68| 1.32| 2.16| 1.65| | 0.27| 0.30| 0.67| | 0.38| 0.71| 0.61| | 0.61| 1.48| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Nov-2011 4.30 PM OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 8| | 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 6| 1| 5| 3| 4| 7| | 1| | 2| | 3| | 1| | 1| 30| | TOTAL | 4| 2| 6| | 2| | 2| 12| 3| 12| 11| 7| 18| | 1| | 2| | 3| | 1| | 1| 57| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 29.44| 20.53| 27.02| | 0.00| | 0.00| 26.93| 25.62| 22.06| 28.67| 37.66| 32.71| | 21.69| 0.00| 25.21| | 22.89| | 38.95| | 38.95| 27.03| | c)% Availability | 82| 68| 77| | 92| | 92| 82| 65| 75| 91| 68| 80| | 98| 99| 90| | 95| | 99| | 99| 80| | d)% Utilisation-SSH | 32| 25| 30| | 11| | 11| 29| 9| 14| 15| 15| 15| | 27| 1| 18| | 17| | 17| | 17| 19| | -MAH | 39| 37| 39| | 12| | 12| 36| 13| 19| 17| 22| 19| | 28| 1| 19| | 18| | 18| | 18| 24| | e)Down time/Hr worked | 0.55| 1.30| 0.75| | 0.73| | 0.73| 0.62| 4.01| 1.79| 0.57| 2.16| 1.28| | 0.09| 1.00| 0.56| | 0.29| | 0.06| | 0.06| 1.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| | 1| 1| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| | 1| | 1| 5| 2| 1| | 3| 3| | 1| | | | 1| | 1| | 1| 16| | GRADER | 3| 1| 4| | 1| | 1| 7| 3| 6| 6| 4| 10| | 2| | 2| | 4| | 2| | 2| 37| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 7| 3| 10| | 2| 1| 2| | 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 6| 1| 7| 28| 9| 13| 15| 16| 31| | 7| 1| 5| 1| 14| 1| 6| | 6| 124| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 83| 82| 83| | 86| 0| 72| 71| 86| 69| 73| 80| 77| | 97| 86| 74| 0| 82| 96| 81| | 81| 78| | c)% Utilisation-SSH | 31| 30| 31| | 18| 0| 15| 34| 15| 18| 20| 10| 15| | 12| 4| 11| 0| 11| 2| 11| | 11| 20| | -MAH | 37| 37| 37| | 21| 100| 21| 47| 18| 26| 27| 12| 19| | 13| 5| 15| 100| 13| 2| 13| | 13| 25| | d)Down time/Hr worked | 0.54| 0.59| 0.55| | 0.79|743.00| 1.85| 0.85| 0.89| 1.71| 1.36| 1.96| 1.57| | 0.23| 3.20| 2.31|575.00| 1.74| | 1.85| | 1.85| 1.14| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 69| 27| 96| | 21| 1| 22| 166| 47| 144| 125| 65| 190| | 27| 5| 19| 3| 54| 6| 28| | 28| 753| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 83| 75| 81| | 83| 0| 79| 75| 82| 67| 74| 83| 77| | 94| 94| 75| 0| 82| 96| 82| | 82| 77| | c)% Utilisation-SSH | 39| 44| 40| | 28| 0| 26| 42| 16| 22| 23| 27| 24| | 18| 11| 17| 0| 16| 2| 20| | 20| 28| | -MAH | 47| 58| 50| | 33| 100| 33| 56| 20| 33| 31| 33| 31| | 19| 12| 23| 100| 20| 3| 24| | 24| 37| | d)Down time/Hr worked | 0.44| 0.56| 0.48| | 0.61|743.00| 0.80| 0.59| 1.08| 1.50| 1.14| 0.64| 0.94| | 0.35| 0.52| 1.47|575.00| 1.08| | 0.89| | 0.89| 0.79| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | | 2.45| 1.79| | 1.79| | | | | | | | | | | 4.24| |b)Shovels(LCu.M)-Cap. | 8.97| 3.54| 12.52| | 2.00| | 2.00| 29.09| 4.24| 24.04| 22.00| 16.20| 38.20| | 2.00| 1.00| 2.00| | 5.00| 1.00| 2.00| | 2.00| 118.08| | -OB | 3.16| 0.38| 3.54| | 0.26| | 0.26| 13.46| 0.42| 7.05| 7.59| 6.73| 14.32| | 0.01| 0.08| | | 0.09| | | | | 39.15| | -Coal(LT) | 3.37| 3.28| 6.65| | 0.60| | 0.60| 6.81| 1.41| 1.74| 2.10| 0.21| 2.32| | 1.30| | 0.74| | 2.03| | 1.27| | 1.27| 22.83| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month: Sl.No. Mine Description Make Mfg.Sr.No. 1. RG.OC1 250MM Drill Atlas Capco 10182 List of Eqpt tranfered between the mines S.No From Mine To Mine Eqpt Make Mfg Sl.No 1 BPA OC2 Extn DOR OC 150mm Drill Atlas Capco 06681 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 01-Nov-2011 KEAR OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.34| 2.76| 5.10| | 0.61| 2.38| 2.99| 5.95| 2.50| 2.65| 2.52| 0.50| 3.02| 0.94| 1.50| | 0.50| 0.50| 2.50| | 0.40| 1.46| 1.86| 27.51| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.34| 2.76| 5.10| | 0.61| 2.38| 2.99| 5.95| 2.50| 2.65| 2.52| 0.50| 3.02| 0.94| 1.50| | 0.50| 0.50| 2.50| | 0.40| 1.46| 1.86| 27.51| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 1.80| 1.99| 3.79| | 0.47| 1.46| 1.94| 4.64| 0.84| 0.98| 1.29| 0.40| 1.68| 0.02| 0.78| | 0.45| | 1.23| | 0.35| 0.66| 1.01| 16.13| | - Contractor | | 0.67| 0.67| | | | | 0.57| | | | 0.36| 0.36| | | | | | | | | 0.04| 0.04| 1.65| | - Total | 1.80| 2.67| 4.47| | 0.47| 1.46| 1.94| 5.21| 0.84| 0.98| 1.29| 0.76| 2.05| 0.02| 0.78| | 0.45| | 1.23| | 0.35| 0.70| 1.05| 17.78| | % Achievement | 77| 97| 88| | 78| 61| 65| 88| 34| 37| 51| 152| 68| 2| 52| | 91| | 49| | 86| 48| 56| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.91| | 0.91| | | | | | | | | | | | | | 0.00| | 0.00| | 0.63| | 0.63| 1.54| | % Rehandle in Total | 50| | 24| | | | | | | | | | | | | | 0| | 0| | 184| | 63| 10| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 2.66| 2.09| | 2.09| | | | | | | | | | | 4.75| | -Shovels | 4.73| | 4.73| | | | | 14.32| 1.02| 13.51| 20.87| 1.50| 22.37| | | | | | | 0.66| | | | 56.61| | -Total | 4.73| | 4.73| | | | | 14.32| 1.02| 16.17| 22.96| 1.50| 24.46| | | | | | | 0.66| | | | 61.36| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 6.50| 7.00| 13.50| 3.00| | 8.00| 11.00| 31.00| 6.00| 7.00| | 8.00| 8.00| 7.20| 12.00| 1.80| 4.00| 5.00| 22.80| | 3.63| 8.36| 11.99| 118.49| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 11.23| 7.00| 18.23| 3.00| | 8.00| 11.00| 45.32| 7.02| 23.17| 22.96| 9.50| 32.46| 7.20| 12.00| 1.80| 4.00| 5.00| 22.80| 0.66| 3.63| 8.36| 11.99| 179.85| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 0.50| 0.77| | 0.77| | | | | | | | | | | 1.27| | -Shovels | 3.45| 0.50| 3.95| | 0.14| | 0.14| 8.45| 0.20| 5.15| 10.10| | 10.10| | 0.02| 0.03| | | 0.05| 0.04| | | | 28.08| | -Total | 3.45| 0.50| 3.95| | 0.14| | 0.14| 8.45| 0.20| 5.65| 10.88| | 10.88| | 0.02| 0.03| | | 0.05| 0.04| | | | 29.36| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 7.80| 7.21| 15.01| | | 6.13| 6.13| 20.87| 2.75| 2.70| | 3.66| 3.66| 0.08| 1.37| | 2.81| | 4.18| | 1.22| 1.99| 3.21| 58.58| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 11.25| 7.71| 18.96| | 0.14| 6.13| 6.27| 29.32| 2.95| 8.35| 10.88| 3.66| 14.53| 0.08| 1.39| 0.03| 2.81| | 4.23| 0.04| 1.22| 1.99| 3.21| 87.94| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 19| 37| | 37| | | | | | | | | | | 27| | -Shovels | 73| | 84| | | | | 59| 20| 38| 48| | 45| | | | | | | 6| | | | 50| | -Total | 73| | 84| | | | | 59| 20| 35| 47| | 44| | | | | | | 6| | | | 48| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 120| 103| 111| | | 77| 56| 67| 46| 39| | 46| 46| 1| 11| | 70| | 18| | 34| 24| 27| 49| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 100| 110| 104| | | 77| 57| 65| 42| 36| 47| 38| 45| 1| 12| 2| 70| | 19| 6| 34| 24| 27| 49| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 0.17| 0.82| | 0.82| | | | | | | | | | | 0.99| | - Shovels | | | | | | | | | | | | 4.35| 4.35| | | | | | | | | | | 4.35| | - Total | | | | | | | | | | 0.17| 0.82| 4.35| 5.17| | | | | | | | | | | 5.34| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 3| 8| | 47| | | | | | | | | | | 18| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 74| 100| 80| | 111| 61| 72| 63| 28| 35| 48| 14| 45| 2| 54| | 91| | 52| 6| 86| 45| 54| 50| | % Utiln. of Excav.Cap. | 114| 96| 109| | 45| | 45| 78| 35| 45| 66| 57| 63| | 53| 6| 30| | 35| 8| 65| | 65| 64| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 01-Nov-2011 KEAR OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 86| 84| | | 51| 56| | 75| 36| 36| 36| 36| | 15| 36| 19| 36| 10| | | 36| 36| | | | - In O B | 86| 84| | | 51| 80| | 75| 30| 37| 36| 36| | 9| 36| 19| | | | 13| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | 3| | | | 1| | 3| | 6| | 4| | | | 1| | | | 16| | | | | | - Strikes | 4| 3| | | 24| 17| | 12| 48| 54| 48| 48| | 48| 48| 48| 48| 48| | 48| 48| 48| | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | 16| | | | | | | | | | 10| | 20| | 1| | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9000| 10615| 19615| | 2440| 7933| 10373| 19833| 9615| 10192| 9692| 1923| 11615| 3615| 5769| | 1923| 1923| 9615| | 1538| 5615| 7154| 101630| | Actual | 6276| 7120| 13395| | 2784| 7836| 10620| 18569| 7009| 8189| 10739| 3293| 14032| 334| 6466| | 3791| | 10256| | 2877| 5525| 8402| 90807| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 18192| | 18192| | | | | 47733| 3904| 62192| 88308| 5769| 94077| | | | | | | 2538| | | | 228637| | Actual | 12028| 1793| 13821| | 805| | 805| 33812| 2012| 45811| 90654| | 90654| | 150| 491| | | 641| 877| | | | 188432| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 9.53| 26.78| 14.40| | 7.93| 57.93| 22.79| 8.02| 10.41| 5.45| 6.52| 10.97| 7.20| 0.83| 20.12| | 15.29| | 14.85| 8.06| 27.20| 26.92| 27.02| 10.33| | Simple Formula | 11.02| 26.78| 15.96| | 7.93| 57.93| 22.79| 12.77| 12.64| 5.67| 4.69| 23.76| 5.78| 0.83| 20.12| | 15.29| | 14.85| | 27.20| 26.92| 27.02| 11.83| | Excavation(Cu.M)| 28.47| 24.59| 27.26| | 7.58| 38.62| 16.80| 31.76| 11.45| 36.40| 42.76| 15.84| 41.22| 0.55| 13.88| 2.12| 10.19| | 10.49| 5.76| 18.14| 17.95| 18.01| 29.41| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 919| 304| 1223| | 322| 144| 466| 1888| 568| 1556| 2646| 154| 2800| | 332| 120| 262| 17| 731| 65| 102| 199| 301| 9598| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 15.58| 10.42| 26.00| | 0.18| 0.08| 0.26| 7.35| 0.50| 3.03| 0.53| 0.09| 0.62| 0.03| 2.46| 0.02| 0.49| | 2.96| | 0.29| 0.58| 0.87| 41.63| | - Cost/Cu.M (Rs.) | 3.35| 5.69| 4.01| | 0.41| 0.08| 0.18| 0.64| 0.65| 0.48| 0.05| 0.33| 0.05| 2.77| 4.59| 0.55| 1.61| | 3.41| | 1.25| 1.31| 1.29| 1.04| | - Cost/MOR/MTH (Rs.)|1695.7|3427.5|2126.2| | 57.1| 53.5| 56.0| 389.4| 87.5| 194.9| 20.1| 56.3| 22.1| | 740.1| 14.2| 186.0| | 405.1| | 281.6| 291.7| 288.3| 433.7| | PLD Allowance-Rs.Lakhs | 17.72| 6.87| 24.60| | 6.71| 3.40| 10.11| 51.48| 7.14| 24.81| 33.22| 1.94| 35.16| 1.00| 3.77| 0.60| 2.61| 0.04| 7.02| | 1.15| 2.23| 3.38| 164.71| | - Cost/Cu.M (Rs.) | 3.81| 3.75| 3.80| | 14.83| 3.49| 7.08| 4.46| 9.37| 3.94| 2.83| 7.38| 2.93| 89.35| 7.04| 19.27| 8.61| | 8.07| | 4.99| 5.05| 5.03| 4.11| | - Cost/MOR/MTH (Rs.)|1928.6|2261.0|2011.2| |2083.4|2363.3|2169.9|2726.9|1257.5|1594.6|1255.4|1262.6|1255.8| |1134.3| 499.5| 997.1| 259.7| 960.6| |1126.7|1121.1|1123.0| 1716.1| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.60| 0.40| 0.54| | 0.46| | 0.15| 0.75| 0.57| 0.81| 0.57| 0.55| 0.58| | 0.50| 0.14| 0.60| | 0.52| 0.47| 1.55| | 0.53| 0.64| | b)Other Equipments | 0.39| 0.47| 0.41| | 0.63| | 0.20| 0.35| 0.50| 0.28| 0.30| 0.34| 0.32| | 0.51| 1.50| 0.58| | 0.57| 0.76| 1.29| | 0.44| 0.35| | c)Total | 0.99| 0.87| 0.95| | 1.09| | 0.35| 1.10| 1.07| 1.09| 0.86| 0.90| 0.90| | 1.01| 1.64| 1.18| | 1.09| 1.24| 2.84| | 0.97| 0.99| | d)Dumpers(Ltr/CuM/KM) | 0.39| 0.35| | | 0.38| | | 0.30| 0.36| 0.26| 0.12| 0.25| | | 0.25| 0.27| 0.26| | | 0.47| 0.79| | | | | e)Lubricants -Ltrs | 9560| 6637| 16197| | 2090| | 2090| 37926| 3825| 22232| 12586| 5880| 18466| | 1624| 400| 1150| | 3174| 160| 2812| | 2812| 149621| | -Ltrs/CuM| 0.02| 0.04| 0.03| | 0.05| | 0.01| 0.03| 0.05| 0.04| 0.02| 0.01| 0.02| | 0.03| 0.13| 0.04| | 0.04| 0.04| 0.12| | 0.04| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 4.16| 3.44| 3.75| | 47.32| | 47.32| 3.44| 4.35| 6.94| 4.05| | 5.30| | 2.55| | 2.02| | 2.33| | 3.99| 3.95| 3.96| 3.47| | Shovel-O B(CuM/Kg)| 3.37| 8.20| 3.64| | 3.30| | 3.30| 1.91| 3.38| 2.05| 1.87| | 1.85| | | 0.57| | | 0.90| | | | | 2.06| | Dragline -O B(CuM/Kg)| | | | | | | | | | 0.54| | | | | | | | | | | | | | 1.36| | b)% Cap Sensitive | 22.61| 26.80| 24.64| | 5.83| | 5.83| 20.66| 20.79| 0.17| 2.42| 0.00| 1.90| | 9.52| 20.00| 16.61| | 12.49| | 88.39| 75.92| 82.36| 17.32| | c)Total Explosives(T) | 405| 379| 784| | 5| | 5| 1279| 122| 359| 571| 155| 726| | 65| 5| 37| | 107| | 60| 56| 116| 3498| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 01-Nov-2011 KEAR OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 31| 92| | 92| | | | | | | | | | | 58| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 97| 93| | 93| | | | | | | | | | | 95| | d)% Utilisation-SSH | | | | | | | | | | 21| 27| | 27| | | | | | | | | | | 24| | -MAH | | | | | | | | | | 22| 29| | 29| | | | | | | | | | | 25| | e)Down time/Hr worked | | | | | | | | | | 0.14| 0.25| | 0.25| | | | | | | | | | | 0.20| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| 1| 2| | 5| 1| 2| | 2| 31| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| 1| 2| | 5| 1| 2| | 2| 66| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 114| 96| 109| | 45| | 45| 78| 35| 48| 62| 57| 60| | 53| 6| 30| | 35| 8| 65| | 65| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 91| 68| 82| | 94| | 94| 84| 67| 88| 87| 98| 91| | 98| 96| 86| | 93| 96| 97| | 97| 86| | d)% Utilisation-SSH | 51| 42| 48| | 35| | 35| 39| 14| 22| 26| 27| 26| | 25| 11| 17| | 19| 8| 30| | 30| 31| | -MAH | 56| 61| 58| | 37| | 37| 47| 21| 25| 29| 28| 29| | 25| 11| 20| | 21| 8| 31| | 31| 36| | e)Down time/Hr worked | 0.17| 0.76| 0.37| | 0.17| | 0.17| 0.41| 2.32| 0.56| 0.50| 0.09| 0.35| | 0.09| 0.41| 0.82| | 0.39| 0.55| 0.10| | 0.10| 0.44| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 7| | 7| | | | | | | | | | | 52| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 30| 14| 44| | 9| | 9| 45| 27| 34| 33| | 33| | 14| 2| 8| 2| 26| 3| 16| | 16| 237| | TOTAL | 43| 14| 57| | 9| | 9| 93| 27| 94| 75| 26| 101| | 14| 2| 8| 2| 26| 3| 16| | 16| 426| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 82| 73| 80| | 79| | 79| 82| 92| 72| 85| 98| 89| | 97| 99| 62| 0| 79| 99| 89| | 89| 82| | c)% Utilisation-SSH | 32| 39| 34| | 21| | 21| 32| 12| 15| 18| 26| 20| | 14| 2| 18| 0| 13| 7| 18| | 18| 22| | -MAH | 40| 54| 43| | 26| | 26| 39| 13| 21| 21| 26| 22| | 14| 2| 29| 100| 16| 7| 20| | 20| 27| | f)Down time/Hr worked | 0.55| 0.69| 0.59| | 0.98| | 0.98| 0.57| 0.72| 1.83| 0.82| 0.09| 0.57| | 0.23| 0.52| 2.16|623.00| 1.59| 0.22| 0.62| | 0.62| 0.81| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 2| 3| | 3| 1| 2| | 6| 1| 3| | 3| 38| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 10| 22| | 3| 1| 2| | 6| 1| 3| | 3| 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 67| 51| 62| | 75| | 75| 58| 81| 50| 76| 69| 73| | 96| 94| 75| | 89| 96| 94| | 94| 67| | c)% Utilisation-SSH | 23| 22| 22| | 13| | 13| 25| 8| 12| 16| 12| 14| | 8| 9| 8| | 8| 8| 10| | 10| 16| | -MAH | 34| 42| 36| | 17| | 17| 42| 10| 23| 21| 17| 19| | 9| 10| 10| | 9| 9| 11| | 11| 24| | f)Down time/Hr worked | 1.43| 2.25| 1.69| | 1.92| | 1.92| 1.71| 2.37| 4.31| 1.49| 2.68| 1.93| | 0.48| 0.64| 3.32| | 1.38| 0.54| 0.60| | 0.60| 2.04| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 01-Nov-2011 KEAR OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 7| | 7| | | | | | | | | | | 21| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 6| 1| 5| 3| 4| 7| | 1| 1| 1| | 3| | 1| | 1| 30| | TOTAL | 4| 2| 6| | 2| | 2| 12| 3| 12| 10| 7| 17| | 1| 1| 1| | 3| | 1| | 1| 56| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 20.51| 21.39| 20.75| | 0.00| | 0.00| 30.36| 26.65| 23.55| 27.89| 11.47| 21.63| | 26.88| 33.27| 32.98| | 29.39| | 42.03| | 42.03| 24.98| | c)% Availability | 77| 57| 70| | 82| | 82| 93| 89| 79| 86| 59| 75| | 97| 99| 96| | 97| | 98| | 98| 82| | d)% Utilisation-SSH | 25| 18| 23| | 2| | 2| 18| 4| 11| 12| 10| 11| | 15| 2| 9| | 9| | 10| | 10| 13| | -MAH | 33| 32| 33| | 3| | 3| 19| 4| 14| 14| 17| 15| | 16| 2| 9| | 9| | 10| | 10| 16| | e)Down time/Hr worked | 0.91| 2.32| 1.30| | 8.07| | 8.07| 0.41| 2.85| 1.99| 1.17| 4.20| 2.32| | 0.19| 0.47| 0.51| | 0.31| | 0.16| | 0.16| 1.42| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| | 1| 1| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| | 1| | 1| 5| 2| 1| | 3| 3| | 1| | | | 1| | 1| | 1| 16| | GRADER | 3| 1| 4| | 1| | 1| 7| 3| 6| 6| 4| 10| | 2| | 2| | 4| | 2| | 2| 37| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 7| 3| 10| | 2| 1| 2| | 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 6| 1| 7| 28| 9| 13| 15| 16| 31| | 7| 1| 5| 1| 14| 1| 6| | 6| 124| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 82| 78| 80| | 71| 0| 59| 74| 91| 76| 88| 85| 87| | 97| 88| 73| 0| 81| 98| 95| | 95| 81| | c)% Utilisation-SSH | 22| 23| 22| | 8| 0| 7| 25| 9| 15| 12| 6| 9| | 11| 0| 9| 0| 9| 0| 7| | 7| 13| | -MAH | 27| 30| 28| | 12| 100| 12| 34| 9| 19| 13| 7| 10| | 11| 0| 12| 100| 11| 0| 7| | 7| 17| | d)Down time/Hr worked | 0.84| 0.95| 0.88| | 3.47|719.00| 5.73| 1.01| 1.01| 1.66| 0.99| 2.38| 1.49| | 0.30| 37.00| 3.05|623.00| 2.19| | 0.72| | 0.72| 1.39| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 69| 27| 96| | 21| 1| 22| 166| 47| 144| 124| 65| 189| | 27| 6| 18| 3| 54| 6| 28| | 28| 752| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 70| 78| | 78| 0| 74| 79| 88| 72| 85| 86| 86| | 97| 96| 71| 0| 83| 98| 92| | 92| 81| | c)% Utilisation-SSH | 32| 33| 32| | 17| 0| 16| 30| 11| 15| 17| 17| 17| | 13| 4| 14| 0| 12| 6| 15| | 15| 20| | -MAH | 39| 48| 41| | 21| 100| 21| 38| 12| 21| 20| 20| 20| | 14| 5| 19| 100| 14| 6| 17| | 17| 25| | d)Down time/Hr worked | 0.59| 0.90| 0.69| | 1.31|719.00| 1.63| 0.70| 1.11| 1.83| 0.86| 0.80| 0.84| | 0.24| 0.96| 2.15|623.00| 1.46| 0.41| 0.54| | 0.54| 0.91| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | | 0.67| 1.59| | 1.59| | | | | | | | | | | 2.26| |b)Shovels(LCu.M)-Cap. | 4.60| 1.89| 6.50| | 1.00| | 1.00| 14.66| 2.14| 12.00| 11.00| 8.12| 19.12| | 1.00| 0.50| 1.00| | 2.50| 0.50| 1.00| | 1.00| 59.43| | -OB | 3.45| 0.50| 3.95| | 0.14| | 0.14| 8.43| 0.20| 5.15| 5.99| 4.35| 10.34| | 0.01| 0.03| | | 0.05| 0.04| | | | 28.29| | -Coal(LT) | 2.70| 1.97| 4.68| | 0.47| | 0.47| 4.57| 0.82| 0.95| 1.29| 0.40| 1.68| | 0.78| | 0.46| | 1.23| | 0.98| | 0.98| 15.38| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month - NIL - List of Surveyed Off HEMM during the month S.No Mine Eqpt Make Mfg Sl.No 1 PK OC Grader BEML 3089 2 SRP OC1 35T Dumper BEML 9998 List of Eqpt tranfered between the mines S.No From Mine To Mine Eqpt Make Mfg Sl.No 1 BPA OC2 Extn KRG OC 35T Dumper HM A0301 2 " " " DOR OC2 35T Dumper HM 00279 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Oct-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.34| 2.10| 4.44| | 0.62| 2.35| 2.97| 5.69| 2.50| 2.65| 2.52| 0.50| 3.02| 0.96| 1.50| | 0.50| 0.50| 2.50| | 0.40| 1.06| 1.46| 26.19| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.34| 2.10| 4.44| | 0.62| 2.35| 2.97| 5.69| 2.50| 2.65| 2.52| 0.50| 3.02| 0.96| 1.50| | 0.50| 0.50| 2.50| | 0.40| 1.06| 1.46| 26.19| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 1.87| 2.54| 4.41| | 0.53| 2.79| 3.32| 5.02| 2.73| 2.94| 3.33| 0.84| 4.17| 0.04| 2.30| 0.03| 1.13| | 3.47| | 0.57| 1.64| 2.21| 28.31| | - Contractor | | | | | | | | 0.86| | | | 0.95| 0.95| | | | | | | | | 0.36| 0.36| 2.18| | - Total | 1.87| 2.54| 4.41| | 0.53| 2.79| 3.32| 5.88| 2.73| 2.94| 3.33| 1.79| 5.12| 0.04| 2.30| 0.03| 1.13| | 3.47| | 0.57| 2.01| 2.58| 30.48| | % Achievement | 80| 121| 99| | 86| 119| 112| 103| 109| 111| 132| 358| 170| 4| 153| | 226| | 139| | 142| 189| 176| 116| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.05| | 0.05| | | | | 0.36| | | | | 0.36| | | | | | | | 1.64| | 1.64| 2.05| | % Rehandle in Total | 3| | 1| | | | | 7| | | | | 9| | | | | | | | 289| | 74| 7| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 2.66| 2.09| | 2.09| | | | | | | | | | | 4.75| | -Shovels | 4.73| | 4.73| | | | | 14.51| 1.01| 13.51| 20.87| 1.20| 22.07| | | | | | | 0.58| | | | 56.41| | -Total | 4.73| | 4.73| | | | | 14.51| 1.01| 16.17| 22.96| 1.20| 24.16| | | | | | | 0.58| | | | 61.16| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 6.50| 7.00| 13.50| 3.00| | 7.00| 10.00| 12.00| 6.00| 6.00| | 8.00| 8.00| 7.20| 9.00| 1.70| 4.00| 5.00| 19.70| | 2.42| 5.57| 7.99| 90.39| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 11.23| 7.00| 18.23| 3.00| | 7.00| 10.00| 26.51| 7.01| 22.17| 22.96| 9.20| 32.16| 7.20| 9.00| 1.70| 4.00| 5.00| 19.70| 0.58| 2.42| 5.57| 7.99| 151.55| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 2.60| 1.39| | 1.39| | | | | | | | | | | 3.99| | -Shovels | 3.80| 0.15| 3.95| | 0.19| | 0.19| 10.97| 0.23| 12.25| 24.12| | 24.12| | 0.06| 0.06| | | 0.12| 0.03| | | | 51.86| | -Total | 3.80| 0.15| 3.95| | 0.19| | 0.19| 10.97| 0.23| 14.85| 25.51| | 25.51| | 0.06| 0.06| | | 0.12| 0.03| | | | 55.85| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 8.63| 6.07| 14.70| | | 5.88| 5.88| 21.23| 5.79| 4.86| | 10.68| 10.68| 0.28| 3.55| | 5.02| | 8.57| | 3.71| 5.80| 9.51| 81.50| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 12.43| 6.22| 18.65| | 0.19| 5.88| 6.07| 32.20| 6.02| 19.71| 25.51| 10.68| 36.19| 0.28| 3.60| 0.06| 5.02| | 8.69| 0.03| 3.71| 5.80| 9.51| 137.36| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 98| 67| | 67| | | | | | | | | | | 84| | -Shovels | 80| | 84| | | | | 76| 23| 91| 116| | 109| | | | | | | 6| | | | 92| | -Total | 80| | 84| | | | | 76| 23| 92| 111| | 106| | | | | | | 6| | | | 91| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 133| 87| 109| | | 84| 59| 177| 97| 81| | 133| 133| 4| 39| | 126| | 43| | 153| 104| 119| 90| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 111| 89| 102| | | 84| 61| 121| 86| 89| 111| 116| 113| 4| 40| 4| 126| | 44| 6| 153| 104| 119| 91| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.20| 0.87| | 0.87| | | | | | | | | | | 2.07| | - Shovels | | | | | | | | | | | | 10.70| 10.70| | | | | | | | | | | 10.70| | - Total | | | | | | | | | | 1.20| 0.87| 10.70| 11.57| | | | | | | | | | | 12.77| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 8| 3| | 45| | | | | | | | | | | 23| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 80| 131| 90| | 131| 119| 121| 79| 77| 94| 113| 36| 108| 4| 159| | 226| | 146| 6| 142| 155| 152| 95| | % Utiln. of Excav.Cap. | 110| 98| 107| | 54| | 54| 99| 85| 126| 150| 137| 145| | 159| 17| 75| | 97| 7| 148| | 148| 120| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Oct-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | | 68| 83| | 76| 93| 71| 93| 86| | 78| 80| 45| 72| 26| | | 93| 93| | | | - In O B | 87| 66| | | 68| 79| | 76| 33| 73| 93| 86| | 78| 80| 45| | | | 12| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 6| 27| | | 22| 14| | 14| | 22| | 7| | | 10| 7| 18| | | 63| | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | 10| | | | | | | | | | 26| | 52| | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9000| 8077| 17077| | 2365| 7581| 9946| 18967| 9615| 10192| 9692| 1923| 11615| 3692| 5769| | 1923| 1923| 9615| | 1538| 4077| 5615| 96336| | Actual | 6046| 8186| 14232| | 2323| 10090| 12413| 19801| 8818| 12436| 10747| 2916| 13662| 137| 8631| 231| 4717| | 13579| | 1833| 5305| 7138| 102214| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 18192| | 18192| | | | | 47733| 3885| 62192| 88308| 4615| 92923| | | | | | | 2231| | | | 227156| | Actual | 13113| 673| 13786| | 820| | 820| 43303| 2091| 61027| 82304| | 82304| | 209| 427| | | 636| 843| | | | 204810| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 7.89| 34.89| 14.22| | 6.99| 82.64| 30.42| 7.86| 13.60| 6.44| 6.77| 8.59| 7.07| 1.29| 30.30| 1.43| 18.90| | 21.67| 3.11| 29.87| 30.38| 30.24| 11.04| | Simple Formula | 8.76| 34.89| 15.38| | 6.99| 82.64| 30.42| 10.93| 19.73| 7.52| 5.34| 18.61| 6.23| 1.29| 30.30| 1.43| 18.90| | 21.70| | 29.87| 30.38| 30.24| 12.23| | Excavation(Cu.M)| 23.60| 25.29| 24.03| | 7.13| 55.09| 21.98| 31.20| 14.82| 42.97| 44.42| 12.40| 42.27| 0.86| 20.94| 3.60| 12.60| | 15.22| 2.22| 19.91| 20.25| 20.16| 32.08| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 914| 308| 1222| | 323| 145| 468| 1894| 565| 1559| 2614| 186| 2800| 118| 330| 121| 262| 17| 730| 64| 78| 221| 299| 9719| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 2.19| 8.59| 10.78| | | | | 9.98| 2.60| 10.19| 6.71| 1.17| 7.88| 0.14| 4.12| 0.18| 4.34| 0.04| 8.67| | 0.04| 0.11| 0.14| 50.38| | - Cost/Cu.M (Rs.) | 0.43| 4.67| 1.56| | | | | 0.70| 1.27| 0.61| 0.24| 2.10| 0.28| 5.88| 2.59| 2.04| 5.75| | 3.56| | 0.10| 0.10| 0.10| 0.67| | - Cost/MOR/MTH (Rs.)| 239.3|2790.0| 882.2| | | | | 527.0| 460.3| 653.6| 256.6| 629.3| 281.4| 117.9|1247.3| 147.2|1655.3| 224.9|1187.6| | 47.3| 47.5| 47.5| 518.4| | PLD Allowance-Rs.Lakhs | 18.08| 6.23| 24.31| | 4.37| 3.06| 7.43| 45.22| 13.48| 44.89| 63.23| 4.45| 67.68| 1.46| 5.33| 0.83| 3.44| 0.05| 9.65| 0.05| 1.34| 3.80| 5.14| 219.30| | - Cost/Cu.M (Rs.) | 3.58| 3.39| 3.53| | 8.15| 1.64| 3.10| 3.16| 6.57| 2.67| 2.28| 7.98| 2.39| 61.79| 3.35| 9.49| 4.56| | 3.97| 1.45| 3.53| 3.47| 3.48| 2.93| | - Cost/MOR/MTH (Rs.)|1978.1|2022.4|1989.3| |1354.3|2107.7|1587.7|2387.6|2386.4|2879.3|2418.8|2391.9|2417.0|1239.3|1614.9| 683.3|1312.8| 312.8|1321.7| 76.4|1711.9|1719.7|1717.7| 2256.4| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.54| 0.45| 0.52| | 0.58| | 0.13| 0.72| 0.60| 0.75| 0.59| 0.57| 0.61| | 0.47| 0.19| 0.51| | 0.47| 0.75| 2.22| | 0.57| 0.63| | b)Other Equipments | 0.43| 0.51| 0.45| | 0.74| 0.00| 0.17| 0.39| 0.54| 0.28| 0.31| 0.40| 0.36| | 0.42| 1.20| 0.54| | 0.49| 0.90| 2.02| | 0.52| 0.36| | c)Total | 0.97| 0.96| 0.97| | 1.32| 0.00| 0.30| 1.11| 1.14| 1.03| 0.90| 0.97| 0.97| | 0.89| 1.39| 1.05| | 0.96| 1.65| 4.23| | 1.09| 0.99| | d)Dumpers(Ltr/CuM/KM) | 0.38| 0.31| | | 0.53| | | 0.35| 0.34| 0.28| 0.15| 0.20| | | 0.23| 0.21| 0.24| | | 1.00| 1.14| | | | | e)Lubricants -Ltrs | 18445| 8987| 27432| | 3332| | 3332| 51292| 10966| 53166| 30013| 28092| 58105| | 3207| 452| 6599| | 10258| 468| 5087| | 5087| 324320| | -Ltrs/CuM| 0.04| 0.05| 0.04| | 0.06| | 0.01| 0.04| 0.05| 0.04| 0.02| 0.02| 0.02| | 0.02| 0.05| 0.09| | 0.04| 0.14| 0.13| | 0.03| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.01| 3.16| 3.09| | 16.88| | 16.88| 2.63| 4.74| 8.56| 4.44| | 5.55| | 2.33| 0.21| 3.90| | 2.41| | 4.23| 4.30| 4.29| 3.25| | Shovel-O B(CuM/Kg)| 2.23| 31.19| 2.31| | 2.12| | 2.12| 1.64| 0.80| 2.68| 1.67| | 1.63| | | | | | | | | | | 1.85| | Dragline -O B(CuM/Kg)| | | | | | | | | | 1.57| 2.10| | 2.10| | | | | | | | | | | 1.72| | b)% Cap Sensitive | 25.00| 25.67| 25.24| | 9.05| | 9.05| 3.14| 25.17| 0.96| 2.20| 1.07| 1.96| | 10.35| 20.00| 9.09| | 10.62| | 90.45| 90.45| 90.45| 13.83| | c)Total Explosives(T) | 701| 395| 1096| | 12| | 12| 1516| 344| 658| 1586| 428| 2015| | 193| 16| 65| | 274| | 112| 320| 432| 6346| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Oct-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 174| 131| | 131| | | | | | | | | | | 155| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 84| 66| | 66| | | | | | | | | | | 75| | d)% Utilisation-SSH | | | | | | | | | | 68| 41| | 41| | | | | | | | | | | 54| | -MAH | | | | | | | | | | 81| 62| | 62| | | | | | | | | | | 73| | e)Down time/Hr worked | | | | | | | | | | 0.24| 0.84| | 0.84| | | | | | | | | | | 0.47| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| 1| 2| | 5| 1| 2| | 2| 31| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| 1| 2| | 5| 1| 2| | 2| 66| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 110| 98| 107| | 54| | 54| 99| 85| 117| 152| 137| 146| | 159| 17| 75| | 97| 7| 148| | 148| 117| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 90| 80| 87| | 91| | 91| 86| 55| 81| 79| 94| 84| | 93| 69| 70| | 79| 90| 93| | 93| 83| | d)% Utilisation-SSH | 53| 50| 52| | 47| | 47| 48| 39| 47| 54| 58| 56| | 54| 19| 34| | 40| 8| 70| | 70| 49| | -MAH | 59| 63| 60| | 52| | 52| 56| 71| 58| 69| 62| 66| | 59| 27| 49| | 50| 9| 75| | 75| 60| | e)Down time/Hr worked | 0.18| 0.40| 0.26| | 0.19| | 0.19| 0.29| 1.14| 0.41| 0.39| 0.10| 0.28| | 0.14| 1.64| 0.88| | 0.52| 1.25| 0.10| | 0.10| 0.35| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 7| | 7| | | | | | | | | | | 52| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 30| 14| 44| | 9| | 9| 45| 27| 34| 33| | 33| | 13| 4| 8| 1| 26| 3| 17| | 17| 238| | TOTAL | 43| 14| 57| | 9| | 9| 93| 27| 94| 75| 26| 101| | 13| 4| 8| 1| 26| 3| 17| | 17| 427| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 90| 77| 86| | 80| | 80| 81| 70| 73| 76| 94| 81| | 92| 90| 59| 0| 76| 96| 65| | 65| 78| | c)% Utilisation-SSH | 33| 41| 35| | 29| | 29| 39| 29| 33| 42| 53| 45| | 32| 6| 34| 0| 28| 6| 38| | 38| 37| | -MAH | 37| 53| 40| | 36| | 36| 48| 42| 46| 55| 57| 55| | 34| 6| 58| | 37| 7| 58| | 58| 47| | f)Down time/Hr worked | 0.31| 0.58| 0.39| | 0.69| | 0.69| 0.50| 1.03| 0.81| 0.58| 0.10| 0.42| | 0.25| 1.82| 1.20| | 0.85| 0.67| 0.92| | 0.92| 0.59| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 2| 3| | 3| 1| 2| | 6| 1| 3| | 3| 38| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 10| 22| | 3| 1| 2| | 6| 1| 3| | 3| 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 65| 42| 58| | 61| | 61| 68| 59| 53| 71| 76| 73| | 65| 90| 45| | 62| 91| 64| | 64| 65| | c)% Utilisation-SSH | 28| 19| 25| | 13| | 13| 33| 22| 27| 38| 29| 34| | 20| 14| 18| | 18| 8| 25| | 25| 29| | -MAH | 44| 45| 44| | 21| | 21| 49| 37| 52| 54| 38| 47| | 30| 15| 40| | 29| 8| 39| | 39| 44| | f)Down time/Hr worked | 1.22| 3.01| 1.66| | 3.07| | 3.07| 0.95| 1.88| 1.72| 0.75| 0.83| 0.78| | 1.76| 0.75| 3.12| | 2.08| 1.23| 1.46| | 1.46| 1.21| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Oct-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 7| | 7| | | | | | | | | | | 21| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 6| 1| 5| 3| 4| 7| | 1| 1| 1| | 3| | 1| | 1| 30| | TOTAL | 4| 2| 6| | 2| | 2| 12| 3| 12| 10| 7| 17| | 1| 1| 1| | 3| | 1| | 1| 56| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 0.00| 20.42| 5.13| | 0.00| | 0.00| 30.79| 27.90| 22.02| 28.35| 37.91| 32.20| | 26.99| 32.64| 32.41| | 28.71| | 33.89| | 33.89| 26.20| | c)% Availability | 82| 54| 73| | 73| | 73| 82| 92| 69| 81| 65| 74| | 93| 92| 85| | 90| | 93| | 93| 77| | d)% Utilisation-SSH | 32| 22| 29| | 8| | 8| 25| 15| 23| 36| 32| 35| | 40| 7| 15| | 22| | 30| | 30| 27| | -MAH | 40| 41| 40| | 11| | 11| 30| 16| 34| 45| 50| 47| | 44| 7| 18| | 24| | 32| | 32| 35| | e)Down time/Hr worked | 0.56| 2.08| 0.95| | 3.56| | 3.56| 0.71| 0.55| 1.34| 0.52| 1.07| 0.74| | 0.18| 1.12| 0.99| | 0.45| | 0.24| | 0.24| 0.87| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| | 1| 1| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| | 1| | 1| 5| 2| 1| | 3| 3| | 1| | | | 1| | 1| | 1| 16| | GRADER | 3| 1| 4| | 1| | 1| 8| 3| 6| 6| 4| 10| | 2| | 2| | 4| | 2| | 2| 38| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 7| 3| 10| | 2| 1| 2| | 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 6| 1| 7| 29| 9| 13| 15| 16| 31| | 7| 1| 5| 1| 14| 1| 6| | 6| 125| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 89| 75| 84| | 73| 43| 68| 73| 73| 67| 86| 80| 83| | 88| 94| 64| 57| 78| 96| 85| | 85| 78| | c)% Utilisation-SSH | 27| 18| 24| | 16| 5| 14| 31| 21| 30| 27| 16| 22| | 21| 1| 17| 11| 18| 0| 18| | 18| 23| | -MAH | 31| 25| 29| | 21| 13| 20| 42| 28| 46| 32| 20| 26| | 24| 2| 27| 20| 23| 0| 21| | 21| 29| | d)Down time/Hr worked | 0.42| 1.39| 0.66| | 1.74| 10.60| 2.28| 0.87| 1.33| 1.10| 0.51| 1.29| 0.80| | 0.55| 4.33| 2.10| 3.86| 1.26| | 0.84| | 0.84| 0.96| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 69| 27| 96| | 21| 1| 22| 167| 47| 144| 124| 65| 189| | 26| 8| 18| 2| 54| 6| 29| | 29| 754| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 87| 71| 83| | 77| 43| 75| 79| 69| 71| 77| 85| 80| | 88| 87| 61| 19| 76| 94| 72| | 72| 78| | c)% Utilisation-SSH | 34| 34| 34| | 23| 5| 23| 37| 27| 33| 40| 40| 40| | 30| 9| 27| 4| 25| 6| 34| | 34| 35| | -MAH | 39| 48| 41| | 31| 13| 30| 47| 39| 47| 52| 47| 50| | 34| 10| 43| 20| 33| 6| 47| | 47| 45| | d)Down time/Hr worked | 0.38| 0.83| 0.51| | 0.99| 10.60| 1.10| 0.58| 1.13| 0.88| 0.56| 0.37| 0.50| | 0.39| 1.46| 1.45| 21.00| 0.95| 1.05| 0.80| | 0.80| 0.64| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | | 3.80| 2.26| | 2.26| | | | | | | | | | | 6.06| |b)Shovels(LCu.M)-Cap. | 4.59| 1.87| 6.46| | 1.00| | 1.00| 14.71| 2.41| 12.08| 11.00| 8.19| 19.19| | 1.00| 0.50| 1.00| | 2.50| 0.50| 1.00| | 1.00| 59.86| | -OB | 3.78| 0.15| 3.93| | 0.19| | 0.19| 10.96| 0.23| 12.24| 14.55| 10.70| 25.24| | 0.06| 0.06| | | 0.12| 0.03| | | | 52.94| | -Coal(LT) | 1.92| 2.53| 4.45| | 0.53| | 0.53| 5.38| 2.73| 2.92| 3.33| 0.84| 4.17| | 2.30| 0.03| 1.13| | 3.47| | 2.21| | 2.21| 25.85| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month: Sl.No. Mine Description Make Mfg.Sr.No. 1. RG.OC1 250MM Drill Atlas Capco 10181 2. RG.OC2 D-155 Dozer BEML 12661 (Received from GDK 10A/ALP Mine) List of Surveyed Off HEMM during the month Sl.No. Mine Description Make Mfg.Sr.No. 1. JK OC Motor Grader L&T 06267 (Surveyed off on 21.07.2011) THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Aug-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.34| 2.10| 4.44| | 0.62| 2.35| 2.97| 5.69| 2.50| 2.65| 2.52| 0.50| 3.02| 0.96| 1.50| | 0.50| | 2.00| | 0.40| 1.06| 1.46| 25.69| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.34| 2.10| 4.44| | 0.62| 2.35| 2.97| 5.69| 2.50| 2.65| 2.52| 0.50| 3.02| 0.96| 1.50| | 0.50| | 2.00| | 0.40| 1.06| 1.46| 25.69| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 1.86| 2.95| 4.81| | 0.54| 2.78| 3.32| 3.99| 2.76| 3.17| 3.12| 0.77| 3.89| 0.04| 2.10| 0.02| 1.27| | 3.39| | 0.05| 1.82| 1.88| 27.24| | - Contractor | | 0.29| 0.29| | | | | 1.17| | | | 0.90| 0.90| | | | | | | | | 0.23| 0.23| 2.59| | - Total | 1.86| 3.25| 5.10| | 0.54| 2.78| 3.32| 5.16| 2.76| 3.17| 3.12| 1.68| 4.79| 0.04| 2.10| 0.02| 1.27| | 3.39| | 0.05| 2.05| 2.10| 29.84| | % Achievement | 79| 155| 115| | 88| 118| 112| 91| 110| 120| 124| 335| 159| 4| 140| | 254| | 169| | 14| 193| 144| 116| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.04| | 0.04| | | | | 0.68| | | | | 0.68| | | | | | | | 2.02| | 2.02| 2.74| | % Rehandle in Total | 2| | 1| | | | | 17| | | | | 17| | | | | | | | 3733| | 108| 10| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 2.66| 2.09| | 2.09| | | | | | | | | | | 4.75| | -Shovels | 4.73| | 4.73| | | | | 14.51| 1.01| 13.51| 20.87| 0.97| 21.84| | | | | | | 0.61| | | | 56.21| | -Total | 4.73| | 4.73| | | | | 14.51| 1.01| 16.17| 22.96| 0.97| 23.93| | | | | | | 0.61| | | | 60.96| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 9.00| 7.00| 16.00| 3.00| | 7.00| 10.00| 16.00| 6.00| 7.00| | 10.00| 10.00| 7.70| 9.00| 1.90| 4.00| | 14.90| | 2.42| 5.57| 7.99| 95.59| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 13.73| 7.00| 20.73| 3.00| | 7.00| 10.00| 30.51| 7.01| 23.17| 22.96| 10.97| 33.93| 7.70| 9.00| 1.90| 4.00| | 14.90| 0.61| 2.42| 5.57| 7.99| 156.55| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 3.80| 1.70| | 1.70| | | | | | | | | | | 5.50| | -Shovels | 4.31| 0.08| 4.39| | 0.31| | 0.31| 9.79| 0.35| 10.88| 20.79| | 20.79| | 0.01| 0.02| | | 0.02| 0.12| | | | 46.66| | -Total | 4.31| 0.08| 4.39| | 0.31| | 0.31| 9.79| 0.35| 14.68| 22.49| | 22.49| | 0.01| 0.02| | | 0.02| 0.12| | | | 52.16| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 11.37| 8.06| 19.43| | | 7.37| 7.37| 20.75| 7.18| 5.05| | 7.14| 7.14| 0.30| 8.62| | 7.87| | 16.49| | 3.32| 5.42| 8.74| 92.45| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 15.68| 8.14| 23.82| | 0.31| 7.37| 7.68| 30.54| 7.53| 19.73| 22.49| 7.14| 29.63| 0.30| 8.63| 0.02| 7.87| | 16.52| 0.12| 3.32| 5.42| 8.74| 144.61| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 143| 81| | 81| | | | | | | | | | | 116| | -Shovels | 91| | 93| | | | | 67| 35| 81| 100| | 95| | | | | | | 20| | | | 83| | -Total | 91| | 93| | | | | 67| 35| 91| 98| | 94| | | | | | | 20| | | | 86| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 126| 115| 121| | | 105| 74| 130| 120| 72| | 71| 71| 4| 96| | 197| | 111| | 137| 97| 109| 97| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 114| 116| 115| | | 105| 77| 100| 107| 85| 98| 65| 87| 4| 96| 1| 197| | 111| 20| 137| 97| 109| 92| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.00| 1.58| | 1.58| | | | | | | | | | | 2.58| | - Shovels | | | | | | | | | | | | 10.15| 10.15| | | | | | | | | | | 10.15| | - Total | | | | | | | | | | 1.00| 1.58| 10.15| 11.73| | | | | | | | | | | 12.73| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 7| 7| | 52| | | | | | | | | | | 24| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 88| 146| 99| | 164| 118| 128| 68| 82| 94| 100| 40| 97| 4| 140| | 254| | 171| 20| 14| 172| 129| 90| | % Utiln. of Excav.Cap. | 115| 109| 113| | 67| | 67| 88| 105| 123| 133| 127| 131| | 140| 7| 85| | 91| 24| 138| | 138| 113| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Aug-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | | 70| 74| | 83| 84| 80| 87| 87| | 72| 88| 42| 82| 52| | | 81| 81| | | | - In O B | 90| 75| | | 70| 80| | 83| 45| 67| 87| 87| | 72| 88| 42| | | | 34| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 3| 18| | | 8| 13| | 10| | 20| | | | | | 6| 5| | | 29| 6| 6| | | | - Strikes | | | | | | | | | 6| 6| 6| 6| | 6| 5| 4| 6| | | 4| 6| 6| | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | 19| | | | | | | | | | 26| | 26| | 3| | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9000| 8077| 17077| | 2365| 7581| 9946| 18355| 9615| 10192| 9692| 1923| 11615| 3692| 5769| | 1923| | 7692| | 1538| 4077| 5615| 93801| | Actual | 5994| 9517| 15511| | 2314| 11265| 13580| 14435| 9858| 11887| 10745| 2671| 13416| 147| 7152| 157| 4641| | 11949| | 200| 6750| 6950| 97733| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 18192| | 18192| | | | | 46806| 3885| 62192| 88308| 3731| 92038| | | | | | | 2346| | | | 225460| | Actual | 14360| 328| 14688| | 1339| | 1339| 35386| 2359| 65731| 77557| | 77557| | 20| 135| | | 155| 1052| | | | 198267| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 8.62| 42.52| 16.88| | 7.20| 83.47| 30.64| 7.01| 15.54| 6.84| 6.31| 9.66| 6.78| 1.40| 28.13| 0.92| 21.67| | 21.08| | 26.75| 27.97| 27.93| 11.20| | Simple Formula | 8.66| 42.52| 16.93| | 7.20| 83.47| 30.64| 8.93| 21.36| 8.61| 5.25| 20.92| 6.17| 1.40| 28.13| 0.92| 21.67| | 21.08| | 26.75| 27.97| 27.93| 12.26| | Excavation(Cu.M)| 25.84| 29.53| 26.74| | 8.96| 55.65| 23.31| 27.84| 16.98| 45.59| 41.37| 13.95| 39.76| 0.93| 18.84| 1.40| 14.45| | 14.21| | 17.83| 18.65| 18.62| 31.66| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 917| 279| 1196| | 322| 143| 465| 1872| 562| 1560| 2635| 163| 2798| 108| 334| 123| 264| 17| 738| 63| 12| 287| 299| 9661| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 6.51| 7.16| 13.67| | 1.99| | 1.99| 9.43| 1.53| 16.74| 5.99| 0.86| 6.85| 0.52| 3.79| 0.12| 3.26| | 7.17| | | 0.13| 0.13| 58.02| | - Cost/Cu.M (Rs.) | 1.17| 3.49| 1.80| | 2.96| | 0.79| 0.76| 0.70| 1.00| 0.24| 1.66| 0.27| 22.23| 2.70| 3.60| 3.86| | 3.14| | | 0.10| 0.10| 0.83| | - Cost/MOR/MTH (Rs.)| 710.0|2566.2|1143.0| | 617.1| | 427.3| 503.8| 271.5|1072.9| 227.4| 525.0| 244.7| 485.4|1134.0| 98.0|1235.1| | 971.4| | | 44.2| 42.4| 600.6| | PLD Allowance-Rs.Lakhs | 23.38| 7.56| 30.94| | 4.86| 3.80| 8.66| 55.31| 16.42| 55.26| 79.18| 4.74| 83.91| 2.18| 8.10| 1.15| 5.49| 0.07| 14.81| 0.15| 0.26| 6.25| 6.51| 274.15| | - Cost/Cu.M (Rs.) | 4.21| 3.69| 4.07| | 7.23| 2.05| 3.43| 4.44| 7.48| 3.29| 3.22| 9.17| 3.35| 92.50| 5.77| 34.43| 6.49| | 6.48| 1.23| 7.23| 5.14| 5.21| 3.90| | - Cost/MOR/MTH (Rs.)|2549.5|2709.0|2586.7| |1509.9|2656.2|1862.4|2954.7|2921.8|3542.6|3004.8|2905.1|2999.0|2020.2|2424.8| 936.8|2079.2| 388.6|2006.3| 233.1|2170.4|2178.0|2177.7| 2837.7| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.51| 0.38| 0.47| | 0.46| | 0.12| 0.91| 0.58| 0.79| 0.60| 0.47| 0.56| | 0.53| 1.45| 0.57| | 0.56| 0.45| 21.70| | 0.63| 0.65| | b)Other Equipments | 0.39| 0.38| 0.39| | 0.82| 0.01| 0.22| 0.40| 0.54| 0.34| 0.35| 0.37| 0.36| | 0.50| 3.33| 0.61| | 0.59| 0.56| 20.30| | 0.58| 0.38| | c)Total | 0.90| 0.77| 0.86| | 1.28| 0.01| 0.34| 1.31| 1.12| 1.13| 0.95| 0.84| 0.92| | 1.03| 4.78| 1.18| | 1.15| 1.01| 42.01| | 1.21| 1.03| | d)Dumpers(Ltr/CuM/KM) | 0.35| 0.31| | | 0.36| | | 0.29| 0.37| 0.31| 0.29| 0.24| | | 0.28| 1.29| 0.29| | | 0.60| 10.50| | | | | e)Lubricants -Ltrs | 13756| 7484| 21240| | 4354| | 4354| 52828| 9030| 52588| 31334| 22270| 53604| | 2520| 790| 4870| 169| 8349| 1450| 5087| | 5087| 301164| | -Ltrs/CuM| 0.02| 0.04| 0.03| | 0.06| | 0.02| 0.04| 0.04| 0.04| 0.02| 0.02| 0.02| | 0.02| 0.24| 0.06| | 0.04| 0.12| 1.41| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.93| 3.78| 3.84| | 5.40| | 5.40| 2.45| 7.42| 4.25| 2.74| 4.72| 2.99| | 2.28| | 1.95| | 2.16| | 4.45| 6.25| 6.18| 2.98| | Shovel-O B(CuM/Kg)| 2.06| 17.28| 2.10| | | | | 1.79| 1.38| 2.16| 2.60| | 2.60| | | 1.84| | | 2.42| | | | | 2.24| | Dragline -O B(CuM/Kg)| | | | | | | | | | 4.93| 0.90| | 0.90| | | | | | | | | | | 2.07| | b)% Cap Sensitive | 29.03| 26.32| 28.22| | 20.00| | 20.00| 3.88| 20.44| 1.82| 3.41| 0.73| 2.79| | 5.62| 19.51| 9.55| | 6.78| | 95.01| 95.01| 95.01| 16.48| | c)Total Explosives(T) | 786| 333| 1119| | 10| | 10| 1487| 307| 654| 1104| 330| 1434| | 340| 1| 138| | 479| | 19| 467| 487| 5978| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Aug-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 219| 190| | 190| | | | | | | | | | | 206| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 83| 92| | 92| | | | | | | | | | | 88| | d)% Utilisation-SSH | | | | | | | | | | 67| 58| | 58| | | | | | | | | | | 63| | -MAH | | | | | | | | | | 81| 63| | 63| | | | | | | | | | | 72| | e)Down time/Hr worked | | | | | | | | | | 0.25| 0.13| | 0.13| | | | | | | | | | | 0.20| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| 1| 2| | 5| 1| 2| | 2| 31| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| 1| 2| | 5| 1| 2| | 2| 66| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 115| 109| 113| | 67| | 67| 88| 105| 106| 124| 127| 125| | 140| 7| 85| | 91| 24| 138| | 138| 107| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 90| 83| 88| | 92| | 92| 88| 72| 85| 80| 94| 85| | 94| 90| 81| | 88| 84| 95| | 95| 86| | d)% Utilisation-SSH | 59| 53| 57| | 51| | 51| 48| 50| 46| 49| 50| 49| | 57| 21| 43| | 45| 27| 65| | 65| 50| | -MAH | 66| 64| 65| | 55| | 55| 55| 69| 53| 62| 53| 58| | 61| 23| 53| | 51| 32| 68| | 68| 58| | e)Down time/Hr worked | 0.17| 0.32| 0.21| | 0.15| | 0.15| 0.25| 0.55| 0.32| 0.42| 0.12| 0.31| | 0.11| 0.47| 0.44| | 0.27| 0.58| 0.08| | 0.08| 0.28| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 7| | 7| | | | | | | | | | | 52| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 30| 14| 44| | 9| | 9| 45| 27| 34| 33| | 33| | 13| 4| 8| 1| 26| 3| 17| | 17| 238| | TOTAL | 43| 14| 57| | 9| | 9| 93| 27| 94| 75| 26| 101| | 13| 4| 8| 1| 26| 3| 17| | 17| 427| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 86| 63| 80| | 73| | 73| 78| 74| 70| 76| 96| 81| | 90| 44| 76| 0| 76| 89| 60| | 60| 77| | c)% Utilisation-SSH | 36| 37| 36| | 28| | 28| 38| 31| 29| 36| 47| 39| | 37| 10| 40| 0| 33| 12| 35| | 35| 35| | -MAH | 42| 59| 45| | 38| | 38| 48| 42| 42| 47| 49| 47| | 41| 22| 52| | 43| 14| 58| | 58| 45| | f)Down time/Hr worked | 0.39| 0.99| 0.54| | 0.98| | 0.98| 0.57| 0.82| 1.01| 0.67| 0.09| 0.48| | 0.28| 5.79| 0.62| | 0.74| 0.87| 1.16| | 1.16| 0.68| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 1| 2| | 3| 1| 2| | 6| 1| 3| | 3| 37| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 9| 21| | 3| 1| 2| | 6| 1| 3| | 3| 77| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 49| 44| 47| | 81| | 81| 59| 62| 52| 72| 78| 74| | 78| 96| 79| | 81| 68| 66| | 66| 64| | c)% Utilisation-SSH | 24| 20| 23| | 27| | 27| 30| 20| 26| 34| 28| 32| | 21| 20| 22| | 21| 12| 22| | 22| 27| | -MAH | 49| 46| 48| | 33| | 33| 51| 32| 49| 48| 36| 43| | 26| 21| 28| | 26| 18| 34| | 34| 43| | f)Down time/Hr worked | 2.17| 2.72| 2.34| | 0.71| | 0.71| 1.35| 1.93| 1.85| 0.82| 0.77| 0.80| | 1.06| 0.18| 0.94| | 0.89| 2.69| 1.57| | 1.57| 1.34| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Aug-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 6| | 6| | | | | | | | | | | 20| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 6| 1| 5| 3| 4| 7| | 1| 1| 1| | 3| | 1| | 1| 30| | TOTAL | 4| 2| 6| | 2| | 2| 12| 3| 12| 9| 7| 16| | 1| 1| 1| | 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 22.20| 26.99| 23.12| | 0.00| | 0.00| 26.82| 26.36| 22.51| 26.76| 32.33| 28.98| | 28.53| 13.25| 31.59| | 29.26| | 29.88| | 29.88| 26.02| | c)% Availability | 88| 53| 77| | 82| | 82| 81| 92| 67| 77| 76| 77| | 93| 99| 90| | 94| | 95| | 95| 78| | d)% Utilisation-SSH | 36| 18| 30| | 7| | 7| 25| 11| 24| 30| 26| 28| | 37| 1| 20| | 20| | 23| | 23| 25| | -MAH | 41| 34| 39| | 9| | 9| 30| 12| 37| 39| 35| 37| | 40| 1| 22| | 22| | 24| | 24| 32| | e)Down time/Hr worked | 0.34| 2.58| 0.77| | 2.58| | 2.58| 0.78| 0.69| 1.37| 0.78| 0.91| 0.83| | 0.18| 1.00| 0.50| | 0.30| | 0.22| | 0.22| 0.90| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| | 1| 1| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| | 1| | 1| 5| 2| 1| | 3| 3| | 1| | | | 1| | 1| | 1| 16| | GRADER | 3| 1| 4| | 2| | 2| 8| 3| 6| 6| 4| 10| | 2| | 2| | 4| | 2| | 2| 39| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 7| 3| 10| | 2| 1| 2| | 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 7| 1| 8| 29| 9| 13| 15| 16| 31| | 7| 1| 5| 1| 14| 1| 6| | 6| 126| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 59| 76| | 70| 68| 70| 72| 69| 68| 76| 77| 77| | 77| 98| 73| 98| 79| 89| 94| | 94| 76| | c)% Utilisation-SSH | 31| 16| 26| | 16| 10| 15| 25| 30| 28| 26| 13| 20| | 20| 3| 22| 13| 19| 0| 20| | 20| 22| | -MAH | 37| 26| 34| | 23| 14| 22| 34| 44| 41| 34| 17| 26| | 26| 3| 30| 13| 25| 0| 21| | 21| 29| | d)Down time/Hr worked | 0.53| 2.62| 0.94| | 1.86| 3.26| 1.98| 1.11| 1.02| 1.15| 0.93| 1.70| 1.20| | 1.10| 0.62| 1.21| 0.18| 1.10| | 0.31| | 0.31| 1.11| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 69| 27| 96| | 22| 1| 23| 167| 47| 144| 123| 64| 187| | 26| 8| 18| 2| 54| 6| 29| | 29| 753| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 83| 62| 77| | 75| 68| 75| 76| 73| 70| 76| 87| 80| | 86| 70| 77| 49| 79| 86| 72| | 72| 77| | c)% Utilisation-SSH | 36| 32| 35| | 25| 10| 24| 35| 31| 30| 35| 35| 35| | 32| 11| 32| 6| 29| 13| 32| | 32| 33| | -MAH | 44| 51| 46| | 32| 14| 32| 46| 42| 43| 46| 40| 44| | 38| 15| 42| 13| 36| 15| 45| | 45| 43| | d)Down time/Hr worked | 0.47| 1.19| 0.65| | 1.00| 3.26| 1.04| 0.67| 0.87| 1.01| 0.67| 0.38| 0.57| | 0.44| 2.84| 0.72| 7.98| 0.73| 1.11| 0.89| | 0.89| 0.71| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | | 4.80| 3.27| | 3.27| | | | | | | | | | | 8.07| |b)Shovels(LCu.M)-Cap. | 4.86| 1.88| 6.75| | 1.00| | 1.00| 14.60| 2.08| 12.22| 10.70| 8.41| 19.11| | 1.00| 0.50| 1.00| | 2.50| 0.50| 1.00| | 1.00| 59.76| | -OB | 4.30| 0.08| 4.38| | 0.31| | 0.31| 9.78| 0.35| 10.88| 11.19| 10.15| 21.35| | 0.01| 0.02| | | 0.02| 0.12| | | | 47.20| | -Coal(LT) | 1.90| 2.95| 4.85| | 0.54| | 0.54| 4.67| 2.75| 3.15| 3.12| 0.77| 3.89| | 2.10| 0.02| 1.27| | 3.39| | 2.07| | 2.07| 25.32| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month: Sl.No. Mine Description Make Mfg.Sr.No. 1. RG.OC1 250MM Drill Atlas Capco 10179 2. RG.OC3 250MM Drill Atlas Capco 10180 3. RG.OC2 150MM Drill R E C P 21018 List of Surveyed Off HEMM during the month Sl.No. Mine Description Make Mfg.Sr.No. 1. PK OC 3.0 Cu.M.Shovel L&T 00450 2. PK OC 35T Dumper BEML 09812 3. PK OC 35T Dumper BEML 09816 4. PK OC 35T Dumper BEML 09818 5. PK OC 35T Dumper BEML 09821 6. PK OC 35T Dumper BEML 09961 List of HEMM transferred during the month Sl.No. From Description To Make Mfg.Sr.No. 1. GK. OC 3.0 Cu.M. Shovel JVR OC L & T 0B596 2. RG.OC1 12 Cu.M. Shovel RG. OC2 L & T 20213 3. RG.OC1 100T Dumper RG. OC2 KOMATSU 10242 4. RG.OC1 100T Dumper RG. OC2 KOMATSU 10243 5. RG.OC1 100T Dumper RG. OC2 KOMATSU 10250 6. RG.OC1 100T Dumper RG. OC2 KOMATSU 10251 7. RG.OC1 150mm Drill RG. OC2 ATLAS CAPCO 06728 8. RG.OC1 150mm Drill RG. OC2 ATLAS CAPCO 06729 9. RG.OC1 150mm Drill RG. OC2 ATLAS CAPCO 29607 10. DOR.OC2 3.0 Cu.M. Shovel DOR.OC1 L & T 0B589 11. DOR.OC2 35T Dumper KRG.OC Hindustan 00280 12. DOR.OC1 35T Dumper KRG. OC Hindustan 00745 13. DOR.OC2 155 Dozer DOR.OC1 BEML 12656 14. DOR.OC1 Loader KRG OC TATA 02432 15. RK. OC 35T Dumper SRP OC1 Hindustan 00768 16. RK. OC 35T Dumper SRP OC1 Hindustan 00769 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Jul-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|DORL1 |DORL2 | Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.71| 2.37| 5.08| | 0.70| 2.63| 3.33| 6.42| 3.07| 3.42| 3.00| 0.50| 3.50| 1.08| 1.75| | 1.22| | 2.97| | 0.52| 1.38| 1.90| 30.77| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.71| 2.37| 5.08| | 0.70| 2.63| 3.33| 6.42| 3.07| 3.42| 3.00| 0.50| 3.50| 1.08| 1.75| | 1.22| | 2.97| | 0.52| 1.38| 1.90| 30.77| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.28| 2.92| 5.20| | 0.67| 2.42| 3.09| 5.34| 3.17| 3.23| 3.13| 0.63| 3.76| 0.10| 2.02| 0.05| 1.34| | 3.40| | 0.38| 1.09| 1.46| 28.76| | - Contractor | | 0.40| 0.40| | | | | 1.29| | | | 1.53| 1.53| | | | | | | | | 0.29| 0.29| 3.51| | - Total | 2.28| 3.33| 5.60| | 0.67| 2.42| 3.09| 6.63| 3.17| 3.23| 3.13| 2.17| 5.30| 0.10| 2.02| 0.05| 1.34| | 3.40| | 0.38| 1.37| 1.75| 32.27| | % Achievement | 84| 140| 110| | 96| 92| 93| 103| 103| 94| 104| 433| 151| 10| 115| | 110| | 115| | 72| 100| 92| 105| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.00| | 0.00| | | | | 0.81| | | | | 0.81| | | | 0.12| | 0.12| | 1.51| | 1.51| 2.44| | % Rehandle in Total | 0| | 0| | | | | 15| | | | | 22| | | | 9| | 3| | 401| | 103| 8| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 3.68| 2.90| | 2.90| | | | | | | | | | | 6.58| | -Shovels | 6.47| | 6.47| | | | | 20.81| 1.40| 18.73| 28.93| 1.20| 30.13| | | | | | | 0.87| | | | 78.41| | -Total | 6.47| | 6.47| | | | | 20.81| 1.40| 22.41| 31.83| 1.20| 33.03| | | | | | | 0.87| | | | 84.99| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 7.00| 19.50| 3.00| | 7.00| 10.00| 29.00| 12.00| 9.00| | 15.00| 15.00| 9.50| 9.00| 2.40| 15.87| | 27.27| | 3.03| 6.97| 10.00| 141.27| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.97| 7.00| 25.97| 3.00| | 7.00| 10.00| 49.81| 13.40| 31.41| 31.83| 16.20| 48.03| 9.50| 9.00| 2.40| 15.87| | 27.27| 0.87| 3.03| 6.97| 10.00| 226.26| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 4.05| 1.95| | 1.95| | | | | | | | | | | 6.00| | -Shovels | 5.04| 0.15| 5.19| | 0.28| | 0.28| 10.68| 0.05| 14.40| 25.41| | 25.41| | 0.03| | | 0.09| 0.12| 0.11| | | | 56.23| | -Total | 5.04| 0.15| 5.19| | 0.28| | 0.28| 10.68| 0.05| 18.45| 27.36| | 27.36| | 0.03| | | 0.09| 0.12| 0.11| | | | 62.22| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 11.92| 9.47| 21.39| | | 9.31| 9.31| 26.64| 6.48| 6.79| | 11.03| 11.03| 1.08| 12.84| | 10.49| | 23.33| | 2.62| 4.28| 6.90| 112.93| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 16.96| 9.62| 26.58| | 0.28| 9.31| 9.59| 37.32| 6.52| 25.24| 27.36| 11.03| 38.39| 1.08| 12.86| | 10.49| 0.09| 23.44| 0.11| 2.62| 4.28| 6.90| 175.16| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 110| 67| | 67| | | | | | | | | | | 91| | -Shovels | 78| | 80| | | | | 51| 3| 77| 88| | 84| | | | | | | 13| | | | 72| | -Total | 78| | 80| | | | | 51| 3| 82| 86| | 83| | | | | | | 13| | | | 73| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 95| 135| 110| | | 133| 93| 92| 54| 75| | 74| 74| 11| 143| | 66| | 86| | 87| 61| 69| 80| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 89| 137| 102| | | 133| 96| 75| 49| 80| 86| 68| 80| 11| 143| | 66| | 86| 13| 87| 61| 69| 77| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.36| 1.63| | 1.63| | | | | | | | | | | 2.99| | - Shovels | | | | | | | | | | 0.40| | 11.79| 11.79| | | | | | | | | | | 12.19| | - Total | | | | | | | | | | 1.76| 1.63| 11.79| 13.42| | | | | | | | | | | 15.18| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 10| 6| | 49| | | | | | | | | | | 24| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 79| 133| 88| | 157| 92| 106| 57| 63| 83| 87| 27| 84| 10| 117| | 110| | 120| 13| 72| 79| 77| 77| | % Utiln. of Excav.Cap. | 126| 124| 125| | 73| | 73| 100| 99| 155| 141| 185| 155| | 137| 6| 129| 26| 97| 21| 122| | 122| 132| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Jul-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|DORL1 |DORL2 | Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 90| | | 72| 65| | 85| 90| 88| 90| 89| | 78| 90| 44| 85| 26| | | 66| 66| | | | - In O B | 88| 82| | | 72| 88| | 80| 15| 82| 90| 89| | 81| 90| 44| | 26| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 2| 8| | | 6| 2| | 10| | 8| | 1| | 6| | | 5| | | | 9| 9| | | | - Strikes | | | | | | | | | | | | | | | | 12| | | | | 12| 12| | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | 25| | | | | | | | | | 22| | 52| | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10423| 9115| 19538| | 2673| 8767| 11440| 21400| 11808| 13154| 11538| 1923| 13462| 4154| 6731| | 4692| | 11423| | 2000| 5308| 7308| 113686| | Actual | 7592| 9742| 17333| | 2792| 11165| 13957| 18862| 10572| 10996| 10433| 2131| 12564| 395| 6723| 317| 4735| | 11775| | 1705| 4951| 6656| 103110| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 24885| | 24885| | | | | 69367| 5385| 86192|122423| 4615|127038| | | | | | | | | | | 312867| | Actual | 17185| 533| 17718| | 1177| | 1177| 40033| 946| 67500| 91194| | 91194| | 83| | | 1038| 1122| | | | | 219689| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 11.23| 44.46| 19.36| | 9.53| 81.64| 30.91| 8.89| 15.87| 8.66| 7.92| 5.93| 7.50| 4.41| 28.03| 1.95| 22.91| | 22.06| | 21.78| 22.23| 22.11| 12.57| | Simple Formula | 11.67| 44.46| 19.94| | 9.53| 81.64| 30.91| 13.23| 25.21| 9.05| 5.52| 12.84| 6.11| 4.41| 28.03| 1.95| 22.91| | 22.06| | 21.78| 22.23| 22.11| 13.65| | Excavation(Cu.M)| 33.62| 31.85| 33.18| | 10.37| 54.43| 23.43| 35.24| 17.18| 57.77| 51.97| 8.56| 48.50| 2.94| 19.04| 1.30| 15.27| | 15.45| | 14.52| 14.82| 14.74| 38.64| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 917| 281| 1198| | 325| 145| 470| 1873| 561| 1569| 2554| 219| 2773| | 333| 126| 266| 17| 742| | 79| 223| 302| 9488| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 14.72| 10.55| 25.27| | 2.29| 0.11| 2.40| 13.18| 4.76| 25.82| 10.09| 1.31| 11.41| 0.48| 8.39| 0.54| 6.23| 0.04| 15.20| | 1.05| 2.99| 4.03| 102.55| | - Cost/Cu.M (Rs.) | 2.24| 5.04| 2.92| | 3.14| 0.07| 1.02| 0.93| 2.20| 1.25| 0.34| 3.11| 0.38| 7.02| 6.12| 17.53| 6.96| 0.42| 6.37| | 4.19| 4.11| 4.13| 1.26| | - Cost/MOR/MTH (Rs.)|1605.2|3753.4|2109.1| | 705.3| 73.8| 510.5| 703.8| 848.8|1645.9| 395.2| 598.8| 411.3| |2518.7| 431.1|2341.1| 224.2|2048.0| |1327.7|1338.7|1335.9| 1080.8| | PLD Allowance-Rs.Lakhs | 18.71| 5.86| 24.57| | 4.69| 2.86| 7.55| 42.62| 12.84| 43.63| 57.58| 4.74| 62.32| 1.55| 6.15| 1.10| 4.31| 0.07| 11.63| | 1.27| 3.60| 4.87| 211.57| | - Cost/Cu.M (Rs.) | 2.85| 2.80| 2.84| | 6.43| 1.77| 3.22| 2.99| 5.94| 2.12| 1.96| 11.24| 2.09| 22.60| 4.49| 35.39| 4.82| 0.78| 4.87| | 5.06| 4.96| 4.99| 2.60| | - Cost/MOR/MTH (Rs.)|2040.1|2086.1|2050.9| |1442.1|1971.8|1605.5|2275.5|2288.6|2780.5|2254.7|2163.5|2247.5| |1846.2| 870.4|1620.4| 413.8|1566.7| |1602.3|1615.6|1612.1| 2229.8| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.45| 0.31| 0.41| | 0.45| | 0.14| 0.75| 0.52| 0.72| 0.57| 0.42| 0.52| | 0.51| 1.13| 0.51| 0.17| 0.50| 0.49| 2.51| | 0.64| 0.58| | b)Other Equipments | 0.35| 0.36| 0.36| | 0.66| 0.01| 0.21| 0.35| 0.56| 0.29| 0.32| 0.29| 0.32| | 0.49| 3.80| 0.64| 0.62| 0.59| 0.89| 2.55| | 0.65| 0.34| | c)Total | 0.80| 0.67| 0.77| | 1.11| 0.01| 0.35| 1.10| 1.08| 1.02| 0.89| 0.71| 0.84| | 0.99| 4.93| 1.15| 0.78| 1.10| 1.39| 5.06| | 1.30| 0.93| | d)Dumpers(Ltr/CuM/KM) | 0.32| 0.27| | | 0.40| | | 0.26| 0.31| 0.22| 0.27| 0.21| | | 0.26| 0.56| 0.28| 0.34| | 0.49| 1.11| | | | | e)Lubricants -Ltrs | 14746| 10749| 25495| | 2200| | 2200| 44156| 8797| 56396| 42222| 26510| 68732| | 4583| 715| 1992| 381| 7671| | 5031| | 5031| 327607| | -Ltrs/CuM| 0.02| 0.05| 0.03| | 0.03| | 0.01| 0.03| 0.04| 0.03| 0.02| 0.02| 0.02| | 0.03| 0.23| 0.02| 0.04| 0.03| | 0.20| | 0.05| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 4.57| 4.26| 4.39| | 8.51| | 8.51| 3.92| 9.82| 6.74| 2.44| | 2.93| | 2.79| 1.38| 2.10| | 2.44| | 3.93| 4.01| 3.99| 3.70| | Shovel-O B(CuM/Kg)| 2.02| 8.20| 2.06| | | | | 1.78| 0.39| 2.03| 3.38| | 3.38| | | | | | | | | | | 2.42| | Dragline -O B(CuM/Kg)| | | | | | | | | | 2.76| | | | | | | | | | | | | | 4.08| | b)% Cap Sensitive | 26.04| 30.31| 27.50| | 2.22| | 2.22| 2.91| 24.24| 0.74| 3.85| 0.00| 2.79| | 3.73| 20.00| 8.06| | 5.04| | 94.26| 94.26| 94.26| 16.01| | c)Total Explosives(T) | 862| 449| 1312| | 8| | 8| 1553| 184| 904| 880| 334| 1213| | 415| 3| 162| | 580| | 133| 379| 512| 6267| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Jul-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|DORL1 |DORL2 | Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 247| 207| | 207| | | | | | | | | | | 230| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 89| 85| | 85| | | | | | | | | | | 87| | d)% Utilisation-SSH | | | | | | | | | | 80| 68| | 68| | | | | | | | | | | 74| | -MAH | | | | | | | | | | 89| 80| | 80| | | | | | | | | | | 85| | e)Down time/Hr worked | | | | | | | | | | 0.14| 0.22| | 0.22| | | | | | | | | | | 0.17| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 5| 2| 7| | 2| | 2| 7| 4| 1| 3| | 3| | 2| 1| 1| 1| 5| 1| 2| | 2| 32| | TOTAL | 7| 2| 9| | 2| | 2| 16| 4| 11| 12| 5| 17| | 2| 1| 1| 1| 5| 1| 2| | 2| 67| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 126| 124| 125| | 73| | 73| 100| 99| 139| 131| 185| 150| | 137| 6| 129| 26| 97| 21| 122| | 122| 126| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 82| 83| 82| | 92| | 92| 84| 69| 89| 86| 93| 88| | 91| 91| 88| 94| 90| 69| 97| | 97| 86| | d)% Utilisation-SSH | 57| 66| 59| | 50| | 50| 46| 48| 57| 58| 66| 60| | 60| 18| 55| 17| 47| 34| 66| | 66| 54| | -MAH | 69| 79| 72| | 54| | 54| 55| 70| 64| 67| 71| 68| | 66| 20| 63| 18| 52| 50| 68| | 68| 63| | e)Down time/Hr worked | 0.32| 0.26| 0.31| | 0.16| | 0.16| 0.34| 0.64| 0.19| 0.25| 0.10| 0.20| | 0.14| 0.53| 0.21| 0.37| 0.20| 0.92| 0.04| | 0.04| 0.27| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 39| 22| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 7| | 7| | | | | | | | | | | 52| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 30| 14| 44| | 9| | 9| 50| 27| 34| 33| | 33| | 11| 4| 9| 2| 26| 5| 15| | 15| 243| | TOTAL | 43| 14| 57| | 9| | 9| 98| 27| 94| 79| 22| 101| | 11| 4| 9| 2| 26| 5| 15| | 15| 432| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 85| 59| 79| | 74| | 74| 80| 73| 80| 75| 94| 80| | 92| 42| 79| 93| 81| 61| 63| | 63| 78| | c)% Utilisation-SSH | 40| 37| 39| | 30| | 30| 37| 29| 36| 41| 60| 46| | 40| 5| 39| 14| 34| 18| 33| | 33| 38| | -MAH | 46| 63| 49| | 41| | 41| 46| 40| 45| 55| 64| 57| | 43| 11| 49| 15| 42| 29| 53| | 53| 48| | f)Down time/Hr worked | 0.37| 1.09| 0.54| | 0.86| | 0.86| 0.55| 0.95| 0.56| 0.59| 0.10| 0.44| | 0.20| 12.25| 0.54| 0.46| 0.54| 2.19| 1.14| | 1.14| 0.57| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 1| 2| | 3| 1| 1| 1| 6| 1| 3| | 3| 37| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 9| 21| | 3| 1| 1| 1| 6| 1| 3| | 3| 77| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 59| 38| 52| | 76| | 76| 55| 72| 58| 69| 79| 73| | 84| 92| 88| 96| 87| 66| 64| | 64| 64| | c)% Utilisation-SSH | 29| 15| 25| | 19| | 19| 27| 19| 29| 34| 30| 32| | 19| 19| 24| 20| 21| 33| 20| | 20| 27| | -MAH | 49| 40| 47| | 25| | 25| 50| 26| 50| 50| 38| 44| | 23| 20| 28| 21| 24| 50| 31| | 31| 42| | f)Down time/Hr worked | 1.40| 4.06| 1.94| | 1.29| | 1.29| 1.65| 1.50| 1.47| 0.91| 0.69| 0.83| | 0.82| 0.44| 0.50| 0.19| 0.62| 1.03| 1.83| | 1.83| 1.31| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Jul-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2011 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|DORL1 |DORL2 | Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 6| 5| | 5| | | | | | | | | | | 18| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 6| 1| 5| 6| | 6| | 1| 1| 1| | 3| | 1| | 1| 29| | TOTAL | 4| 2| 6| | 2| | 2| 12| 3| 11| 11| 3| 14| | 1| 1| 1| | 3| | 1| | 1| 52| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 25.78| 25.84| 25.80| | 0.00| | 0.00| 30.66| 26.04| 21.95| 29.36| 14.96| 29.20| | 29.97| 21.71| 42.31| | 33.85| | 28.02| | 28.02| 27.07| | c)% Availability | 88| 52| 77| | 88| | 88| 81| 77| 84| 75| 66| 73| | 90| 86| 96| | 91| | 98| | 98| 80| | d)% Utilisation-SSH | 37| 18| 31| | 4| | 4| 23| 8| 28| 33| 1| 27| | 25| 2| 17| | 15| | 24| | 24| 24| | -MAH | 43| 34| 41| | 5| | 5| 28| 11| 33| 45| 2| 37| | 28| 3| 17| | 17| | 25| | 25| 30| | e)Down time/Hr worked | 0.32| 2.70| 0.74| | 2.73| | 2.73| 0.85| 2.82| 0.55| 0.76| 22.64| 1.01| | 0.38| 6.07| 0.25| | 0.60| | 0.10| | 0.10| 0.84| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| | 1| 1| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| | 1| | 1| 5| 2| 1| | 3| 3| | | | 1| | 1| | 1| | 1| 16| | GRADER | 3| 1| 4| | 2| | 2| 8| 3| 6| 6| 4| 10| | 2| | 1| 1| 4| | 2| | 2| 39| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 7| 3| 10| | 2| 1| 2| | 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 7| 1| 8| 29| 9| 13| 15| 16| 31| | 6| 1| 6| 2| 14| 1| 6| | 6| 126| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 41| 68| | 75| 73| 74| 78| 68| 80| 72| 70| 71| | 88| 98| 90| 94| 90| 84| 89| | 89| 76| | c)% Utilisation-SSH | 32| 18| 27| | 17| 12| 16| 27| 33| 37| 29| 18| 23| | 27| 7| 20| 11| 22| 17| 24| | 24| 25| | -MAH | 39| 44| 40| | 22| 17| 21| 34| 48| 46| 40| 25| 33| | 30| 7| 23| 12| 25| 20| 27| | 27| 33| | d)Down time/Hr worked | 0.60| 3.29| 1.18| | 1.53| 2.22| 1.60| 0.82| 0.99| 0.54| 1.00| 1.72| 1.28| | 0.44| | 0.50| 0.56| 0.46| 0.97| 0.45| | 0.45| 0.97| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 70| 26| 96| | 22| 1| 23| 173| 47| 143| 130| 55| 185| | 23| 8| 17| 6| 54| 8| 27| | 27| 756| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 82| 55| 75| | 77| 73| 77| 77| 71| 79| 75| 84| 78| | 90| 68| 84| 94| 85| 65| 73| | 73| 78| | c)% Utilisation-SSH | 39| 33| 38| | 25| 12| 24| 34| 29| 37| 40| 42| 41| | 35| 8| 33| 15| 30| 22| 32| | 32| 36| | -MAH | 48| 59| 50| | 32| 17| 31| 44| 41| 46| 54| 50| 52| | 39| 12| 39| 16| 35| 33| 44| | 44| 46| | d)Down time/Hr worked | 0.45| 1.36| 0.66| | 0.92| 2.22| 0.95| 0.67| 0.97| 0.57| 0.61| 0.39| 0.54| | 0.29| 3.86| 0.47| 0.39| 0.49| 1.60| 0.86| | 0.86| 0.62| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | | 5.41| 3.58| | 3.58| | | | | | | | | | | 8.99| |b)Shovels(LCu.M)-Cap. | 5.19| 1.69| 6.88| | 1.00| | 1.00| 14.75| 2.15| 12.23| 12.66| 6.59| 19.26| | 1.00| 0.50| 0.75| 0.25| 2.50| 0.50| 1.03| | 1.03| 60.30| | -OB | 5.01| 0.15| 5.15| | 0.28| | 0.28| 10.67| 0.05| 14.80| 14.56| 11.79| 26.35| | 0.03| | | 0.07| 0.09| 0.11| | | | 57.49| | -Coal(LT) | 2.28| 2.92| 5.20| | 0.67| | 0.67| 6.15| 3.13| 3.23| 3.13| 0.63| 3.76| | 2.02| 0.05| 1.46| | 3.52| | 1.88| | 1.88| 27.55| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month: Sl.No. Mine Description Make Mfg.Sr.No. 1. RG.OC3 250MM Drill ATLAS 10178 List of Surveyed Off HEMM during the month Sl.No. Mine Description Make Mfg.Sr.No. 1. RG.OC1 85T Dumper BEML 01631 2. RG.OC1 85T Dumper BEML 01632 3. RG.OC1 85T Dumper BEML 01633 4. RG.OC1 85T Dumper BEML 01634 List of HEMM transferred during the month Sl.No. From Description To Make Mfg.Sr.No. 1. Dorli OC1 3.0 Cu.M. Shovel Dorli OC2 BEML 0B589 2. Dorli OC1 1.0 Cu.M. Shovel Dorli OC2 Telecon 07730 3. Dorli OC1 35T Dumper Dorli OC2 CPIL 00280 4. Dorli OC1 35T Dumper Dorli OC2 CPIL 00281 5. Dorli OC1 Dozer Dorli OC2 BEML 12656 6. Dorli OC1 Grader Dorli OC2 BEML 06518 7. RG.OC2 100T Dumper RG.OC1 KOMATSU 10251 8. RG.OC2 100T Dumper RG.OC1 KOMATSU 10250 9. RG.OC2 100T Dumper RG.OC1 KOMATSU 10243 10. RG.OC2 100T Dumper RG.OC1 KOMATSU 10242 11. RG.OC2 150MM Drill RG.OC1 SRECP 29608 12. RG.OC2 150MM Drill RG.OC1 ATLAS 06728 13. RG.OC2 150MM Drill RG.OC1 ATLAS 06726 14. RG.OC2 5.0 Cu.M. Shovel RG.OC1 L&T Komatsu 20634 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jun-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2011 +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.71| 2.37| 5.08| 0.70| 2.63| 3.33| 6.42| 3.07| 3.42| 3.00| 0.50| 3.50| 1.08| 1.75| | 1.22| 2.97| | 0.52| 1.38| 1.90| 30.77| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.71| 2.37| 5.08| 0.70| 2.63| 3.33| 6.42| 3.07| 3.42| 3.00| 0.50| 3.50| 1.08| 1.75| | 1.22| 2.97| | 0.52| 1.38| 1.90| 30.77| | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.13| 2.56| 4.69| 0.56| 2.42| 2.99| 4.83| 2.67| 3.23| 3.52| 1.05| 4.57| 0.55| 1.91| 0.12| 1.23| 3.26| | 0.67| 0.24| 0.91| 27.71| | - Contractor | | 0.37| 0.37| | | | 1.23| | | | 0.77| 0.77| | 0.02| | | 0.02| | | 0.52| 0.52| 2.92| | - Total | 2.13| 2.94| 5.06| 0.56| 2.42| 2.99| 6.06| 2.67| 3.23| 3.52| 1.82| 5.34| 0.55| 1.93| 0.12| 1.23| 3.28| | 0.67| 0.76| 1.43| 30.63| | % Achievement | 78| 124| 100| 80| 92| 90| 94| 87| 95| 117| 364| 153| 51| 110| | 101| 110| | 129| 55| 75| 100| | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.04| | 0.04| | | | 0.81| | | | | 0.81| | | | | | | 0.87| | 0.87| 1.72| | % Rehandle in Total | 2| | 1| | | | 17| | | | | 18| | | | | | | 130| | 95| 6| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 3.68| 2.90| | 2.90| | | | | | | | | | 6.58| | -Shovels | 6.47| | 6.47| | | | 22.72| 1.40| 18.73| 28.93| 1.50| 30.43| | | | | | 0.87| | | | 80.62| | -Total | 6.47| | 6.47| | | | 22.72| 1.40| 22.41| 31.83| 1.50| 33.33| | | | | | 0.87| | | | 87.20| | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 10.00| 22.50| 5.00| 13.00| 18.00| 29.00| 19.39| 11.00| | 17.00| 17.00| 12.00| 15.00| 2.40| 15.86| 33.26| | 6.36| 14.63| 20.99| 183.14| | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.97| 10.00| 28.97| 5.00| 13.00| 18.00| 51.72| 20.79| 33.41| 31.83| 18.50| 50.33| 12.00| 15.00| 2.40| 15.86| 33.26| 0.87| 6.36| 14.63| 20.99| 270.34| | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 3.60| 1.19| | 1.19| | | | | | | | | | 4.79| | -Shovels | 5.53| 0.42| 5.95| 0.21| | 0.21| 12.55| 0.07| 15.30| 31.90| | 31.90| | 0.01| | | 0.01| 0.09| | | | 66.08| | -Total | 5.53| 0.42| 5.95| 0.21| | 0.21| 12.55| 0.07| 18.90| 33.09| | 33.09| | 0.01| | | 0.01| 0.09| | | | 70.87| | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 11.43| 11.31| 22.74| | 9.55| 9.55| 31.01| 6.69| 7.50| | 11.79| 11.79| 6.74| 17.33| | 13.09| 30.42| | 1.06| 10.60| 11.65| 138.10| | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 16.96| 11.73| 28.69| 0.21| 9.55| 9.76| 43.56| 6.76| 26.40| 33.09| 11.79| 44.89| 6.74| 17.34| | 13.09| 30.43| 0.09| 1.06| 10.60| 11.65| 208.97| | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 98| 41| | 41| | | | | | | | | | 73| | -Shovels | 85| | 92| | | | 55| 5| 82| 110| | 105| | | | | | 11| | | | 82| | -Total | 85| | 92| | | | 55| 5| 84| 104| | 99| | | | | | 11| | | | 81| | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 91| 113| 101| | 73| 53| 107| 35| 68| | 69| 69| 56| 116| | 83| 91| | 17| 72| 56| 75| | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 89| 117| 99| 4| 73| 54| 84| 33| 79| 104| 64| 89| 56| 116| | 83| 91| 11| 17| 72| 56| 77| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 1.50| 2.64| | 2.64| | | | | | | | | | 4.14| | - Shovels | | | | | | | | | 0.50| | 15.34| 15.34| | | | | | | | | | 15.84| | - Total | | | | | | | | | 2.00| 2.64| 15.34| 17.97| | | | | | | | | | 19.97| | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 11| 8| | 54| | | | | | | | | | 28| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 93| 135| 99| 126| 92| 99| 58| 54| 85| 105| 38| 101| 51| 110| | 101| 110| 11| 129| 18| 48| 84| | % Utiln. of Excav.Cap. | 70| 75| 71| 29| | 29| 58| 45| 81| 90| 109| 96| | 64| 8| 40| 43| 9| 48| | 48| 75| +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jun-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2011 +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 90| | 72| 77| | 86| 90| 92| 93| 92| | 90| 93| 70| 93| | | 90| 90| | | | - In O B | 93| 93| | 72| 93| | 86| 18| 92| 93| 92| | 90| 93| 70| | | 52| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | 3| | 6| | | 4| | 1| | 1| | | | | | | | 3| 3| | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 16| | | | | | | | | | 8| | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10423| 9115| 19538| 2692| 8484| 11176| 21400| 11808| 13154| 11538| 1923| 13462| 4154| 6731| | 4692| 11423| | 2000| 5308| 7308| 113422| | Actual | 6862| 8542| 15404| 2342| 9446| 11788| 16849| 8913| 10548| 11363| 3413| 14776| 1842| 6167| 520| 3968| 10655| | 2231| 806| 3037| 93811| | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 24885| | 24885| | | | 75733| 5385| 86192|122423| 5769|128192| | | | | | 3346| | | | 323733| | Actual | 20123| 1361| 21484| 885| | 885| 43779| 1126| 61630|106754| |106754| | 28| | | 28| 540| | | | 236226| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 11.60| 39.96| 18.95| 8.38| 76.84| 30.27| 9.79| 14.07| 8.70| 9.66| 9.24| 9.56| 22.48| 26.31| 4.60| 21.32| 20.81| | 14.24| 13.91| 14.15| 13.14| | Simple Formula | 10.65| 39.96| 17.78| 8.38| 76.84| 30.27| 11.92| 22.04| 8.92| 6.30| 20.02| 7.48| 22.48| 26.31| 4.60| 21.32| 20.81| | 14.24| 13.91| 14.15| 13.14| | Excavation(Cu.M)| 38.34| 33.22| 37.10| 8.75| 51.23| 22.33| 38.92| 15.25| 58.04| 63.43| 13.35| 59.14| 14.99| 17.66| 3.06| 14.21| 13.93| | 9.49| 9.28| 9.43| 42.71| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 918| 280| 1198| 326| 146| 472| 1877| 544| 1567| 2511| 233| 2744| 109| 331| 139| 266| 736| 46| 212| 78| 290| 9583| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 4.10| 7.13| 11.23| 0.02| 0.01| 0.02| 10.45| 4.67| 15.08| 8.04| 1.70| 9.74| 0.05| 4.79| 0.30| 2.75| 7.84| 0.12| 0.57| 0.21| 0.78| 59.98| | - Cost/Cu.M (Rs.) | 0.54| 3.35| 1.15| 0.03| 0.00| 0.01| 0.66| 2.52| 0.72| 0.23| 2.44| 0.27| 0.12| 3.73| 3.69| 3.36| 3.59| 1.26| 1.27| 1.30| 1.28| 0.67| | - Cost/MOR/MTH (Rs.)| 446.8|2546.8| 937.6| 4.6| 5.1| 4.8| 557.0| 858.6| 962.5| 320.1| 729.8| 354.9| 41.3|1446.5| 214.9|1034.5|1065.0| 256.8| 267.0| 268.4| 267.4| 625.9| | PLD Allowance-Rs.Lakhs | 18.86| 5.65| 24.50| 2.00| 2.80| 4.79| 41.86| 12.26| 42.76| 57.66| 5.10| 62.76| 1.58| 6.10| 1.06| 4.39| 11.54| 0.18| 3.21| 1.19| 4.39| 206.62| | - Cost/Cu.M (Rs.) | 2.46| 2.65| 2.50| 3.40| 1.73| 2.18| 2.65| 6.63| 2.03| 1.63| 7.31| 1.74| 4.30| 4.75| 13.09| 5.35| 5.28| 1.90| 7.18| 7.35| 7.23| 2.29| | - Cost/MOR/MTH (Rs.)|2054.1|2016.6|2045.4| 612.3|1915.7|1015.5|2230.0|2253.5|2728.5|2296.2|2189.8|2287.2|1452.1|1841.5| 762.2|1648.7|1568.0| 386.2|1512.0|1519.9|1514.1| 2156.1| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.39| 0.27| 0.36| 0.53| | 0.14| 0.78| 0.63| 0.68| 0.48| 0.52| 0.48| | 0.49| 0.71| | 0.32| 0.55| 0.84| | 0.62| 0.55| | b)Other Equipments | 0.33| 0.40| 0.34| 0.71| 0.01| 0.20| 0.34| 0.66| 0.29| 0.23| 0.35| 0.29| | 0.52| 2.12| 0.07| 0.41| 0.93| 1.44| | 1.06| 0.32| | c)Total | 0.72| 0.67| 0.71| 1.24| 0.01| 0.34| 1.12| 1.28| 0.97| 0.71| 0.87| 0.77| | 1.01| 2.83| 0.07| 0.73| 1.48| 2.28| | 1.67| 0.87| | d)Dumpers(Ltr/CuM/KM) | 0.30| 0.30| | 0.48| | | 0.25| 0.32| 0.22| 0.01| 0.02| | | 0.28| 0.33| | | 0.47| 0.48| | | | | e)Lubricants -Ltrs | 16094| 11898| 27992| 3724| | 3724| 45859| 7875| 52388| 33053| 23460| 56513| | 3008| 843| 3907| 7758| 475| 4927| | 4927| 308425| | -Ltrs/CuM| 0.02| 0.06| 0.03| 0.06| | 0.02| 0.03| 0.04| 0.03| 0.01| 0.34| 0.02| | 0.02| 0.10| 0.05| 0.04| 0.05| 0.11| | 0.08| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 5.32| 4.01| 4.51| | | | 4.40| 9.79| 5.97| 2.83| 17.09| 3.50| | 2.53| 0.94| 5.18| 2.91| | 23.97| 23.41| 23.82| 4.22| | Shovel-O B(CuM/Kg)| 2.46| 7.98| 2.57| | | | 1.81| | 3.18| 4.60| | 4.52| | | | | | | | | | 3.12| | Dragline -O B(CuM/Kg)| | | | | | | | | 1.22| 1.44| | 1.44| | | | | | | | | | 1.27| | b)% Cap Sensitive | 24.76| 40.80| 29.56| | | | 1.67| 9.99| 0.20| 4.99| 0.00| 3.26| | 2.55| 17.67| 9.56| 3.34| | 87.94| 97.38| 93.89| 8.51| | c)Total Explosives(T) | 836| 357| 1193| | | | 1752| 273| 831| 901| 476| 1378| | 641| 13| 51| 705| | 18| 31| 50| 6182| +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jun-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2011 +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 116| 111| | 111| | | | | | | | | | 114| | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 81| 88| | 88| | | | | | | | | | 85| | d)% Utilisation-SSH | | | | | | | | | 72| 72| | 72| | | | | | | | | | 72| | -MAH | | | | | | | | | 88| 83| | 83| | | | | | | | | | 85| | e)Down time/Hr worked | | | | | | | | | 0.26| 0.17| | 0.17| | | | | | | | | | 0.21| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| | 3| 3| | | | | | | | | | 5| | 3.0 Cu.M | 5| 2| 7| 2| | 2| 7| 4| 1| 3| | 3| | 2| 1| 2| 5| 1| 2| | 2| 32| | TOTAL | 7| 2| 9| 2| | 2| 16| 4| 11| 11| 6| 17| | 2| 1| 2| 5| 1| 2| | 2| 67| | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 70| 75| 71| 29| | 29| 58| 45| 74| 86| 109| 95| | 64| 8| 40| 43| 9| 48| | 48| 73| | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 86| 80| 84| 81| | 81| 82| 74| 83| 86| 94| 89| | 94| 91| 88| 91| 73| 95| | 95| 84| | d)% Utilisation-SSH | 60| 61| 60| 44| | 44| 51| 51| 56| 65| 75| 68| | 59| 33| 42| 47| 41| 58| | 58| 58| | -MAH | 70| 77| 72| 54| | 54| 63| 69| 68| 75| 80| 77| | 63| 36| 48| 52| 56| 62| | 62| 68| | e)Down time/Hr worked | 0.24| 0.33| 0.26| 0.43| | 0.43| 0.35| 0.52| 0.31| 0.22| 0.08| 0.16| | 0.11| 0.27| 0.29| 0.19| 0.66| 0.09| | 0.09| 0.27| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | 122| | 85 T | 8| | 8| | | | 13| | 24| 11| | 11| | | | | | | | | | 56| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | 15| | 35 T | 30| 14| 44| 9| | 9| 50| 27| 34| 33| | 33| | 11| 4| 11| 26| 5| 15| | 15| 243| | TOTAL | 43| 14| 57| 9| | 9| 98| 27| 94| 79| 26| 105| | 11| 4| 11| 26| 5| 15| | 15| 436| | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 86| 57| 79| 74| | 74| 76| 81| 81| 72| 96| 78| | 94| 94| 84| 91| 68| 67| | 67| 79| | c)% Utilisation-SSH | 41| 33| 39| 31| | 31| 41| 26| 36| 44| 69| 50| | 29| 8| 31| 27| 23| 26| | 26| 39| | -MAH | 48| 58| 50| 42| | 42| 54| 33| 45| 60| 72| 64| | 31| 8| 37| 30| 34| 38| | 38| 50| | f)Down time/Hr worked | 0.34| 1.29| 0.54| 0.85| | 0.85| 0.59| 0.70| 0.53| 0.63| 0.06| 0.43| | 0.20| 0.78| 0.52| 0.34| 1.40| 1.29| | 1.29| 0.54| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| 2| | 2| 12| 4| 3| 1| 1| 2| | 3| 1| 2| 6| 1| 3| | 3| 37| | D355 A-3 | 3| 2| 5| | | | 6| | 10| 11| 8| 19| | | | | | | | | | 40| | TOTAL | 6| 3| 9| 2| | 2| 18| 4| 13| 12| 9| 21| | 3| 1| 2| 6| 1| 3| | 3| 77| | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 58| 75| 75| | 75| 64| 80| 58| 70| 74| 72| | 86| 90| 100| 91| 44| 85| | 85| 70| | c)% Utilisation-SSH | 37| 22| 32| 18| | 18| 31| 14| 32| 36| 32| 34| | 19| 18| 25| 21| 37| 26| | 26| 30| | -MAH | 44| 38| 43| 24| | 24| 49| 18| 55| 51| 43| 48| | 23| 21| 25| 23| 82| 30| | 30| 43| | f)Down time/Hr worked | 0.44| 1.90| 0.76| 1.43| | 1.43| 1.18| 1.42| 1.30| 0.84| 0.81| 0.83| | 0.74| 0.56| | 0.42| 1.52| 0.59| | 0.59| 0.99| +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jun-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2011 +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 5| 5| | 5| | | | | | | | | | 17| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | 2| | 152 mm | | | | | | | | 1| | | 2| 2| | | | | | | | | | 3| | 150 mm | 3| 2| 5| 2| | 2| 6| 1| 5| 3| 3| 6| | 1| 1| 1| 3| | 1| | 1| 29| | TOTAL | 4| 2| 6| 2| | 2| 12| 3| 10| 8| 6| 14| | 1| 1| 1| 3| | 1| | 1| 51| | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 27.59| 24.14| 26.93| 0.00| | 0.00| 31.49| 24.25| 19.80| 26.76| 29.58| 27.10| | 29.04| 37.83| 23.54| 29.08| | 13.16| | 13.16| 25.59| | c)% Availability | 78| 46| 68| 93| | 93| 86| 61| 76| 73| 79| 75| | 93| 97| 100| 97| | 94| | 94| 78| | d)% Utilisation-SSH | 35| 18| 30| 1| | 1| 22| 7| 33| 29| 7| 21| | 33| 5| 7| 16| | 7| | 7| 23| | -MAH | 45| 40| 44| 1| | 1| 26| 11| 44| 40| 8| 27| | 36| 5| 7| 17| | 8| | 8| 29| | e)Down time/Hr worked | 0.63| 2.95| 1.08| 5.93| | 5.93| 0.64| 5.59| 0.72| 0.94| 3.09| 1.21| | 0.21| 0.57| | 0.21| | 0.91| | 0.91| 0.97| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| | 2| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 5| 2| 1| | 3| 3| | | | 1| 1| | 1| | 1| 16| | GRADER | 3| 1| 4| 2| | 2| 8| 3| 6| 6| 4| 10| | 2| | 2| 4| | 2| | 2| 39| | WATER TANKER | 4| 2| 6| 3| | 3| 12| 3| 5| 7| 3| 10| | 2| 1| 2| 5| 1| 2| | 2| 47| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 3| 3| | | | | | | | | | 3| | TOTAL | 10| 5| 15| 7| 1| 8| 29| 9| 13| 15| 16| 31| | 6| 1| 7| 14| 1| 6| | 6| 126| | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 60| 73| 67| 96| 71| 78| 59| 76| 73| 67| 70| | 78| 90| 76| 79| | 89| | 89| 74| | c)% Utilisation-SSH | 32| 25| 30| 17| 21| 18| 34| 28| 39| 36| 21| 28| | 22| 12| 23| 21| | 24| | 24| 28| | -MAH | 40| 41| 41| 25| 22| 25| 44| 48| 52| 49| 31| 40| | 29| 13| 30| 27| | 27| | 27| 38| | d)Down time/Hr worked | 0.63| 1.60| 0.90| 1.91| 0.18| 1.61| 0.65| 1.48| 0.60| 0.74| 1.62| 1.07| | 0.99| 0.87| 1.05| 1.00| | 0.47| | 0.47| 0.93| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 70| 26| 96| 22| 1| 23| 173| 47| 142| 126| 63| 189| | 23| 8| 23| 54| 8| 27| | 27| 759| | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 59| 77| 74| 96| 75| 76| 75| 78| 74| 84| 77| | 89| 92| 85| 88| 65| 77| | 77| 78| | c)% Utilisation-SSH | 41| 32| 39| 24| 21| 24| 38| 27| 38| 43| 48| 45| | 29| 13| 28| 26| 27| 27| | 27| 38| | -MAH | 49| 54| 50| 32| 22| 31| 50| 36| 49| 59| 57| 58| | 33| 14| 33| 30| 42| 36| | 36| 49| | d)Down time/Hr worked | 0.38| 1.25| 0.58| 1.08| 0.18| 1.04| 0.62| 0.93| 0.58| 0.61| 0.33| 0.51| | 0.37| 0.60| 0.55| 0.46| 1.27| 0.84| | 0.84| 0.58| +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | 7.83| | -Actual | | | | | | | | | 5.10| 3.83| | 3.83| | | | | | | | | | 8.93| |b)Shovels(LCu.M)-Cap. | 9.91| 2.85| 12.76| 2.00| | 2.00| 28.31| 4.03| 24.16| 24.17| 14.73| 38.90| | 2.00| 1.00| 2.00| 5.00| 1.00| 2.15| | 2.15| 118.30| | -OB | 5.53| 0.42| 5.95| 0.21| | 0.21| 12.53| 0.07| 15.80| 18.55| 15.34| 33.88| | 0.01| | | 0.01| 0.09| | | | 68.54| | -Coal(LT) | 2.17| 2.56| 4.73| 0.56| | 0.56| 5.64| 2.64| 3.23| 3.52| 1.05| 4.57| | 1.91| 0.12| 1.19| 3.22| | 1.54| | 1.54| 26.12| +--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month: Sl.No. Mine Description Make Mfg.Sr.No. 1. GK.OC 60T Dumper BEML 03450 2. GK.OC 60T Dumper BEML 03461 3. GK.OC 60T Dumper BEML 03482 4. PK.OC 150MM Drill Revathi 21017 5. PK.OC 150MM Drill Revathi 21019 6. PK.OC 60T Dumper BEML 03453 7. PK.OC 60T Dumper BEML 03457 List of Surveyed Off HEMM during the month Sl.No. Mine Description Make Mfg.Sr.No. 1. PK.OC 35T Dumper BEML 09756 2. PK.OC 35T Dumper BEML 09757 3. PK.OC 35T Dumper BEML 09758 4. PK.OC 35T Dumper BEML 09759 5. PK.OC 35T Dumper BEML 09760 6. PK.OC 35T Dumper BEML 09766 7. PK.OC 35T Dumper BEML 09768 8. PK.OC 35T Dumper BEML 09817 9. PK.OC 35T Dumper BEML 09822 10. PK.OC 35T Dumper BEML 09479 11. RG.OC3 2.8 Cu.M. Shovel L & T ZZZZZ 12. PK.OC 150mm Drill RECP 00102 List of HEMM transferred during the month Sl.No. To Description From Make Mfg.Sr.No. 1. GK.OC 60T Dumper MED OC BEML 03460 2. GK.OC 60T Dumper MED OC BEML 03484 3. PK.OC 60T Dumper MED OC BEML 03437 4. PK.OC 60T Dumper MED OC BEML 03454 5. PK.OC 60T Dumper MED OC BEML 03456 6. PK.OC 6.5 Cu.M. Shovel MED OC Telco 00061 7. RK.OC Water Tanker BPA OC2 BEML 09999 8. DOR.OC 35T Dumper KRG. OC H.M. 00280 9. DOR.OC 35T Dumper KRG. OC H.M. 00281 10. DOR.OC Support Shovel BPA OC. Tata Hitachi 07730 11. DOR.OC Motor Grader BPA OC. BEML 06518 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-May-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2011 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MMR | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area | RK OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.71| 2.37| 5.08| | 0.69| 2.55| 3.24| 6.42| 2.98| 3.32| 2.90| 0.50| 3.40| 1.08| 1.75| | 1.22| 2.97| | 0.52| 1.38| 1.90| 30.39| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.71| 2.37| 5.08| | 0.69| 2.55| 3.24| 6.42| 2.98| 3.32| 2.90| 0.50| 3.40| 1.08| 1.75| | 1.22| 2.97| | 0.52| 1.38| 1.90| 30.39| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 1.54| 2.69| 4.24| | 0.39| 2.59| 2.99| 2.39| 2.67| 2.91| 2.42| 0.34| 2.76| 0.59| 1.99| 0.10| 0.91| 3.00| | 0.18| 0.44| 0.62| 22.15| | - Contractor | | 0.18| 0.18| | | | | 1.91| | | | 1.00| 1.00| | 0.10| | | 0.10| | | | | 3.18| | - Total | 1.54| 2.87| 4.41| | 0.39| 2.59| 2.99| 4.30| 2.67| 2.91| 2.42| 1.33| 3.75| 0.59| 2.09| 0.10| 0.91| 3.10| | 0.18| 0.44| 0.62| 25.33| | % Achievement | 57| 121| 87| | 57| 102| 92| 67| 90| 88| 83| 266| 110| 54| 120| | 74| 104| | 34| 32| 32| 83| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 1.08| | 1.08| | | | | 1.35| | | 1.81| 0.76| 3.92| | 0.28| | 0.31| 0.59| | 1.75| | 1.75| 7.33| | % Rehandle in Total | 70| | 25| | | | | 57| | | 75| 227| 142| | 14| | 34| 20| | 981| | 284| 33| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 3.56| 2.78| | 2.78| | | | | | | | | | 6.34| | -Shovels | 6.47| | 6.47| | | | | 23.02| 1.36| 18.01| 27.82| 1.50| 29.32| | | | | | 0.87| | | | 79.05| | -Total | 6.47| | 6.47| | | | | 23.02| 1.36| 21.57| 30.60| 1.50| 32.10| | | | | | 0.87| | | | 85.39| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 10.00| 22.50| 4.00| | 13.00| 17.00| 34.00| 23.00| 11.00| | 17.00| 17.00| 11.00| 14.25| 2.50| 15.86| 32.61| | 6.36| 14.63| 20.99| 189.10| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.97| 10.00| 28.97| 4.00| | 13.00| 17.00| 57.02| 24.36| 32.57| 30.60| 18.50| 49.10| 11.00| 14.25| 2.50| 15.86| 32.61| 0.87| 6.36| 14.63| 20.99| 274.49| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 1.66| 1.46| | 1.46| | | | | | | | | | 3.12| | -Shovels | 4.19| 0.21| 4.40| | 0.36| | 0.36| 12.86| 0.26| 14.78| 30.79| | 30.79| | | 0.04| | 0.04| 0.17| | | | 63.67| | -Total | 4.19| 0.21| 4.40| | 0.36| | 0.36| 12.86| 0.26| 16.44| 32.26| | 32.26| | | 0.04| | 0.04| 0.17| | | | 66.79| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 11.04| 8.67| 19.72| | | 8.45| 8.45| 30.97| 11.50| 8.02| | 13.26| 13.26| 6.11| 17.34| | 0.25| 17.59| | 4.73| 7.71| 12.43| 128.04| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 15.23| 8.88| 24.12| | 0.36| 8.45| 8.80| 43.83| 11.76| 24.46| 32.26| 13.26| 45.52| 6.11| 17.34| 0.04| 0.25| 17.63| 0.17| 4.73| 7.71| 12.43| 194.83| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 47| 53| | 53| | | | | | | | | | 49| | -Shovels | 65| | 68| | | | | 56| 19| 82| 111| | 105| | | | | | 19| | | | 81| | -Total | 65| | 68| | | | | 56| 19| 76| 105| | 100| | | | | | 19| | | | 78| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 88| 87| 88| | | 65| 50| 91| 50| 73| | 78| 78| 56| 122| | 2| 54| | 74| 53| 59| 68| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 80| 89| 83| | | 65| 52| 77| 48| 75| 105| 72| 93| 56| 122| 2| 2| 54| 19| 74| 53| 59| 71| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.00| 1.43| | 1.43| | | | | | | | | | 2.43| | - Shovels | | | | | | | | | | | | 13.97| 13.97| | | | | | | | | | 13.97| | - Total | | | | | | | | | | 1.00| 1.43| 13.97| 15.40| | | | | | | | | | 16.40| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 6| 4| | 48| | | | | | | | | | 25| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 63| 127| 73| | 136| 102| 109| 53| 61| 77| 104| 12| 99| 54| 114| | 74| 103| 19| 34| 32| 32| 77| | % Utiln. of Excav.Cap. | 70| 84| 73| | 31| | 31| 52| 32| 66| 85| 95| 88| | 76| 8| 40| 48| | 60| | 60| 68| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-May-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2011 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MMR | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area | RK OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 87| | | 75| 89| | 90| 90| 88| 90| 90| | 90| 90| 78| 90| | | 90| 90| | | | - In O B | 90| 90| | | 75| 89| | 88| 42| 89| 90| 90| | 90| | 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | 3| | | | 1| | 2| | 2| | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10423| 9115| 19538| | 2740| 8500| 11240| 21400| 11920| 13280| 11600| 2000| 13600| 4154| 6731| | 4692| 11423| | 2000| 5308| 7308| 113863| | Actual | 5138| 9292| 14431| | 1568| 8745| 10313| 7967| 8892| 9920| 8062| 1122| 9184| 1962| 6643| 400| 3021| 10064| | 594| 1460| 2054| 74786| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 24885| | 24885| | | | | 76733| 5440| 86280|122400| 6000|128400| | | | | | | | | | 321738| | Actual | 13967| 701| 14668| | 1434| | 1434| 43854| 1866| 55416|107517| |107517| | | 163| | 163| | | | | 224918| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 8.67| 41.01| 17.39| | 5.83| 80.22| 29.99| 8.48| 15.47| 7.40| 9.37| 3.05| 7.48| 22.55| 26.18| 3.44| 14.49| 17.78| | 8.10| 9.96| 9.34| 12.23| | Simple Formula | 7.69| 41.01| 15.91| | 5.83| 80.22| 29.99| 5.61| 22.06| 7.82| 4.40| 6.61| 4.58| 22.55| 26.18| 3.44| 14.49| 17.78| | 8.10| 9.96| 9.34| 10.32| | Excavation(Cu.M)| 26.01| 30.54| 27.13| | 9.22| 53.48| 23.59| 33.94| 16.87| 49.40| 61.57| 4.41| 56.73| 15.03| 17.45| 3.70| 9.66| 12.10| | 5.40| 6.64| 6.23| 37.63| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 903| 279| 1182| | 327| 148| 475| 1882| 528| 1587| 2428| 223| 2651| | 345| 148| 267| 760| | 96| 197| 293| 9358| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 3.29| 6.12| 9.41| | | | | 5.77| 5.77| 11.68| 7.22| 1.58| 8.80| 0.05| 5.55| 0.23| 4.04| 9.82| | 0.03| 0.08| 0.10| 51.40| | - Cost/Cu.M (Rs.) | 0.63| 3.05| 1.30| | | | | 0.40| 2.83| 0.64| 0.21| 7.05| 0.26| 0.12| 4.18| 2.02| 6.69| 4.80| | 0.24| 0.26| 0.25| 0.63| | - Cost/MOR/MTH (Rs.)| 364.4|2192.6| 796.0| | | | | 306.6|1093.7| 735.8| 297.4| 708.9| 332.0| |1609.1| 152.7|1513.4|1291.9| | 29.5| 38.3| 35.4| 549.2| | PLD Allowance-Rs.Lakhs | 18.71| 5.93| 24.63| | 2.53| 3.79| 6.32| 43.20| 16.08| 55.59| 75.33| 6.65| 81.98| 1.61| 6.54| 1.06| 4.43| 12.02| | 1.66| 3.33| 4.99| 246.42| | - Cost/Cu.M (Rs.) | 3.59| 2.95| 3.41| | 4.08| 2.19| 2.69| 2.99| 7.89| 3.02| 2.22| 29.63| 2.40| 4.10| 4.92| 9.45| 7.33| 5.88| | 14.00| 11.39| 12.14| 3.02| | - Cost/MOR/MTH (Rs.)|2071.8|2124.1|2084.2| | 773.4|2558.3|1329.5|2295.3|3046.1|3503.1|3102.5|2980.9|3092.2| |1895.4| 713.0|1659.3|1582.2| |1732.0|1688.0|1702.4| 2633.3| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.58| 0.28| 0.49| | 0.52| | 0.14| 1.01| 0.76| 0.66| 0.30| 34.10| 0.53| | 0.56| 0.37| 0.88| 0.65| | 5.50| | 1.59| 0.64| | b)Other Equipments | 0.45| 0.44| 0.44| | 0.75| 0.01| 0.20| 0.39| 0.78| 0.30| 0.15| 23.28| 0.31| | 0.54| 1.83| 1.02| 0.75| | 6.11| | 1.77| 0.36| | c)Total | 1.02| 0.72| 0.94| | 1.27| 0.01| 0.34| 1.40| 1.54| 0.96| 0.44| 57.37| 0.84| | 1.10| 2.20| 1.90| 1.40| | 11.60| | 3.36| 1.00| | d)Dumpers(Ltr/CuM/KM) | 0.36| 0.29| | | 0.56| | | 0.29| 0.41| 0.26| 0.14| 16.13| | | 0.27| 0.25| 0.43| | | 2.57| | | | | e)Lubricants -Ltrs | 17030| 11042| 28072| | 3752| | 3752| 49574| 10150| 54690| 31644| 32580| 64224| | 2863| 1195| 3489| 7547| | 7526| | 7526| 336656| | -Ltrs/CuM| 0.03| 0.06| 0.04| | 0.06| | 0.02| 0.03| 0.05| 0.03| 0.01| 1.45| 0.02| | 0.02| 0.11| 0.06| 0.04| | 0.63| | 0.18| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 1.93| 8.18| 3.75| | 12.55| | 12.55| 1.33| 4.23| 5.93| 7.73| 5.06| 7.26| | 2.80| 0.53| 2.87| 2.46| | 1.64| 2.02| 1.90| 2.82| | Shovel-O B(CuM/Kg)| 2.32| 1.89| 2.30| | | | | 1.98| | 2.37| 3.01| | 3.01| | | | | | | | | | 2.56| | Dragline -O B(CuM/Kg)| | | | | | | | | | 0.93| 1.86| | 1.86| | | | | | | | | | 1.21| | b)% Cap Sensitive | 25.76| 28.24| 26.65| | 20.00| | 20.00| 1.92| 12.64| 0.19| 2.44| 0.00| 1.71| | 2.45| 20.87| 17.99| 3.78| | 95.31| 95.31| 95.31| 13.63| | c)Total Explosives(T) | 783| 438| 1221| | 3| | 3| 1989| 499| 851| 1132| 486| 1618| | 632| 20| 35| 687| | 185| 370| 555| 7424| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-May-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2011 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MMR | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area | RK OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 63| 84| | 84| | | | | | | | | | 73| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 84| 80| | 80| | | | | | | | | | 82| | d)% Utilisation-SSH | | | | | | | | | | 57| 58| | 58| | | | | | | | | | 58| | -MAH | | | | | | | | | | 68| 73| | 73| | | | | | | | | | 71| | e)Down time/Hr worked | | | | | | | | | | 0.28| 0.35| | 0.35| | | | | | | | | | 0.31| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 1| 1| 2| 2| | 2| | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| | 3| 3| | | | | | | | | | 5| | 3.0 Cu.M | 5| 2| 7| | 2| | 2| 7| 4| 2| 3| | 3| | 2| 1| 2| 5| 1| 2| | 2| 33| | TOTAL | 7| 2| 9| | 2| | 2| 15| 5| 12| 11| 6| 17| | 2| 1| 2| 5| 1| 2| | 2| 68| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 70| 84| 73| | 31| | 31| 52| 32| 67| 85| 95| 89| | 76| 8| 40| 48| | 60| | 60| 68| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 87| 84| 86| | 88| | 88| 80| 78| 78| 80| 93| 85| | 91| 91| 94| 92| | 94| | 94| 83| | d)% Utilisation-SSH | 64| 65| 64| | 47| | 47| 52| 46| 53| 59| 75| 65| | 64| 34| 50| 53| | 64| | 64| 57| | -MAH | 74| 77| 74| | 54| | 54| 64| 60| 68| 73| 80| 76| | 70| 37| 53| 57| | 67| | 67| 68| | e)Down time/Hr worked | 0.20| 0.25| 0.21| | 0.25| | 0.25| 0.38| 0.48| 0.43| 0.33| 0.09| 0.23| | 0.14| 0.25| 0.12| 0.14| | 0.09| | 0.09| 0.29| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| 11| | 11| | | | | | | | | | 56| | 60 T | | | | | | | | | 5| 5| | | | | | | | | | | | | 10| | 35 T | 30| 14| 44| | 9| | 9| 60| 27| 34| 33| | 33| | 13| 4| 9| 26| 5| 15| | 15| 253| | TOTAL | 38| 14| 52| | 9| | 9| 103| 32| 94| 79| 26| 105| | 13| 4| 9| 26| 5| 15| | 15| 441| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 86| 65| 80| | 75| | 75| 76| 82| 81| 70| 94| 76| | 90| 79| 87| 88| | 60| | 60| 78| | c)% Utilisation-SSH | 46| 32| 43| | 34| | 34| 41| 29| 38| 40| 69| 48| | 37| 10| 39| 35| | 35| | 35| 41| | -MAH | 54| 50| 53| | 45| | 45| 54| 35| 48| 58| 73| 63| | 41| 13| 44| 40| | 58| | 58| 52| | f)Down time/Hr worked | 0.30| 1.09| 0.46| | 0.73| | 0.73| 0.58| 0.63| 0.50| 0.74| 0.09| 0.49| | 0.26| 2.10| 0.35| 0.36| | 1.17| | 1.17| 0.53| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 3| 1| 4| | 2| | 2| 12| 4| 3| 1| 1| 2| | 3| 1| 2| 6| 1| 3| | 3| 37| | D355 A-3 | 3| 2| 5| | | | | 6| | 10| 11| 8| 19| | | | | | | | | | 40| | TOTAL | 6| 3| 9| | 2| | 2| 18| 4| 13| 12| 9| 21| | 3| 1| 2| 6| 1| 3| | 3| 77| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 68| 63| 66| | 87| | 87| 56| 69| 57| 71| 65| 68| | 93| 96| 88| 92| | 82| | 82| 66| | c)% Utilisation-SSH | 32| 22| 29| | 21| | 21| 31| 21| 31| 36| 32| 35| | 21| 30| 27| 25| | 26| | 26| 30| | -MAH | 48| 35| 44| | 24| | 24| 54| 30| 55| 51| 50| 51| | 22| 31| 31| 27| | 32| | 32| 46| | f)Down time/Hr worked | 1.00| 1.66| 1.17| | 0.63| | 0.63| 1.43| 1.46| 1.40| 0.81| 1.10| 0.92| | 0.34| 0.13| 0.44| 0.34| | 0.70| | 0.70| 1.13| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-May-2011 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2011 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MMR | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC |JOC-I | Area |JK5 OC|BLK-E |KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area |KTK OC|KRG OC|OC-2Ex|Dorli1| Area | RK OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 5| 5| | 5| | | | | | | | | | 17| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | 2| | 152 mm | | | | | | | | | 1| | | 2| 2| | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 2| | 2| 5| 1| 5| 3| 3| 6| | 1| 1| 1| 3| | 1| | 1| 28| | TOTAL | 4| 2| 6| | 2| | 2| 11| 3| 10| 8| 6| 14| | 1| 1| 1| 3| | 1| | 1| 50| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 0.00| 22.46| 3.82| | 0.00| | 0.00| 32.73| 25.44| 22.69| 30.46| 36.66| 32.95| | 24.01| 56.71| 0.00| 19.23| | 28.04| | 28.04| 25.26| | c)% Availability | 86| 47| 74| | 86| | 86| 80| 63| 75| 67| 77| 71| | 93| 93| 97| 94| | 92| | 92| 76| | d)% Utilisation-SSH | 37| 16| 30| | 4| | 4| 28| 13| 36| 29| 26| 28| | 33| 5| 19| 20| | 26| | 26| 27| | -MAH | 42| 34| 41| | 5| | 5| 35| 21| 47| 43| 34| 39| | 36| 5| 20| 21| | 28| | 28| 36| | e)Down time/Hr worked | 0.38| 3.25| 0.87| | 3.15| | 3.15| 0.73| 2.88| 0.69| 1.15| 0.89| 1.04| | 0.23| 1.45| 0.15| 0.30| | 0.31| | 0.31| 0.88| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| | 2| 1| 1| 4| | 1| | 1| 18| | LOADER | 1| 1| 2| | 1| | 1| 5| 2| 1| | 3| 3| | | | 1| 1| | 1| | 1| 16| | GRADER | 3| 1| 4| | 2| | 2| 8| 3| 6| 6| 4| 10| | 2| 1| 1| 4| | 2| | 2| 39| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 5| 8| 2| 10| | 2| 2| 2| 6| | 2| | 2| 47| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 7| 1| 8| 29| 9| 13| 16| 15| 31| | 6| 4| 5| 15| | 6| | 6| 126| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 70| 79| | 73| 57| 71| 77| 72| 73| 67| 64| 65| | 78| 83| 88| 82| | 94| | 94| 75| | c)% Utilisation-SSH | 34| 34| 34| | 20| 13| 19| 34| 36| 40| 37| 23| 30| | 28| 15| 28| 25| | 21| | 21| 30| | -MAH | 40| 48| 43| | 27| 23| 26| 45| 50| 56| 56| 36| 46| | 36| 18| 31| 30| | 22| | 22| 40| | d)Down time/Hr worked | 0.48| 0.89| 0.62| | 1.37| 3.40| 1.57| 0.67| 0.77| 0.68| 0.88| 1.62| 1.17| | 0.80| 1.09| 0.42| 0.72| | 0.28| | 0.28| 0.84| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 65| 26| 91| | 22| 1| 23| 176| 53| 143| 127| 62| 189| | 25| 11| 19| 55| 7| 27| | 27| 764| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 66| 79| | 78| 57| 77| 75| 78| 77| 71| 82| 74| | 88| 85| 88| 87| | 74| | 74| 77| | c)% Utilisation-SSH | 44| 33| 41| | 27| 13| 26| 39| 30| 39| 41| 50| 44| | 35| 16| 35| 32| | 33| | 33| 39| | -MAH | 53| 50| 52| | 35| 23| 34| 52| 39| 51| 58| 62| 59| | 40| 19| 40| 37| | 45| | 45| 51| | d)Down time/Hr worked | 0.36| 1.02| 0.51| | 0.83| 3.40| 0.89| 0.64| 0.73| 0.58| 0.72| 0.37| 0.58| | 0.35| 0.94| 0.33| 0.39| | 0.80| | 0.80| 0.59| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 4.20| 3.45| | 3.45| | | | | | | | | | 7.65| | -Actual | | | | | | | | | | 2.66| 2.89| | 2.89| | | | | | | | | | 5.55| |b)Shovels(LCu.M)-Cap. | 8.54| 2.36| 10.90| | 2.00| | 2.00| 27.67| 6.34| 25.00| 23.81| 15.50| 39.30| | 2.00| 1.00| 2.00| 5.00| | 2.12| | 2.12| 118.34| | -OB | 4.19| 0.21| 4.40| | 0.36| | 0.36| 11.86| 0.26| 14.77| 17.34| 13.97| 31.31| | | 0.04| | 0.04| | | | | 63.01| | -Coal(LT) | 2.62| 2.67| 5.29| | 0.39| | 0.39| 3.74| 2.66| 2.87| 4.22| 1.10| 5.32| | 2.27| 0.06| 1.21| 3.54| | 1.93| | 1.93| 25.74| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ List of HEMM commissioned during the month: Sl.No. Mine Description Make Mfg.Sr.No. 1. GK.OC 6.5 Cu.M. Shovel TATA HITACHI 00064 2. RG.OC3 Grader Volvo 08019 3. RG.OC3 Grader Volvo 08023 4. RG.OC3 60T Dumper BEML 03488 5. RG.OC2 Grader Volvo 50824 6. RG.OC2 Pipe Layer BEML 15049 7. RG.OC1 Grader Volvo 50826 8. RG.OC1 Grader Volvo 50827 List of Surveyed Off HEMM during the month Sl.No. Mine Description Make Mfg.Sr.No. 1. RG.OC3 Dozer BEML 00321 2. RG.OC3 Dozer BEML 00323 3. RG.OC2 85T Dumper BEML 01559 4. RG.OC2 Water Tanker Hindustan 05923 5. RG.OC2 Water Tanker Hindustan 55920 6. KRG.OC 35T Dumper Hindustan 05220 7. KRG.OC 35T Dumper Hindustan 05221 8. PK.OC 85T Dumpers BEML 01020 9. PK.OC 85T Dumpers BEML 01210 10. PK.OC 85T Dumpers BEML 01282 11. PK.OC 85T Dumpers BEML 01306 13. PK.OC 85T Dumpers BEML 01381 14. PK.OC 85T Dumpers BEML 01383 15. PK.OC 85T Dumpers BEML 01384 16. PK.OC 85T Dumpers BEML 01386 17. PK.OC 85T Dumpers BEML 01387 List of HEMM transferred during the month Sl.No. To Description From Make Mfg.Sr.No. 1. RG.OC3 60T Dumper RG.OC1 BEML 03483 2. RG.OC3 60T Dumer RG.OC1 BEML 03485 3. RG.OC3 60T Dumper RG.OC1 BEML 03486 4. RG.OC3 60T Dumper RG.OC1 BEML 03487 5. RG.OC3 60T Dumper RG.OC1 BEML 03488 6. RG.OC3 6.5 Cu.M.Shovel RG.OC1 Tata Hitachi 00066 7. RG.OC1 12.0 Cu.M.Shovel RG.OC2 Komatsu 20210 8. RG.OC1 Water Tanker RG.OC2 Hindustan Motors 00251