THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Apr-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Mar 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JVROCI| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.65| 2.85| 5.50| 1.40| 1.82| 3.22| 7.16| 3.69| 3.45| 3.16| 2.00| 5.16| 1.09| 2.68| 0.50| 0.80| 0.80| 4.78| | 0.54| 1.65| 2.19| 36.24| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.65| 2.85| 5.50| 1.40| 1.82| 3.22| 7.16| 3.69| 3.45| 3.16| 2.00| 5.16| 1.09| 2.68| 0.50| 0.80| 0.80| 4.78| | 0.54| 1.65| 2.19| 36.24| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 4.69| 3.52| 8.22| 2.16| 2.71| 4.87| 7.83| 4.54| 5.30| 5.46| 2.28| 7.74| 1.35| 2.89| | 2.14| 1.67| 6.71| | | 1.47| 1.47| 48.02| | - Contractor | | 0.69| 0.69| | | | | | | | | | | | | | | | | | | | 0.69| | - Total | 4.69| 4.21| 8.90| 2.16| 2.71| 4.87| 7.83| 4.54| 5.30| 5.46| 2.28| 7.74| 1.35| 2.89| | 2.14| 1.67| 6.71| | | 1.47| 1.47| 48.71| | % Achievement | 177| 148| 162| 155| 149| 151| 109| 123| 154| 173| 114| 150| 124| 108| | 268| 209| 140| | | 89| 67| 134| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | | | | | | | | | | | 0.59| 0.59| | 0.00| | 0.00| | 0.00| | 1.75| | 1.75| 2.34| | % Rehandle in Total | | | | | | | | | | | 26| 8| | 0| | 0| | 0| | | | 119| 5| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 3.73| 2.93| | 2.93| | | | | | | | | | | 6.66| | -Shovels | 5.80| | 5.80| | | | 22.23| 1.00| 17.37| 30.00| | 30.00| | | | | | | | | | | 76.40| | -Total | 5.80| | 5.80| | | | 22.23| 1.00| 21.10| 32.93| | 32.93| | | | | | | | | | | 83.06| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.00| 13.50| 25.50| 5.00| 6.94| 11.94| 33.00| 22.40| | | 15.00| 15.00| 12.00| 17.00| | 14.00| 10.00| 41.00| | | 10.00| 10.00| 170.84| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 17.80| 13.50| 31.30| 5.00| 6.94| 11.94| 55.23| 23.40| 21.10| 32.93| 15.00| 47.93| 12.00| 17.00| | 14.00| 10.00| 41.00| | | 10.00| 10.00| 253.90| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 3.20| 1.37| | 1.37| | | | | | | | | | | 4.56| | -Shovels | 3.22| 0.98| 4.20| | | | 14.92| | 10.65| 21.56| 0.60| 22.16| | | | | | | | | 1.34| 1.34| 53.27| | -Total | 3.22| 0.98| 4.20| | | | 14.92| | 13.85| 22.93| 0.60| 23.53| | | | | | | | | 1.34| 1.34| 57.83| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 10.49| 9.66| 20.15| | 4.23| 4.23| | 20.95| 3.64| | | | 4.32| 8.71| | 12.36| 13.02| 34.09| | | | | 87.38| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 13.71| 10.64| 24.35| | 4.23| 4.23| 14.92| 20.95| 17.49| 22.93| 0.60| 23.53| 4.32| 8.71| | 12.36| 13.02| 34.09| | | 1.34| 1.34| 145.21| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 86| 47| | 47| | | | | | | | | | | 68| | -Shovels | 56| | 72| | | | 67| | 61| 72| | 74| | | | | | | | | | | 70| | -Total | 56| | 72| | | | 67| | 66| 70| | 71| | | | | | | | | | | 70| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 87| 72| 79| | 61| 35| | 94| | | | | 36| 51| | 88| 130| 83| | | | | 51| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 77| 79| 78| | 61| 35| 27| 90| 83| 70| 4| 49| 36| 51| | 88| 130| 83| | | 13| 13| 57| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 1.00| 1.48| | 1.48| | | | | | | | | | | 2.48| | - Shovels | | | | | | | | | | | 5.44| 5.44| 0.10| | | | | 0.10| | 1.34| | 1.34| 6.88| | - Total | | | | | | | | | 1.00| 1.48| 5.44| 6.91| 0.10| | | | | 0.10| | 1.34| | 1.34| 9.36| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 7| 6| 908| 29| | | | | | | | | | 100| 16| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 84| 175| 102| 155| 149| 151| 75| 87| 74| 76| 159| 79| 124| 108| | 268| 209| 140| | | 211| 159| 84| | % Utiln. of Excav.Cap. | 71| 86| 76| 88| | 88| 70| 93| 67| 84| 62| 77| 15| 96| | 71| 67| 81| | 50| | 50| 72| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Apr-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Mar 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JVROCI| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | 93| 81| | 90| 93| 93| 93| 93| | 90| 93| 75| 93| 93| | | | 93| | | | - In O B | 93| 93| | | 93| | 90| | 93| 93| 93| | 84| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | | | | | | | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 12| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10600| 11400| 22000| 5600| 5871| 11471| 23867| 14760| 13800| 12640| 8000| 20640| 4360| 10720| 2000| 3200| 3200| 19120| | 2160| 6600| 8760| 138778| | Actual | 15139| 11364| 26503| 6983| 10037| 17021| 26091| 14642| 17094| 17612| 7363| 24975| 4501| 9334| | 6903| 5396| 21633| | | 4730| 4730| 157190| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 23200| | 23200| | | | 74100| 4000| 84400|131720| |131720| | | | | | | | | | | 317420| | Actual | 10393| 3152| 13544| | | | 49733| | 44661| 73961| 1932| 75893| | | | | | | | | | | 183832| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 10.51| 36.20| 15.11| 30.08| 84.61| 46.87| 12.20| 25.39| 6.69| 7.48| 26.75| 9.50| 29.24| 34.93| | 35.57| 34.19| 34.82| | | 14.61| 14.61| 14.06| | Simple Formula | 21.86| 36.20| 26.33| 30.08| 84.61| 46.87| 17.21| 33.85| 13.52| 10.04| 26.74| 12.30| 29.24| 34.93| | 35.57| 34.19| 34.82| | | 14.61| 14.61| 20.30| | Excavation(Cu.M)| 29.58| 34.17| 31.01| 20.05| 56.41| 31.25| 44.27| 22.57| 44.35| 48.85| 24.84| 45.59| 19.49| 23.29| | 23.71| 22.80| 23.21| | | 23.10| 23.10| 37.98| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 896| 406| 1302| 304| 133| 437| 1880| 545| 1550| 2290| 365| 2655| 184| 347| 7| 252| 204| 810| 71| | 367| 367| 9801| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 9.60| 7.13| 16.73| 0.20| 1.08| 1.28| 21.47| 6.38| 9.84| 4.61| 0.34| 4.95| 3.89| 12.29| 0.05| 7.65| 2.44| 22.44| 1.36| | 6.89| 6.89| 95.22| | - Cost/Cu.M (Rs.) | 1.51| 2.14| 1.73| 0.14| 0.60| 0.39| 1.07| 2.11| 0.57| 0.17| 0.16| 0.17| 4.32| 6.37| | 5.37| 2.18| 5.02| | | 2.97| 2.97| 1.06| | - Cost/MOR/MTH (Rs.)|1071.5|1756.3|1285.1| 66.0| 813.8| 293.6|1141.8|1169.9| 634.9| 201.2| 93.5| 186.4|2114.5|3543.2| 713.6|3037.5|1194.1|2769.8|1914.2| |1877.1|1877.1| 971.5| | PLD Allowance-Rs.Lakhs | 40.07| 17.28| 57.35| 10.20| 5.54| 15.74| 89.20| 24.93| 88.76|106.94| 15.93|122.87| 6.23| 13.83| 0.04| 9.51| 6.91| 30.29| 1.64| | 15.02| 15.02| 452.03| | - Cost/Cu.M (Rs.) | 6.31| 5.20| 5.93| 7.07| 3.07| 4.84| 4.43| 8.24| 5.11| 4.03| 7.51| 4.28| 6.92| 7.17| | 6.66| 6.20| 6.77| | | 6.48| 6.48| 5.03| | - Cost/MOR/MTH (Rs.)|4471.6|4257.4|4404.8|3354.9|4163.9|3601.1|4744.6|4573.6|5726.6|4669.8|4365.4|4628.0|3385.6|3985.6| 535.1|3772.5|3389.0|3739.2|2312.9| |4093.5|4093.5| 4612.1| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.58| 0.40| 0.52| 0.27| | 0.12| 0.62| 0.56| 0.84| 0.59| 0.68| 0.66| 0.29| 0.47| | 0.48| 0.28| 0.43| | | | 0.47| 0.62| | b)Other Equipments | 0.37| 0.37| 0.37| 0.39| 0.02| 0.18| 0.27| 0.38| 0.32| 0.27| 0.54| 0.36| 0.26| 0.40| | 0.49| 0.39| 0.43| | | | 0.58| 0.34| | c)Total | 0.94| 0.77| 0.89| 0.66| 0.02| 0.30| 0.90| 0.95| 1.16| 0.86| 1.22| 1.02| 0.55| 0.87| | 0.97| 0.67| 0.85| | | | 1.05| 0.96| | d)Dumpers(Ltr/CuM/KM) | 0.33| 0.20| | 0.55| | | 0.23| 0.24| 0.26| 0.02| 0.03| | 0.16| 0.18| | 0.29| 0.24| | | | | | | | e)Lubricants -Ltrs | 17443| 8400| 25843| 5824| | 5824| 59450| 11910| 48060| 47114| 24258| 71372| | 5004| | 8556| 2422| 15982| | | 12763| 12763| 382988| | -Ltrs/CuM| 0.03| 0.03| 0.03| 0.04| | 0.02| 0.03| 0.04| 0.03| 0.02| 0.11| 0.03| | 0.03| | 0.06| 0.02| 0.04| | | 0.06| 0.06| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.96| 4.64| 4.23| 10.09| | 10.09| 3.21| 7.14| 5.34| 5.41| 4.51| 5.11| | 3.44| | 3.93| 4.71| 3.85| | | 5.58| 3.83| 4.32| | Shovel-O B(CuM/Kg)| 2.22| 4.63| 2.53| | | | 2.90| | 1.77| 2.46| 0.99| 2.36| | | | | | | | | 1.71| 1.71| 2.32| | Dragline -O B(CuM/Kg)| | | | | | | | | 2.97| 1.58| | 1.58| | | | | | | | | | | 2.35| | b)% Cap Sensitive | 37.09| 6.62| 27.99| 19.93| | 19.93| 5.83| 10.39| 1.91| 3.56| 0.00| 3.23| | 5.03| | 46.95| 19.02| 22.51| | 20.06| 77.59| 71.64| 13.32| | c)Total Explosives(T) | 707| 301| 1008| 21| | 21| 759| 823| 807| 1066| 111| 1177| | 348| | 276| 187| 810| | 12| 105| 117| 5523| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Apr-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Mar 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JVROCI| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 96| 82| | 82| | | | | | | | | | | 90| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 88| 68| | 68| | | | | | | | | | | 78| | d)% Utilisation-SSH | | | | | | | | | 77| 57| | 57| | | | | | | | | | | 67| | -MAH | | | | | | | | | 87| 84| | 84| | | | | | | | | | | 86| | e)Down time/Hr worked | | | | | | | | | 0.16| 0.56| | 0.56| | | | | | | | | | | 0.33| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 1| | 1| 6| 3| | 3| | 3| 2| 2| | 2| 1| 5| | 5| | 5| 32| | TOTAL | 6| 3| 9| 1| | 1| 15| 3| 10| 12| 5| 17| 2| 2| | 2| 1| 5| | 5| | 5| 67| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 71| 86| 76| 88| | 88| 70| 93| 62| 84| 62| 76| 15| 96| | 71| 67| 81| | 50| | 50| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 88| 87| 88| 95| | 95| 78| 89| 69| 84| 87| 85| 53| 91| | 80| 97| 88| | 94| | 94| 82| | d)% Utilisation-SSH | 66| 71| 68| 79| | 79| 53| 63| 50| 61| 67| 63| 38| 69| | 52| 77| 64| | 55| | 55| 59| | -MAH | 75| 81| 77| 83| | 83| 69| 71| 72| 73| 77| 75| 71| 76| | 65| 79| 72| | 59| | 59| 72| | e)Down time/Hr worked | 0.18| 0.18| 0.18| 0.07| | 0.07| 0.42| 0.18| 0.61| 0.26| 0.20| 0.24| 1.23| 0.13| | 0.38| 0.03| 0.19| | 0.11| | 0.11| 0.31| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 53| | 45| 49| 26| 75| | | | | | | | | | | 173| | 85 T | 8| | 8| | | | 12| | 23| | | | | | | | | | | | | | 43| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 23| 20| 43| 4| | 4| 43| 21| 27| 15| | 15| 11| 11| | 10| 10| 31| | 27| | 27| 222| | TOTAL | 36| 20| 56| 4| | 4| 113| 21| 100| 64| 26| 90| 11| 11| | 10| 10| 31| | 27| | 27| 453| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 58| 72| 67| | 67| 77| 75| 78| 68| 84| 72| 57| 86| | 69| 55| 71| | 55| | 55| 74| | c)% Utilisation-SSH | 49| 45| 47| 55| | 55| 38| 44| 40| 53| 58| 54| 29| 49| | 43| 30| 42| | 37| | 37| 44| | -MAH | 61| 77| 65| 81| | 81| 49| 59| 50| 79| 69| 75| 50| 57| | 63| 54| 58| | 68| | 68| 59| | f)Down time/Hr worked | 0.41| 0.94| 0.59| 0.60| | 0.60| 0.60| 0.58| 0.54| 0.60| 0.28| 0.51| 1.48| 0.29| | 0.71| 1.52| 0.69| | 1.19| | 1.19| 0.60| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 1| | 1| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| | 3| | 3| 33| | D355 A-3 | 2| 2| 4| | | | 4| | 10| 8| 6| 14| | | | | | | | | | | 32| | TOTAL | 4| 3| 7| 1| | 1| 14| 4| 13| 9| 8| 17| | 3| | 2| 1| 6| | 3| | 3| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 63| 69| 65| 36| | 36| 57| 62| 53| 68| 68| 68| | 95| | 43| 86| 76| | 53| | 53| 62| | c)% Utilisation-SSH | 29| 36| 32| 28| | 28| 39| 20| 38| 51| 40| 46| | 21| | 19| 32| 22| | 37| | 37| 37| | -MAH | 47| 52| 49| 78| | 78| 68| 32| 72| 75| 60| 68| | 22| | 44| 37| 29| | 71| | 71| 60| | f)Down time/Hr worked | 1.27| 0.87| 1.09| 2.29| | 2.29| 1.11| 1.92| 1.23| 0.62| 0.79| 0.69| | 0.23| | 3.06| 0.43| 1.09| | 1.26| | 1.26| 1.03| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 24-Apr-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Mar 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC |JVROCI| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 9| 7| 1| 8| | | | | | | | | | | 24| | 160 mm | | | | | | | | 1| | 1| | 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 1| 1| | | | | | | | | | | 2| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 4| 4| 8| 1| 2| | 1| 1| 4| | 2| | 2| 32| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 14| 12| 6| 18| 1| 2| | 1| 1| 4| | 2| | 2| 60| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 24.13| 29.45| 25.49| 0.00| | 0.00| 28.85| 31.26| 25.83| 23.48| 28.18| 25.12| 2.82| 6.03| | 26.54|412.41| 40.27| | 19.30| | 19.30| 26.61| | c)% Availability | 89| 57| 74| 77| | 77| 68| 93| 94| 88| 84| 86| 81| 96| | 53| 84| 82| | 69| | 69| 82| | d)% Utilisation-SSH | 45| 19| 33| 21| | 21| 30| 19| 27| 31| 28| 30| 12| 36| | 23| 9| 27| | 32| | 32| 29| | -MAH | 50| 33| 44| 27| | 27| 45| 21| 28| 35| 34| 34| 15| 38| | 43| 10| 32| | 47| | 47| 35| | e)Down time/Hr worked | 0.24| 2.34| 0.78| 1.12| | 1.12| 1.06| 0.38| 0.22| 0.41| 0.57| 0.46| 1.63| 0.11| | 2.05| 1.82| 0.67| | 0.97| | 0.97| 0.62| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 17| | LOADER | 1| 1| 2| | | | 6| 2| 3| | 3| 3| | 1| | 1| 1| 3| | 2| | 2| 21| | GRADER | 3| 2| 5| 1| | 1| 8| 3| 5| 5| 4| 9| 1| 2| | 1| 1| 4| 1| 2| | 2| 39| | WATER TANKER | 4| 2| 6| 1| | 1| 12| 3| 8| 7| 5| 12| 1| 2| | 2| 1| 5| 1| 2| | 2| 51| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 6| 16| 2| 1| 3| 30| 9| 17| 14| 18| 32| 3| 6| | 5| 4| 15| 3| 7| | 7| 135| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 68| 82| 73| 82| 83| 83| 71| 68| 66| 69| 65| 67| 41| 97| | 54| 68| 75| 100| 78| | 78| 71| | c)% Utilisation-SSH | 28| 38| 32| 53| 33| 48| 37| 27| 38| 49| 22| 34| 19| 28| | 20| 35| 27| 0| 34| | 34| 33| | -MAH | 40| 46| 43| 64| 40| 58| 52| 39| 57| 72| 33| 51| 48| 29| | 38| 52| 36| 0| 44| | 44| 46| | d)Down time/Hr worked | 1.15| 0.47| 0.84| 0.33| 0.50| 0.36| 0.80| 1.19| 0.91| 0.64| 1.62| 0.98| 3.06| 0.12| | 2.26| 0.92| 0.93| | 0.66| | 0.66| 0.89| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 59| 35| 94| 9| 1| 10| 184| 39| 155| 112| 63| 175| 17| 24| | 20| 17| 61| 3| 44| | 44| 782| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 78| 66| 74| 72| 83| 73| 74| 74| 76| 71| 77| 73| 55| 91| | 63| 65| 75| 100| 64| | 64| 73| | c)% Utilisation-SSH | 46| 43| 45| 53| 33| 51| 39| 38| 39| 51| 44| 49| 27| 41| | 35| 33| 37| 0| 39| | 39| 43| | -MAH | 58| 66| 61| 73| 40| 70| 52| 51| 51| 72| 57| 66| 49| 45| | 56| 51| 49| 0| 60| | 60| 58| | d)Down time/Hr worked | 0.48| 0.79| 0.59| 0.54| 0.50| 0.53| 0.67| 0.69| 0.62| 0.56| 0.52| 0.55| 1.70| 0.22| | 1.06| 1.05| 0.68| | 0.92| | 0.92| 0.63| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | 4.20| 2.84| | 2.84| | | | | | | | | | | 7.04| |b)Shovels(LCu.M)-Cap. | 8.88| 3.69| 12.58| 1.62| | 1.62| 28.50| 3.23| 23.00| 25.30| 12.90| 38.20| 2.00| 2.00| | 2.00| 1.00| 5.00| | 5.00| | 5.00| 119.13| | -OB | 3.22| 0.95| 4.17| | | | 14.89| | 10.65| 17.55| 6.04| 23.59| 0.10| | | | | | | 1.34| | 1.34| 54.75| | -Coal(LT) | 4.68| 3.35| 8.03| 2.14| | 2.14| 7.48| 4.49| 5.30| 5.46| 2.87| 8.33| 0.31| 2.89| | 2.14| 1.01| 6.05| | 1.75| | 1.75| 43.87| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Mines: Mine Eqpt Make Mnfg Sl.No JVR OC GRADER BEML 06683 (1) MED OC 35T Dumper BEML 01381 (2) RG.OC3 100T Dumper Komatsu 10591 (3) RG.OC3 100T Dumper Komatsu 10592 (4) RG.OC3 100T Dumper Komatsu 10593 (5) RG.OC3 100T Dumper Komatsu 10594 (6) RG.OC3 100T Dumper Komatsu 10595 (7) RG.OC3 100T Dumper Komatsu 10596 (8) RG.OC3 100T Dumper Komatsu 10597 (9) RG.OC3 100T Dumper Komatsu 10598(10) RG.OC3 100T Dumper Komatsu 10599(11) RG.OC3 100T Dumper Komatsu 10600(12) RG.OC3 100T Dumper Komatsu 10601(13) RG.OC3 100T Dumper Komatsu 10602(14) RG.OC3 100T Dumper Komatsu 10603(15) KTK OC 35T Dumper BEML 01369(16) KTK OC 35T Dumper BEML 01373(17) KTK OC 35T Dumper BEML 01373(18) KTK OC 35T Dumper BEML 01374(19) KTK OC 35T Dumper BEML 01380(20) KTK OC 35T Dumper BEML 01382(21) KRG OC 35T Dumper BEML 01365(22) KRG OC 35T Dumper BEML 01372(23) KRG OC 35T Dumper BEML 01377(24) SRP OC1 35T Dumper BEML 01362(25) SRP OC1 35T Dumper BEML 01370(26) SRP OC1 35T Dumper BEML 01379(27) SRP OC1 35T Dumper BEML 01383(28) B)List of HEMM Surveyed-off during the Month: Mine Eqpt Make Mnfg Sl.No JK OC Shovel 3.3 Cu.M L & T E-012(1) JK OC 35T Dumper BEML 09754(2) JK OC 35T Dumper BEML 09762(3) JK OC 35T Dumper BEML 09765(4) JK OC 35T Dumper BEML 09770(5) JK OC 35T Dumper BEML 09771(6) JK OC 35T Dumper BEML 09772(7) JK OC 35T Dumper BEML 09959(8) JK OC Dozer BEML 12111(9) JK OC Loader Hindustan L2071(10) JK OC Support Shovel BEML 10696(11) JK OC Tanker BEML 00187(12) RG OC1 D355 Dozer BEML 10970(13) RG.OC1 D355 Dozer BEML G2000(14) RG.OC1 D355 Dozer BEML G2001(15) RG.OC1 35T Dumper BEML 09989(16) RG.OC1 35T Dumper BEML 09991(17) RG.OC1 35T Dumper BEML 09993(18) RG.OC1 35T Dumper BEML 10000(19) RG.OC1 35T Dumper BEML 10001(20) RG.OC1 35T Dumper BEML 10002(21) RG.OC1 35T Dumper BEML 11111(22) RG.OC1 35T Dumper BEML 11114(23) RG.OC1 35T Dumper BEML 11116(24) C)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No RG.OC2 RG. OC1 150mm Drill Revathi 21225 RG.OC2 RG. OC1 160mm Drill Revathi 21004 RK.OC SRP CHP D155 Dozer BEML 12038 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Mar-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Feb 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.55| 2.75| 5.30| 1.40| 1.90| 3.30| 6.91| 3.53| 3.45| 3.05| 1.75| 4.80| 1.06| 2.50| 0.50| 0.80| 0.80| 4.60| | 0.51| 1.60| 2.11| 35.06| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.55| 2.75| 5.30| 1.40| 1.90| 3.30| 6.91| 3.53| 3.45| 3.05| 1.75| 4.80| 1.06| 2.50| 0.50| 0.80| 0.80| 4.60| | 0.51| 1.60| 2.11| 35.06| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 3.98| 3.37| 7.34| 1.73| 2.30| 4.03| 7.28| 3.30| 3.62| 3.74| 1.10| 4.84| 0.88| 2.56| | 1.67| 1.35| 5.58| | 0.78| 1.05| 1.83| 38.70| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 3.98| 3.37| 7.34| 1.73| 2.30| 4.03| 7.28| 3.30| 3.62| 3.74| 1.10| 4.84| 0.88| 2.56| | 1.67| 1.35| 5.58| | 0.78| 1.05| 1.83| 38.70| | % Achievement | 156| 122| 139| 123| 121| 122| 105| 93| 105| 123| 63| 101| 83| 102| | 208| 169| 121| | 152| 66| 87| 110| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | | | | | | | | | | | 0.24| 0.24| | | | | | | | 0.71| | 0.71| 0.95| | % Rehandle in Total | | | | | | | | | | | 22| 5| | | | | | | | 91| | 39| 2| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 3.73| 2.93| | 2.93| | | | | | | | | | | 6.66| | -Shovels | 5.56| | 5.56| | | | 20.10| 1.00| 16.49| 29.00| | 29.00| | | | | | | | | | | 72.15| | -Total | 5.56| | 5.56| | | | 20.10| 1.00| 20.22| 31.93| | 31.93| | | | | | | | | | | 78.81| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 13.00| 25.50| 5.48| 6.93| 12.41| 33.00| 23.00| | | 15.00| 15.00| 11.50| 16.00| | 14.00| 9.00| 39.00| | | 10.00| 10.00| 169.41| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.06| 13.00| 31.06| 5.48| 6.93| 12.41| 53.10| 24.00| 20.22| 31.93| 15.00| 46.93| 11.50| 16.00| | 14.00| 9.00| 39.00| | | 10.00| 10.00| 248.22| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 2.58| 1.28| | 1.28| | | | | | | | | | | 3.85| | -Shovels | 3.40| 0.92| 4.32| | | | 10.20| | 10.01| 19.29| 2.08| 21.36| | | | | | | | 0.30| 0.79| 1.09| 46.98| | -Total | 3.40| 0.92| 4.32| | | | 10.20| | 12.59| 20.57| 2.08| 22.64| | | | | | | | 0.30| 0.79| 1.09| 50.83| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 13.94| | 13.94| | 2.31| 2.31| | 16.39| 3.34| | | | 4.29| 10.04| | 12.16| 10.76| 32.96| | 0.80| 0.76| 1.57| 74.80| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 17.34| 0.92| 18.26| | 2.31| 2.31| 10.20| 16.39| 15.93| 20.57| 2.08| 22.64| 4.29| 10.04| | 12.16| 10.76| 32.96| | 1.10| 1.55| 2.65| 125.63| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 69| 44| | 44| | | | | | | | | | | 58| | -Shovels | 61| | 78| | | | 51| | 61| 67| | 74| | | | | | | | | | | 65| | -Total | 61| | 78| | | | 51| | 62| 64| | 71| | | | | | | | | | | 64| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 112| | 55| | 33| 19| | 71| | | | | 37| 63| | 87| 120| 85| | | 8| 16| 44| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 96| 7| 59| | 33| 19| 19| 68| 79| 64| 14| 48| 37| 63| | 87| 120| 85| | | 16| 27| 51| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 2.15| 1.28| | 1.28| | | | | | | | | | | 3.43| | - Shovels | | | | | | | | | 0.56| | 6.78| 6.78| | | | | | | | 0.79| | 0.79| 8.13| | - Total | | | | | | | | | 2.71| 1.28| 6.78| 8.06| | | | | | | | 0.79| | 0.79| 11.56| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 22| 6| 327| 36| | | | | | | | 263| | 72| 23| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 83| 173| 101| 123| 121| 122| 61| 66| 67| 68| 241| 74| 83| 102| | 208| 169| 121| | 241| 140| 164| 75| | % Utiln. of Excav.Cap. | 66| 80| 70| 58| | 58| 52| 53| 65| 67| 71| 68| 10| 85| | 56| 90| 74| | 49| | 49| 62| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Mar-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Feb 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 84| 84| | 84| 71| | 82| 78| 75| 81| 84| | 84| 84| 66| 84| 84| | | 84| 84| | | | - In O B | 84| 84| | 84| 78| | 82| | 74| 81| 84| | 81| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | 2| | | 4| | | | 4| 3| | | | | | | | | | | | | | | - Strikes | | | | | | | 2| 6| 6| | | | | | 6| | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 9| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10625| 11458| 22083| 5833| 7917| 13750| 24679| 14708| 14375| 12708| 7292| 20000| 4417| 10417| 2083| 3333| 3333| 19167| | 2125| 6667| 8792| 141970| | Actual | 14202| 12026| 26228| 6168| 9713| 15881| 26630| 12692| 14498| 13840| 3934| 17774| 3135| 9147| | 5952| 4834| 19933| | 2777| 3766| 6542| 143314| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 23167| | 23167| | | | 71786| 4167| 84250|133042| |133042| | | | | | | | | | | 316411| | Actual | 12128| 3287| 15415| | | | 37317| | 51020| 76170| 7415| 83585| | | | | | | | | | | 187337| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 11.62| 39.47| 17.18| 27.62| 83.26| 44.66| 10.63| 21.47| 6.75| 7.38| 14.63| 8.32| 22.58| 36.69| | 32.00| 30.42| 33.39| | 22.29| 21.89| 22.06| 14.00| | Simple Formula | 21.60| 39.47| 27.26| 27.62| 83.26| 44.66| 18.56| 28.63| 10.87| 7.82| 14.63| 8.75| 22.58| 36.69| | 32.00| 30.42| 33.39| | 22.29| 21.89| 22.06| 18.95| | Excavation(Cu.M)| 32.85| 37.10| 34.19| 18.41| 55.51| 29.77| 38.39| 19.09| 44.99| 48.26| 37.33| 46.77| 15.06| 24.46| | 21.33| 20.28| 22.26| | 23.46| 30.97| 27.82| 37.52| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 895| 405| 1300| 304| 131| 435| 1893| 544| 1555| 2290| 366| 2656| 183| 347| 7| 253| 210| 817| 72| 154| 213| 367| 9822| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 12.50| 8.36| 20.86| 1.68| 0.84| 2.52| 23.09| 10.69| 13.56| 8.77| 0.45| 9.22| 3.02| 9.59| 0.05| 8.18| 4.13| 21.95| 0.86| 1.98| 2.73| 4.71| 110.48| | - Cost/Cu.M (Rs.) | 2.07| 2.64| 2.26| 1.46| 0.55| 0.94| 1.53| 4.86| 0.90| 0.38| 0.16| 0.36| 5.17| 5.62| | 7.36| 4.58| 5.90| | 2.42| 1.83| 2.04| 1.44| | - Cost/MOR/MTH (Rs.)|1396.7|2064.8|1604.8| 551.6| 640.5| 578.4|1219.7|1965.1| 871.9| 383.1| 122.8| 347.2|1652.3|2763.8| 679.4|3231.3|1968.2|2686.2|1200.1|1284.2|1282.2|1283.0| 1124.83| | PLD Allowance-Rs.Lakhs | 30.60| 13.71| 44.32| 8.06| 4.43| 12.49| 66.05| 19.27| 67.30| 82.60| 12.54| 95.14| 4.57| 10.48| | 7.23| 5.44| 23.16| 1.26| 4.87| 6.73| 11.60| 345.16| | - Cost/Cu.M (Rs.) | 5.06| 4.33| 4.81| 7.00| 2.89| 4.65| 4.39| 8.76| 4.49| 3.58| 4.46| 3.68| 7.81| 6.14| | 6.51| 6.03| 6.22| | 5.96| 4.51| 5.02| 4.50| | - Cost/MOR/MTH (Rs.)|3419.5|3385.9|3409.0|2650.6|3384.5|2871.6|3489.1|3543.2|4328.0|3607.0|3425.7|3582.0|2499.0|3019.9| |2859.5|2591.8|2834.3|1750.5|3164.6|3159.6|3161.7| 3514.2| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.51| 0.39| 0.47| 0.31| | 0.13| 0.60| 0.63| 0.79| 0.66| 0.49| 0.63| 0.30| 0.41| | 0.50| 0.32| 0.42| | 1.21| | 0.43| 0.59| | b)Other Equipments | 0.33| 0.36| 0.34| 0.45| 0.02| 0.20| 0.30| 0.44| 0.31| 0.28| 0.41| 0.34| 0.33| 0.40| | 0.48| 0.49| 0.44| | 1.44| | 0.51| 0.34| | c)Total | 0.84| 0.75| 0.81| 0.75| 0.02| 0.33| 0.90| 1.07| 1.10| 0.94| 0.90| 0.97| 0.63| 0.80| | 0.98| 0.81| 0.86| | 2.65| | 0.94| 0.93| | d)Dumpers(Ltr/CuM/KM) | 0.29| 0.21| | 0.32| | | 0.25| 0.24| 0.25| 0.21| 0.88| | 0.13| 0.17| | 0.27| 0.32| | | 0.77| | | | | e)Lubricants -Ltrs | 16270| 8583| 24853| 3542| | 3542| 43431| 11312| 46160| 38549| 32022| 70571| | 3813| | 6562| 3440| 13815| | 9789| | 9789| 346043| | -Ltrs/CuM| 0.03| 0.03| 0.03| 0.03| | 0.01| 0.03| 0.05| 0.04| 0.02| 0.03| 0.03| | 0.02| | 0.06| 0.04| 0.04| | 0.12| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.94| 3.81| 3.88| 7.04| | 7.04| 3.76| 5.62| 5.94| 13.85| 5.03| 9.90| | 2.94| | 3.03| 4.97| 3.29| | 11.30| 11.10| 11.19| 4.48| | Shovel-O B(CuM/Kg)| 2.70| 4.85| 2.98| | | | 2.51| | 1.91| 2.54| 1.54| 2.39| | | | | | | | 0.83| 1.58| 1.26| 2.28| | Dragline -O B(CuM/Kg)| | | | | | | | | 1.53| 1.54| | 1.54| | | | | | | | | | | 1.53| | b)% Cap Sensitive | 34.65| 17.88| 32.91| 20.06| | 20.06| 5.26| 11.91| 1.50| 2.99| 0.00| 2.53| | 5.36| | 4.83| 15.96| 7.66| | 89.72| 89.72| 89.72| 15.11| | c)Total Explosives(T) | 925| 107| 1033| 25| | 25| 600| 652| 755| 871| 157| 1028| | 337| | 228| 171| 736| | 102| 141| 244| 5071| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Mar-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Feb 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 108| 74| | 74| | | | | | | | | | | 93| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 87| 83| | 83| | | | | | | | | | | 85| | d)% Utilisation-SSH | | | | | | | | | 78| 61| | 61| | | | | | | | | | | 70| | -MAH | | | | | | | | | 89| 74| | 74| | | | | | | | | | | 82| | e)Down time/Hr worked | | | | | | | | | 0.17| 0.28| | 0.28| | | | | | | | | | | 0.22| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| | 3| | 3| 2| 2| | 2| 1| 5| | 5| | 5| 33| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 10| 12| 5| 17| 2| 2| | 2| 1| 5| | 5| | 5| 68| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 66| 80| 70| 58| | 58| 52| 53| 56| 66| 71| 68| 10| 85| | 56| 90| 74| | 49| | 49| 60| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 91| 93| 91| 92| | 92| 67| 69| 79| 83| 90| 85| 50| 87| | 64| 97| 80| | 86| | 86| 79| | d)% Utilisation-SSH | 65| 72| 67| 60| | 60| 47| 46| 52| 57| 64| 59| 34| 60| | 53| 79| 61| | 55| | 55| 55| | -MAH | 71| 78| 74| 66| | 66| 71| 66| 67| 69| 71| 70| 68| 68| | 82| 82| 76| | 64| | 64| 70| | e)Down time/Hr worked | 0.15| 0.10| 0.13| 0.13| | 0.13| 0.71| 0.68| 0.41| 0.30| 0.16| 0.25| 1.45| 0.21| | 0.68| 0.04| 0.33| | 0.24| | 0.24| 0.38| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 53| | 32| 49| 26| 75| | | | | | | | | | | 160| | 85 T | 8| | 8| | | | 12| | 23| | | | | | | | | | | | | | 43| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 23| 20| 43| 11| | 11| 43| 20| 27| 24| | 24| 5| 10| | 10| 8| 28| | 23| | 23| 224| | TOTAL | 36| 20| 56| 11| | 11| 113| 20| 87| 73| 26| 99| 5| 10| | 10| 8| 28| | 23| | 23| 442| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 60| 73| 67| | 67| 77| 76| 74| 71| 87| 75| 54| 88| | 63| 48| 68| | 61| | 61| 74| | c)% Utilisation-SSH | 45| 44| 44| 31| | 31| 34| 42| 37| 48| 56| 50| 34| 46| | 36| 29| 38| | 37| | 37| 40| | -MAH | 56| 73| 61| 46| | 46| 44| 56| 49| 68| 64| 66| 63| 52| | 58| 61| 56| | 60| | 60| 54| | f)Down time/Hr worked | 0.45| 0.92| 0.61| 1.09| | 1.09| 0.68| 0.57| 0.70| 0.62| 0.23| 0.49| 1.36| 0.26| | 1.01| 1.79| 0.84| | 1.05| | 1.05| 0.66| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 4| | 10| 11| 6| 17| | | | | | | | | | | 35| | TOTAL | 4| 3| 7| 2| | 2| 14| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 70| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 51| 52| 52| 87| | 87| 65| 64| 52| 64| 68| 66| | 88| | 55| 88| 76| 96| 49| | 49| 63| | c)% Utilisation-SSH | 25| 27| 26| 24| | 24| 36| 19| 33| 40| 37| 39| | 24| | 15| 33| 23| 0| 31| | 31| 32| | -MAH | 49| 51| 50| 28| | 28| 55| 30| 64| 61| 55| 59| | 28| | 28| 37| 30| 0| 64| | 64| 51| | f)Down time/Hr worked | 1.93| 1.78| 1.87| 0.55| | 0.55| 0.98| 1.86| 1.43| 0.90| 0.86| 0.88| | 0.50| | 2.92| 0.36| 1.05| | 1.60| | 1.60| 1.16| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Mar-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Feb 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 9| 7| 1| 8| | | | | | | | | | | 24| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| | | | | | | | | 1| 1| | | | | | | | | | | 2| | 150 mm | 2| 2| 5| 1| | 1| 6| 1| 5| 3| 4| 7| 1| 2| | 1| 1| 4| | 2| | 2| 31| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 14| 10| 7| 17| 1| 2| | 1| 1| 4| | 2| | 2| 59| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 23.15| 27.68| 24.63| 0.00| | 0.00| 28.94| 25.98| 25.87| 22.71| 28.84| 25.68| 0.00| 21.25| | 15.35| 31.57| 19.77| | 23.23| | 23.23| 25.22| | c)% Availability | 81| 66| 74| 77| | 77| 71| 88| 86| 87| 89| 88| 97| 95| | 61| 91| 84| | 77| | 77| 82| | d)% Utilisation-SSH | 40| 23| 32| 22| | 22| 28| 18| 23| 23| 33| 27| 17| 20| | 42| 13| 24| | 38| | 38| 26| | -MAH | 50| 35| 44| 28| | 28| 39| 21| 27| 26| 37| 30| 18| 21| | 68| 14| 29| | 49| | 49| 32| | e)Down time/Hr worked | 0.47| 1.50| 0.81| 1.05| | 1.05| 1.05| 0.65| 0.62| 0.57| 0.34| 0.46| 0.20| 0.28| | 0.93| 0.72| 0.64| | 0.61| | 0.61| 0.69| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 6| 2| 3| | 3| 3| | 1| | 1| 1| 3| | 2| | 2| 22| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| 1| 2| | 1| 1| 4| 1| 2| | 2| 38| | WATER TANKER | 4| 2| 6| 2| | 2| 12| 3| 8| 7| 5| 12| 1| 2| | 2| 1| 5| 1| 2| | 2| 52| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 5| 1| 6| 30| 9| 17| 14| 18| 32| 3| 6| | 5| 4| 15| 3| 7| | 7| 137| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 72| 72| 72| 74| 83| 75| 71| 82| 74| 67| 65| 66| 75| 92| | 50| 60| 68| 96| 77| | 77| 71| | c)% Utilisation-SSH | 24| 33| 27| 28| 37| 30| 31| 29| 34| 44| 19| 30| 30| 28| | 16| 38| 25| 0| 36| | 36| 29| | -MAH | 33| 46| 37| 38| 44| 39| 44| 35| 45| 66| 29| 46| 40| 31| | 32| 64| 37| 0| 46| | 46| 41| | d)Down time/Hr worked | 1.17| 0.85| 1.04| 0.93| 0.45| 0.82| 0.93| 0.64| 0.77| 0.76| 1.81| 1.13| 0.81| 0.28| | 3.21| 1.05| 1.24| | 0.65| | 0.65| 0.99| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 59| 34| 93| 21| 1| 22| 184| 38| 142| 122| 64| 186| 11| 23| | 20| 15| 58| 4| 40| | 40| 778| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 78| 65| 73| 73| 83| 74| 74| 76| 74| 72| 80| 75| 63| 90| | 59| 60| 71| 96| 67| | 67| 73| | c)% Utilisation-SSH | 42| 42| 42| 32| 37| 32| 34| 36| 36| 45| 42| 44| 32| 38| | 31| 34| 35| 0| 38| | 38| 39| | -MAH | 54| 65| 57| 44| 44| 44| 46| 48| 49| 63| 53| 59| 51| 43| | 53| 57| 49| 0| 57| | 57| 53| | d)Down time/Hr worked | 0.53| 0.84| 0.64| 0.83| 0.45| 0.81| 0.77| 0.67| 0.72| 0.61| 0.48| 0.57| 1.18| 0.28| | 1.32| 1.16| 0.83| | 0.86| | 0.86| 0.68| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | 4.73| 2.56| | 2.56| | | | | | | | | | | 7.28| |b)Shovels(LCu.M)-Cap. | 8.83| 3.58| 12.42| 2.00| | 2.00| 28.50| 4.04| 23.00| 24.48| 13.73| 38.20| 2.00| 2.00| | 2.00| 1.00| 5.00| | 4.25| | 4.25| 119.41| | -OB | 3.40| 0.92| 4.32| | | | 10.20| | 10.57| 13.71| 8.86| 22.57| | | | | | | | 1.09| | 1.09| 48.74| | -Coal(LT) | 3.72| 2.91| 6.63| 1.73| | 1.73| 6.73| 3.24| 3.62| 3.73| 1.34| 5.07| 0.30| 2.56| | 1.67| 1.35| 5.58| | 1.49| | 1.49| 34.39| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Mines: Mine Eqpt Make Mnfg Sl.No PK OC 100T Dumper Komatsu 10560 KRG OC GRADER BEML 06685 B)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No PK OC SRP OC 35T Dumper BEML 09972 MED OC SRP OC 3.0 Cu.M.Shovel L & T TB-592 RG.OC3 SRP OC 35T Dumper GMMCO 00297 RG.OC3 SRP OC 35T Dumper GMMCO 00306 RG.OC2 RG. OC1 100T Dumper KOMATSU 10255 RG.OC2 RG. OC1 100T Dumper KOMATSU 10256 RG.OC2 RG. OC1 100T Dumper KOMATSU 10257 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Feb-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jan 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.65| 3.60| 6.25| 1.52| 2.75| 4.27| 7.03| 3.78| 3.58| 3.28| 2.00| 5.28| 1.11| 2.68| 0.50| 0.84| 0.84| 4.86| | 0.53| 1.65| 2.18| 38.34| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.65| 3.60| 6.25| 1.52| 2.75| 4.27| 7.03| 3.78| 3.58| 3.28| 2.00| 5.28| 1.11| 2.68| 0.50| 0.84| 0.84| 4.86| | 0.53| 1.65| 2.18| 38.34| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 4.19| 4.00| 8.18| 1.77| 2.55| 4.32| 8.30| 3.79| 4.08| 4.40| 1.30| 5.70| 1.02| 2.91| | 1.76| 1.36| 6.03| | 1.20| 1.58| 2.78| 44.20| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 4.19| 4.00| 8.18| 1.77| 2.55| 4.32| 8.30| 3.79| 4.08| 4.40| 1.30| 5.70| 1.02| 2.91| | 1.76| 1.36| 6.03| | 1.20| 1.58| 2.78| 44.20| | % Achievement | 158| 111| 131| 116| 93| 101| 118| 100| 114| 134| 65| 108| 92| 109| | 210| 162| 124| | 226| 96| 127| 115| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | | | | | | | | | | | 0.32| 0.32| | | | | | | | 1.50| | 1.50| 1.82| | % Rehandle in Total | | | | | | | | | | | 25| 6| | | | | | | | 125| | 54| 4| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 3.88| 3.05| | 3.05| | | | | | | | | | | 6.93| | -Shovels | 5.80| | 5.80| | | | 21.20| 1.00| 18.12| 30.50| | 30.50| | | | | | | | | | | 76.62| | -Total | 5.80| | 5.80| | | | 21.20| 1.00| 22.00| 33.55| | 33.55| | | | | | | | | | | 83.55| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 13.50| 26.00| 6.00| 6.93| 12.93| 33.00| 23.00| | | 15.00| 15.00| 12.50| 16.50| | 14.00| 10.00| 40.50| | | 10.00| 10.00| 172.93| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.30| 13.50| 31.80| 6.00| 6.93| 12.93| 54.20| 24.00| 22.00| 33.55| 15.00| 48.55| 12.50| 16.50| | 14.00| 10.00| 40.50| | | 10.00| 10.00| 256.48| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 2.35| 1.51| | 1.51| | | | | | | | | | | 3.86| | -Shovels | 4.73| 0.35| 5.07| | | | 11.95| 0.07| 11.00| 25.87| 2.70| 28.57| | | | | | | | | 0.56| 0.56| 57.23| | -Total | 4.73| 0.35| 5.07| | | | 11.95| 0.07| 13.35| 27.38| 2.70| 30.09| | | | | | | | | 0.56| 0.56| 61.09| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 15.15| | 15.15| 1.04| 2.42| 3.46| 2.10| 17.48| 4.52| | | | 6.93| 12.01| | 13.50| 13.78| 39.28| | 1.22| 4.73| 5.95| 94.87| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 19.88| 0.35| 20.22| 1.04| 2.42| 3.46| 14.05| 17.55| 17.87| 27.38| 2.70| 30.09| 6.93| 12.01| | 13.50| 13.78| 39.28| | 1.22| 5.30| 6.52| 155.95| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 61| 50| | 50| | | | | | | | | | | 56| | -Shovels | 81| | 87| | | | 56| 7| 61| 85| | 94| | | | | | | | | | | 75| | -Total | 81| | 87| | | | 56| 7| 61| 82| | 90| | | | | | | | | | | 73| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 121| | 58| 17| 35| 27| 6| 76| | | | | 55| 73| | 96| 138| 97| | | 47| 60| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 109| 3| 64| 17| 35| 27| 26| 73| 81| 82| 18| 62| 55| 73| | 96| 138| 97| | | 53| 65| 61| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 2.45| 1.72| | 1.72| | | | | | | | | | | 4.17| | - Shovels | | | | | | | | | 0.48| | 7.10| 7.10| | | | | | | | 0.55| | 0.55| 8.14| | - Total | | | | | | | | | 2.93| 1.72| 7.10| 8.82| | | | | | | | 0.55| | 0.55| 12.31| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 22| 6| 263| 29| | | | | | | | | | 98| 20| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 99| 125| 106| 116| 93| 101| 68| 74| 66| 85| 268| 91| 92| 109| | 210| 162| 124| | 226| 147| 166| 83| | % Utiln. of Excav.Cap. | 83| 80| 82| 59| | 59| 61| 60| 69| 88| 84| 87| 14| 97| | 59| 91| 80| | 59| | 59| 73| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Feb-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jan 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | 93| 83| | 87| 93| 93| 93| 93| | 90| 93| 75| 93| 93| | | 93| 93| | | | - In O B | 93| 93| | 93| 90| | 87| 21| 93| 93| 93| | 90| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | | | | | | | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 7| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10600| 14400| 25000| 4903| 9167| 14070| 24241| 15120| 14320| 13120| 8000| 21120| 4440| 10720| 2000| 3360| 3360| 19440| | 2120| 6600| 8720| 146471| | Actual | 13508| 12889| 26397| 5698| 9233| 14932| 28619| 12231| 13163| 14184| 4195| 18380| 3396| 9390| | 5679| 4399| 19467| | 3865| 5091| 8957| 145541| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 23200| | 23200| | | | 73103| 4000| 88000|134200| |134200| | | | | | | | | | | 322503| | Actual | 15244| 1113| 16357| | | | 41207| 963| 43065| 88326| 8725| 97052| | | | | | | | | | | 198644| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 12.13| 40.38| 18.42| 24.47| 80.16| 41.52| 10.40| 21.88| 6.15| 8.23| 17.10| 9.34| 22.02| 35.09| | 28.77| 25.75| 30.55| | 27.98| 27.81| 27.88| 14.09| | Simple Formula | 19.19| 40.38| 25.80| 24.47| 80.16| 41.53| 17.83| 28.46| 10.38| 7.82| 17.11| 8.93| 22.02| 35.09| | 28.77| 25.75| 30.55| | 27.98| 27.81| 27.88| 18.46| | Excavation(Cu.M)| 34.44| 30.41| 33.18| 16.32| 53.44| 27.69| 37.56| 19.48| 40.89| 53.92| 46.98| 53.10| 14.68| 23.39| | 19.18| 17.17| 20.37| | 18.65| 28.49| 24.26| 37.82| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 894| 404| 1298| 307| 131| 438| 1897| 543| 1561| 2349| 318| 2667| 183| 344| 7| 253| 213| 817| 72| 158| 210| 368| 9844| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 10.79| 8.98| 19.77| 0.02| 0.84| 0.86| 14.20| 5.30| 10.91| 2.16| 0.22| 2.38| 1.32| 12.51| 0.02| 9.17| 3.02| 24.73| 0.70| 1.81| 2.39| 4.20| 84.38| | - Cost/Cu.M (Rs.) | 1.44| 2.99| 1.88| 0.02| 0.49| 0.30| 0.81| 2.04| 0.68| 0.07| 0.06| 0.07| 1.95| 6.45| | 7.81| 3.33| 6.15| | 2.26| 1.48| 1.74| 0.93| | - Cost/MOR/MTH (Rs.)|1206.7|2223.7|1523.3| 7.6| 638.4| 196.3| 748.4| 975.9| 699.1| 92.0| 70.1| 89.4| 723.8|3636.4| 339.7|3624.0|1419.6|3026.4| 974.9|1142.5|1139.5|1140.8| 857.1| | PLD Allowance-Rs.Lakhs | 38.47| 16.52| 54.99| 9.36| 4.87| 14.23| 83.72| 23.39| 84.31|103.46| 13.12|116.59| 5.10| 13.07| | 9.02| 6.43| 28.52| 1.47| 6.04| 8.00| 14.04| 426.34| | - Cost/Cu.M (Rs.) | 5.12| 5.49| 5.22| 7.95| 2.86| 4.94| 4.79| 9.01| 5.25| 3.41| 3.67| 3.44| 7.51| 6.73| | 7.68| 7.08| 7.09| | 7.56| 4.95| 5.81| 4.71| | - Cost/MOR/MTH (Rs.)|4303.2|4088.3|4236.3|3049.8|3716.3|3249.1|4413.3|4307.4|5400.9|4404.5|4127.1|4371.4|2786.7|3798.3| |3563.8|3020.2|3490.3|2041.7|3819.8|3809.7|3814.1| 4331.0| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.46| 0.52| 0.47| 0.35| | 0.14| 0.69| 0.59| 0.74| 0.61| 0.58| 0.61| 0.30| | | 0.44| 0.38| 0.22| | 1.39| | 0.46| 0.59| | b)Other Equipments | 0.31| 0.48| 0.36| 0.49| 0.02| 0.21| 0.32| 0.45| 0.32| 0.26| 0.45| 0.32| 0.52| 0.02| | 0.51| 0.51| 0.28| | 1.50| | 0.50| 0.33| | c)Total | 0.77| 0.99| 0.83| 0.84| 0.02| 0.35| 1.01| 1.04| 1.06| 0.86| 1.03| 0.94| 0.82| 0.02| | 0.96| 0.89| 0.49| | 2.89| | 0.96| 0.92| | d)Dumpers(Ltr/CuM/KM) | 0.27| 0.23| | 0.32| | | 0.31| 0.26| 0.25| 0.20| 0.77| | | | | 0.21| 0.35| | | 0.68| | | | | e)Lubricants -Ltrs | 19092| 8200| 27292| 6372| | 6372| 56860| 12147| 60733| 48523| 28080| 76603| | 3285| | 5896| 4650| 13831| | 8795| | 8795| 395526| | -Ltrs/CuM| 0.03| 0.03| 0.03| 0.05| | 0.02| 0.03| 0.05| 0.04| 0.02| 0.03| 0.02| | 0.02| | 0.05| 0.05| 0.03| | 0.11| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 5.37| 4.09| 4.66| 7.52| | 7.52| 3.51| 6.28| 6.72| 3.88| 4.15| 3.94| | 3.06| | 3.12| 4.47| 3.31| | 7.33| 7.28| 7.30| 4.24| | Shovel-O B(CuM/Kg)| 2.61| 5.08| 2.70| | | | 2.34| 3.10| 1.77| 2.30| 1.31| 2.15| | | | | | | | | 2.32| 2.32| 2.14| | Dragline -O B(CuM/Kg)| | | | | | | | | 1.00| | | | | | | | | | | | | | 1.64| | b)% Cap Sensitive | 39.52| 18.72| 37.54| 20.00| | 20.00| 5.22| 10.33| 0.83| 2.84| 0.00| 2.38| | 5.42| | 4.98| 17.20| 7.69| | 92.02| 86.64| 88.82| 15.97| | c)Total Explosives(T) | 993| 105| 1097| 24| | 24| 803| 606| 918| 1237| 238| 1476| | 463| | 236| 177| 876| | 164| 241| 405| 6203| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Feb-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jan 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 110| 94| | 94| | | | | | | | | | | 103| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 84| 91| | 91| | | | | | | | | | | 88| | d)% Utilisation-SSH | | | | | | | | | 76| 78| | 78| | | | | | | | | | | 77| | -MAH | | | | | | | | | 91| 85| | 85| | | | | | | | | | | 88| | e)Down time/Hr worked | | | | | | | | | 0.21| 0.11| | 0.11| | | | | | | | | | | 0.16| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 4| | 3| | 3| 2| 2| | 2| 1| 5| | 4| | 4| 33| | TOTAL | 6| 3| 9| 2| | 2| 15| 4| 10| 12| 5| 17| 2| 2| | 2| 1| 5| | 4| | 4| 68| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 83| 80| 82| 59| | 59| 61| 60| 62| 87| 84| 86| 14| 97| | 59| 91| 80| | 59| | 59| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 93| 89| 91| 91| | 91| 68| 93| 66| 83| 84| 83| 52| 96| | 56| 97| 80| | 88| | 88| 79| | d)% Utilisation-SSH | 66| 71| 68| 64| | 64| 50| 51| 51| 62| 68| 64| 35| 68| | 37| 79| 58| | 59| | 59| 57| | -MAH | 71| 80| 74| 70| | 70| 73| 54| 77| 75| 81| 77| 67| 71| | 67| 82| 73| | 67| | 67| 73| | e)Down time/Hr worked | 0.11| 0.16| 0.13| 0.14| | 0.14| 0.64| 0.13| 0.67| 0.28| 0.23| 0.26| 1.36| 0.06| | 1.18| 0.04| 0.34| | 0.20| | 0.20| 0.37| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 52| | 32| 46| 29| 75| | | | | | | | | | | 159| | 85 T | 8| | 8| | | | 12| | 23| | | | | | | | | | | | | | 43| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 23| 20| 43| 11| | 11| 44| 20| 29| 24| | 24| 5| 10| | 10| 8| 28| | 20| | 20| 224| | TOTAL | 36| 20| 56| 11| | 11| 113| 20| 89| 70| 29| 99| 5| 10| | 10| 8| 28| | 20| | 20| 441| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 78| 60| 71| 57| | 57| 77| 75| 73| 71| 80| 74| 58| 85| | 52| 53| 64| | 51| | 51| 72| | c)% Utilisation-SSH | 46| 46| 46| 32| | 32| 38| 44| 39| 57| 58| 58| 27| 52| | 31| 34| 40| | 40| | 40| 44| | -MAH | 60| 77| 65| 56| | 56| 50| 58| 54| 80| 73| 78| 45| 61| | 60| 65| 62| | 79| | 79| 61| | f)Down time/Hr worked | 0.48| 0.87| 0.62| 1.36| | 1.36| 0.61| 0.56| 0.69| 0.50| 0.35| 0.46| 1.57| 0.28| | 1.54| 1.37| 0.90| | 1.21| | 1.21| 0.64| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 4| | 10| 11| 6| 17| | | | | | | | | | | 35| | TOTAL | 4| 3| 7| 2| | 2| 14| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 70| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 67| 57| 63| 86| | 86| 69| 64| 47| 67| 62| 65| | 93| | 32| 93| 70| 96| 68| | 68| 64| | c)% Utilisation-SSH | 33| 34| 33| 28| | 28| 40| 23| 37| 45| 39| 43| | 30| | 19| 50| 29| 0| 39| | 39| 37| | -MAH | 49| 59| 52| 32| | 32| 58| 36| 78| 67| 63| 66| | 32| | 60| 54| 41| 0| 57| | 57| 57| | f)Down time/Hr worked | 0.99| 1.26| 1.10| 0.51| | 0.51| 0.78| 1.58| 1.45| 0.73| 0.96| 0.82| | 0.24| | 3.49| 0.15| 1.02| | 0.81| | 0.81| 0.98| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Feb-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jan 2013 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 9| 7| 1| 8| | | | | | | | | | | 24| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 1| 1| | | | | | | | | | | 2| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| 1| 2| | 1| 1| 4| | 2| | 2| 31| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 14| 10| 7| 17| 1| 2| | 1| 1| 4| | 2| | 2| 59| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 22.56| 22.40| 22.50| 0.00| | 0.00| 30.83| 24.67| 24.77| 24.00| 31.01| 27.53| 2.00| 17.26| | 24.47| 34.51| 21.68| | 28.55| | 28.55| 26.33| | c)% Availability | 85| 74| 80| 82| | 82| 68| 94| 78| 85| 77| 81| 95| 94| | 53| 94| 82| | 77| | 77| 78| | d)% Utilisation-SSH | 42| 28| 36| 18| | 18| 31| 18| 30| 28| 44| 34| 4| 26| | 19| 13| 21| | 19| | 19| 30| | -MAH | 49| 38| 45| 23| | 23| 46| 19| 38| 34| 57| 42| 4| 28| | 37| 14| 26| | 25| | 25| 39| | e)Down time/Hr worked | 0.34| 0.93| 0.55| 0.98| | 0.98| 1.04| 0.32| 0.73| 0.54| 0.53| 0.54| 1.20| 0.21| | 2.43| 0.43| 0.83| | 1.17| | 1.17| 0.72| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 6| 2| 3| | 3| 3| | 1| | 1| 1| 3| | 2| | 2| 22| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| 1| 1| | 1| 1| 3| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 2| | 2| 12| 3| 8| 7| 5| 12| 1| 2| | 2| 1| 5| 1| 2| | 2| 52| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 5| 1| 6| 30| 9| 17| 14| 18| 32| 3| 5| | 5| 4| 14| 3| 7| | 7| 136| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 76| 80| 72| 65| 71| 69| 70| 71| 68| 70| 69| 90| 93| | 54| 83| 75| 96| 79| | 79| 73| | c)% Utilisation-SSH | 30| 44| 35| 27| 33| 28| 33| 26| 37| 47| 22| 33| 35| 37| | 14| 29| 26| 0| 39| | 39| 32| | -MAH | 37| 58| 43| 38| 52| 40| 49| 37| 53| 70| 31| 48| 39| 40| | 25| 35| 34| 0| 49| | 49| 44| | d)Down time/Hr worked | 0.63| 0.54| 0.59| 1.02| 1.05| 1.03| 0.93| 1.14| 0.79| 0.68| 1.35| 0.93| 0.28| 0.19| | 3.36| 0.58| 0.95| | 0.53| | 0.53| 0.84| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 59| 34| 93| 21| 1| 22| 184| 39| 144| 119| 67| 186| 11| 22| | 20| 15| 57| 4| 36| | 36| 776| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 66| 75| 68| 65| 68| 73| 76| 71| 73| 75| 74| 68| 90| | 51| 69| 70| 96| 64| | 64| 72| | c)% Utilisation-SSH | 45| 46| 45| 33| 33| 33| 38| 37| 39| 53| 46| 51| 30| 46| | 26| 36| 36| 0| 41| | 41| 43| | -MAH | 56| 69| 60| 49| 52| 49| 52| 49| 55| 73| 61| 69| 43| 51| | 51| 52| 51| 0| 65| | 65| 59| | d)Down time/Hr worked | 0.46| 0.73| 0.56| 0.97| 1.05| 0.98| 0.70| 0.65| 0.75| 0.51| 0.54| 0.52| 1.07| 0.23| | 1.91| 0.85| 0.83| | 0.88| | 0.88| 0.64| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | 4.80| 3.23| | 3.23| | | | | | | | | | | 8.03| |b)Shovels(LCu.M)-Cap. | 8.87| 3.72| 12.59| 2.00| | 2.00| 28.50| 4.24| 23.00| 25.30| 12.90| 38.20| 2.00| 2.00| | 2.00| 1.00| 5.00| | 4.00| | 4.00| 119.53| | -OB | 4.73| 0.34| 5.07| | | | 11.94| 0.07| 11.48| 19.20| 9.81| 29.01| | | | | | | | 0.55| | 0.55| 58.11| | -Coal(LT) | 3.94| 3.94| 7.88| 1.77| | 1.77| 8.05| 3.73| 4.08| 4.40| 1.62| 6.02| 0.43| 2.91| | 1.76| 1.36| 6.03| | 2.70| | 2.70| 40.68| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Mines: Mine Eqpt Make Mnfg Sl.No PK OC 100T Dumper Komatsu 10551 PK OC 100T Dumper Komatsu 10553 PK OC 100T Dumper Komatsu 10557 PK OC 100T Dumper Komatsu 10558 PK OC 100T Dumper Komatsu 10559 RG OC3 250MM Drill Atlas Capco 10194 KTK OC 150MM Drill RECP 21216 KRG OC 150MM Drill Revathi 21217 SRP OC 150MM Drill RECP 21218 B)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No DOR OC2 MED OC 3.0 Cu.M.Shovel L & T TB-592 PK OC SRP OC 35T Dumper BEML 09970 C)List of Surveyed Off HEMM during the month Mine Eqpt Make Mnfg Sl.No PK OC D355 Dozer BEML 00987 SRP OC 35T Dumper BEML 11119 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jan-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.67| 3.55| 6.22| 1.52| 2.70| 4.22| 7.54| 3.73| 3.85| 3.17| 1.60| 4.77| 1.08| 2.68| 0.50| 0.84| 0.84| 4.86| | 0.54| 1.70| 2.24| 38.51| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.67| 3.55| 6.22| 1.52| 2.70| 4.22| 7.54| 3.73| 3.85| 3.17| 1.60| 4.77| 1.08| 2.68| 0.50| 0.84| 0.84| 4.86| | 0.54| 1.70| 2.24| 38.51| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 3.15| 3.82| 6.98| 1.52| 3.01| 4.52| 8.37| 4.18| 3.31| 4.74| 1.01| 5.74| 0.40| 2.80| | 1.79| 0.99| 5.58| | 1.04| 1.46| 2.50| 41.58| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 3.15| 3.82| 6.98| 1.52| 3.01| 4.52| 8.37| 4.18| 3.31| 4.74| 1.01| 5.74| 0.40| 2.80| | 1.79| 0.99| 5.58| | 1.04| 1.46| 2.50| 41.58| | % Achievement | 118| 108| 112| 100| 111| 107| 111| 112| 86| 149| 63| 120| 37| 104| | 213| 118| 115| | 193| 86| 112| 108| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | | 0.03| 0.03| | | | | | | | 0.23| 0.23| | | | | | | | 1.59| | 1.59| 1.85| | % Rehandle in Total | | 1| 0| | | | | | | | 23| 4| | | | | | | | 152| | 64| 4| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 3.97| 3.12| | 3.12| | | | | | | | | | | 7.09| | -Shovels | 5.64| | 5.64| | | | 21.00| 1.00| 18.63| 30.80| | 30.80| | | | | | | | | | | 77.07| | -Total | 5.64| | 5.64| | | | 21.00| 1.00| 22.60| 33.92| | 33.92| | | | | | | | | | | 84.16| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 13.50| 26.00| 6.00| 6.67| 12.67| 28.00| 23.00| | | 15.00| 15.00| 12.50| 17.00| | 14.00| 10.00| 41.00| | 7.10| 7.00| 14.10| 172.27| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.14| 13.50| 31.64| 6.00| 6.67| 12.67| 49.00| 24.00| 22.60| 33.92| 15.00| 48.92| 12.50| 17.00| | 14.00| 10.00| 41.00| | 7.10| 7.00| 14.10| 256.43| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 2.16| 1.68| | 1.68| | | | | | | | | | | 3.84| | -Shovels | 4.47| 0.42| 4.89| | | | 13.43| 0.07| 13.50| 26.08| 3.64| 29.72| | | | | | | | | 0.46| 0.46| 62.08| | -Total | 4.47| 0.42| 4.89| | | | 13.43| 0.07| 15.66| 27.76| 3.64| 31.41| | | | | | | | | 0.46| 0.46| 65.92| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 14.36| | 14.36| 3.87| 2.33| 6.20| 6.23| 19.68| 4.01| | | | 8.86| 12.32| | 14.35| 13.02| 39.70| | 4.28| 5.91| 10.19| 109.22| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.82| 0.42| 19.25| 3.87| 2.33| 6.20| 19.66| 19.75| 19.67| 27.76| 3.64| 31.41| 8.86| 12.32| | 14.35| 13.02| 39.70| | 4.28| 6.37| 10.65| 175.15| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 54| 54| | 54| | | | | | | | | | | 54| | -Shovels | 79| | 87| | | | 64| 7| 72| 85| | 97| | | | | | | | | | | 81| | -Total | 79| | 87| | | | 64| 7| 69| 82| | 93| | | | | | | | | | | 78| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 115| | 55| 64| 35| 49| 22| 86| | | | | 71| 72| | 103| 130| 97| | 60| 84| 72| 63| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 104| 3| 61| 64| 35| 49| 40| 82| 87| 82| 24| 64| 71| 72| | 103| 130| 97| | 60| 91| 76| 68| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 1.91| 1.38| | 1.38| | | | | | | | | | | 3.29| | - Shovels | 1.00| | 1.00| | | | | | 0.49| | 6.87| 6.87| | | | | | | | 0.46| | 0.46| 8.82| | - Total | 1.00| | 1.00| | | | | | 2.40| 1.38| 6.87| 8.25| | | | | | | | 0.46| | 0.46| 12.11| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | 22| | 20| | | | | | 15| 5| 189| 26| | | | | | | | | | 100| 18| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 89| 126| 97| 100| 111| 107| 73| 82| 71| 86| 404| 95| 37| 104| | 213| 118| 115| | 193| 127| 143| 85| | % Utiln. of Excav.Cap. | 85| 81| 84| 51| | 51| 66| 90| 74| 90| 88| 90| 7| 93| | 60| 33| 62| | 55| | 55| 76| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jan-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | 93| 88| | 93| 93| 93| 93| 93| | 93| 93| 78| 93| 93| | | 93| 93| | | | - In O B | 93| 93| | 93| 93| | 93| 15| 93| 93| 93| | 93| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | | | | | | | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 5| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10269| 13654| 23923| 5630| 8710| 14339| 24323| 14346| 14808| 12192| 6154| 18346| 4154| 10720| 1923| 3231| 3231| 19105| | 2077| 6538| 8615| 141959| | Actual | 10177| 12337| 22514| 4891| 10256| 15147| 26984| 13471| 10686| 15278| 3246| 18525| 1299| 9030| | 5766| 3204| 17999| | 3360| 4702| 8062| 134687| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 21692| | 21692| | | | 67742| 3846| 86923|130462| |130462| | | | | | | | | | | 310665| | Actual | 14408| 1363| 15771| | | | 43323| 1430| 50516| 89563| 11750|101313| | | | | | | | | | | 212352| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 10.86| 39.11| 17.97| 20.74| 95.63| 43.27| 11.13| 24.20| 6.87| 8.54| 12.18| 9.01| 9.04| 36.03| | 29.86| 21.09| 30.02| | 25.86| 26.20| 26.06| 14.53| | Simple Formula | 14.85| 39.11| 22.50| 20.74| 95.63| 43.27| 17.72| 31.51| 8.49| 8.57| 12.18| 9.04| 9.04| 36.03| | 29.86| 21.09| 30.02| | 25.86| 26.20| 26.06| 17.54| | Excavation(Cu.M)| 30.93| 30.40| 30.76| 13.83| 63.75| 28.85| 40.27| 21.55| 45.80| 55.93| 52.21| 55.45| 6.03| 24.02| | 19.91| 14.06| 20.01| | 17.24| 25.79| 22.20| 39.49| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 889| 406| 1295| 307| 133| 440| 1902| 545| 1574| 2326| 348| 2674| 179| 334| 12| 249| 171| 766| 73| 155| 213| 368| 9816| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 11.36| 5.94| 17.31| 0.01| 0.48| 0.49| 16.64| 5.11| 13.49| 3.14| 0.27| 3.41| 2.02| 6.63| | 9.92| 3.86| 20.42| 0.31| 0.41| 0.57| 0.98| 80.16| | - Cost/Cu.M (Rs.) | 1.73| 2.00| 1.81| 0.01| 0.24| 0.16| 0.88| 1.79| 0.75| 0.10| 0.06| 0.10| 7.52| 3.55| | 8.33| 5.84| 5.49| | 0.59| 0.39| 0.46| 0.86| | - Cost/MOR/MTH (Rs.)|1278.2|1463.6|1336.3| 3.7| 359.1| 111.1| 874.7| 936.9| 857.1| 134.9| 78.4| 127.5|1128.3|1985.4| |3985.7|2259.2|2665.7| 423.0| 264.7| 266.0| 265.5| 816.7| | PLD Allowance-Rs.Lakhs | 37.14| 16.47| 53.61| 7.69| 4.29| 11.98| 83.38| 23.31| 83.50|104.32| 14.87|119.19| 4.38| 13.35| 0.09| 8.81| 5.57| 27.83| 1.06| 5.11| 7.07| 12.18| 420.43| | - Cost/Cu.M (Rs.) | 5.65| 5.54| 5.62| 7.61| 2.14| 3.97| 4.39| 8.16| 4.67| 3.37| 3.45| 3.38| 16.30| 7.15| | 7.40| 8.41| 7.48| | 7.37| 4.92| 5.72| 4.49| | - Cost/MOR/MTH (Rs.)|4177.8|4057.6|4140.1|2506.3|3225.0|2723.6|4383.9|4277.9|5305.1|4484.9|4273.7|4457.4|2445.4|3996.6| 780.6|3539.5|3257.6|3632.6|1449.6|3299.6|3317.3|3309.9| 4283.1| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.55| 0.52| 0.54| 0.38| | 0.13| 0.60| 0.58| 0.73| 0.58| 0.60| 0.60| 0.73| 0.39| | 0.49| 0.41| 0.43| | 1.94| | 0.63| 0.59| | b)Other Equipments | 0.36| 0.46| 0.39| 0.53| 0.01| 0.18| 0.30| 0.42| 0.30| 0.24| 1.19| 0.45| 0.83| 0.41| | 0.49| 0.66| 0.48| | 1.53| | 0.50| 0.33| | c)Total | 0.91| 0.98| 0.93| 0.92| 0.01| 0.31| 0.90| 1.00| 1.03| 0.83| 2.76| 1.05| 1.57| 0.80| | 0.98| 1.07| 0.90| | 3.47| | 1.13| 0.92| | d)Dumpers(Ltr/CuM/KM) | 0.33| 0.24| | 0.37| | | 0.24| 0.26| 0.22| 0.23| 0.70| | | 0.15| | 0.22| 0.34| | | 1.80| | | | | e)Lubricants -Ltrs | 19088| 9135| 28223| 5558| | 5558| 59655| 12956| 67455| 50054| 24465| 74519| | 5628| | 8362| 4891| 18881| | 8746| | 8746| 411920| | -Ltrs/CuM| 0.03| 0.03| 0.03| 0.05| | 0.02| 0.03| 0.05| 0.04| 0.02| 0.06| 0.02| | 0.03| | 0.07| 0.07| 0.05| | 0.13| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 4.11| 3.95| 4.02| 6.36| | 6.36| 3.26| 5.86| 9.03| 3.73| 3.98| 3.77| | 3.00| | 4.06| 4.11| 3.45| | 5.40| 5.47| 5.44| 3.86| | Shovel-O B(CuM/Kg)| 1.83| 3.84| 1.91| | | | 2.28| 2.51| 1.83| 2.50| 1.06| 2.14| | | | | | | | | 1.31| 1.31| 2.07| | Dragline -O B(CuM/Kg)| | | | | | | | | 0.88| 0.99| | 0.99| | | | | | | | | | | 0.92| | b)% Cap Sensitive | 45.56| 18.58| 43.12| 20.02| | 20.02| 3.75| 10.68| 0.49| 3.02| 0.00| 2.37| | 9.34| | 3.89| 4.00| 6.71| | 26.38| 88.96| 85.09| 14.60| | c)Total Explosives(T) | 1087| 108| 1195| 24| | 24| 1108| 694| 1019| 1340| 369| 1709| | 444| | 238| 184| 865| | 20| 302| 322| 6937| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jan-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 93| 89| | 89| | | | | | | | | | | 91| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 85| 87| | 87| | | | | | | | | | | 86| | d)% Utilisation-SSH | | | | | | | | | 76| 75| | 75| | | | | | | | | | | 75| | -MAH | | | | | | | | | 89| 85| | 85| | | | | | | | | | | 87| | e)Down time/Hr worked | | | | | | | | | 0.20| 0.17| | 0.17| | | | | | | | | | | 0.18| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| | 3| | 3| 2| 2| | 2| 2| 6| | 4| | 4| 33| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 10| 12| 5| 17| 2| 2| | 2| 2| 6| | 4| | 4| 68| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 85| 81| 84| 51| | 51| 66| 90| 70| 90| 88| 90| 7| 93| | 60| 33| 62| | 55| | 55| 75| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 94| 87| 91| 87| | 87| 70| 89| 80| 81| 93| 84| 46| 95| | 61| 55| 71| | 80| | 80| 79| | d)% Utilisation-SSH | 66| 66| 66| 59| | 59| 50| 63| 56| 62| 73| 66| 30| 66| | 50| 43| 53| | 56| | 56| 58| | -MAH | 71| 76| 73| 68| | 68| 72| 71| 71| 77| 79| 78| 65| 69| | 82| 77| 75| | 70| | 70| 73| | e)Down time/Hr worked | 0.10| 0.20| 0.13| 0.23| | 0.23| 0.60| 0.18| 0.36| 0.31| 0.10| 0.24| 1.83| 0.07| | 0.77| 1.04| 0.55| | 0.35| | 0.35| 0.35| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 47| | 32| 46| 29| 75| | | | | | | | | | | 154| | 85 T | 8| | 8| | | | 12| | 23| | | | | | | | | | | | | | 43| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 23| 20| 43| 11| | 11| 45| 20| 29| 24| | 24| 5| 10| | 10| 8| 28| | 20| | 20| 225| | TOTAL | 36| 20| 56| 11| | 11| 109| 20| 89| 70| 29| 99| 5| 10| | 10| 8| 28| | 20| | 20| 437| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 77| 62| 72| 70| | 70| 77| 72| 68| 73| 79| 75| 61| 85| | 45| 50| 61| | 60| | 60| 72| | c)% Utilisation-SSH | 46| 43| 45| 31| | 31| 41| 45| 42| 58| 59| 58| 23| 40| | 32| 26| 33| | 41| | 41| 45| | -MAH | 60| 70| 63| 44| | 44| 53| 63| 61| 79| 74| 78| 38| 46| | 70| 53| 54| | 69| | 69| 63| | f)Down time/Hr worked | 0.49| 0.87| 0.62| 0.97| | 0.97| 0.57| 0.62| 0.77| 0.46| 0.35| 0.43| 1.70| 0.38| | 1.74| 1.88| 1.18| | 0.97| | 0.97| 0.63| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| 2| | 2| 15| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 70| 54| 64| 77| | 77| 72| 79| 42| 69| 65| 67| | 96| | 26| 85| 70| 100| 39| | 39| 64| | c)% Utilisation-SSH | 34| 29| 32| 23| | 23| 40| 24| 34| 45| 39| 43| | 19| | 19| 45| 23| 0| 28| | 28| 35| | -MAH | 48| 53| 50| 30| | 30| 55| 31| 80| 66| 60| 63| | 20| | 72| 52| 33| 0| 72| | 72| 54| | f)Down time/Hr worked | 0.88| 1.61| 1.13| 0.98| | 0.98| 0.71| 0.87| 1.70| 0.69| 0.89| 0.76| | 0.23| | 3.94| 0.33| 1.34| | 2.19| | 2.19| 1.02| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jan-2013 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Dec 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 8| 8| 1| 8| | | | | | | | | | | 23| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 1| 1| | | | | | | | | | | 2| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| | 1| | 1| 1| 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 13| 11| 7| 17| | 1| | 1| 1| 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 26.55| 26.75| 26.61| 0.00| | 0.00| 29.34| 25.87| 22.73| 23.55| 30.79| 27.35| | 16.48| | 27.11| 17.60| 19.49| | 33.35| | 33.35| 26.03| | c)% Availability | 94| 58| 78| 79| | 79| 65| 93| 81| 85| 78| 83| | 97| | 74| 97| 89| | 70| | 70| 78| | d)% Utilisation-SSH | 46| 22| 35| 19| | 19| 30| 19| 32| 28| 48| 36| | 47| | 23| 21| 31| | 34| | 34| 33| | -MAH | 49| 39| 45| 25| | 25| 46| 20| 40| 33| 61| 44| | 49| | 31| 21| 35| | 48| | 48| 42| | e)Down time/Hr worked | 0.13| 1.86| 0.64| 1.11| | 1.11| 1.16| 0.36| 0.59| 0.51| 0.45| 0.48| | 0.07| | 1.14| 0.16| 0.37| | 0.90| | 0.90| 0.66| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 6| 2| 3| | 3| 3| | 1| | 1| 1| 3| | 2| | 2| 22| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| 1| 1| | 1| 1| 3| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 2| | 2| 12| 3| 8| 7| 5| 12| 1| 2| | 2| 1| 5| 1| 2| | 2| 52| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 5| 1| 6| 30| 9| 17| 14| 18| 32| 3| 5| | 5| 4| 14| 3| 7| | 7| 136| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 85| 67| 79| 78| 92| 81| 66| 63| 65| 64| 63| 64| 71| 93| | 28| 60| 60| 100| 66| | 66| 68| | c)% Utilisation-SSH | 25| 32| 27| 24| 15| 23| 32| 28| 34| 42| 18| 29| 25| 22| | 13| 26| 20| 0| 32| | 32| 28| | -MAH | 29| 48| 34| 31| 16| 28| 48| 44| 52| 65| 29| 45| 35| 23| | 47| 44| 33| 0| 48| | 48| 41| | d)Down time/Hr worked | 0.61| 1.01| 0.77| 0.90| 0.54| 0.86| 1.06| 1.31| 1.04| 0.86| 2.01| 1.26| 1.18| 0.31| | 5.43| 1.52| 2.01| | 1.04| | 1.04| 1.17| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 59| 34| 93| 21| 1| 22| 181| 38| 143| 120| 68| 186| 10| 21| | 20| 16| 57| 4| 35| | 35| 769| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 65| 75| 75| 92| 76| 73| 73| 68| 74| 74| 74| 61| 90| | 42| 58| 64| 100| 62| | 62| 72| | c)% Utilisation-SSH | 44| 41| 43| 31| 15| 30| 39| 39| 41| 53| 46| 51| 25| 36| | 27| 29| 31| 0| 40| | 40| 42| | -MAH | 54| 64| 57| 41| 16| 40| 53| 54| 60| 72| 62| 68| 41| 39| | 65| 50| 48| 0| 64| | 64| 59| | d)Down time/Hr worked | 0.44| 0.86| 0.59| 0.82| 0.54| 0.81| 0.69| 0.68| 0.80| 0.49| 0.56| 0.51| 1.57| 0.28| | 2.12| 1.42| 1.16| | 0.95| | 0.95| 0.67| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | 4.07| 3.06| | 3.06| | | | | | | | | | | 7.13| |b)Shovels(LCu.M)-Cap. | 8.78| 3.69| 12.48| 2.00| | 2.00| 28.50| 3.12| 23.00| 25.30| 12.90| 38.20| 1.88| 2.00| | 2.00| 2.00| 6.00| | 4.00| | 4.00| 119.18| | -OB | 5.47| 0.42| 5.89| | | | 13.42| 0.07| 13.99| 19.74| 10.51| 30.25| | | | | | | | 0.46| | 0.46| 64.09| | -Coal(LT) | 3.00| 3.86| 6.86| 1.52| | 1.52| 7.95| 4.10| 3.29| 4.73| 1.23| 5.97| 0.19| 2.80| | 1.79| 0.99| 5.58| | 2.63| | 2.63| 38.08| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Mines: Mine Eqpt Make Mnfg Sl.No PK OC 100T Dumper Komatsu 10576 PK OC 100T Dumper Komatsu 10586 PK OC 100T Dumper Komatsu 10589 PK OC 100T Dumper Komatsu 10590 PK OC 100T Dumper Komatsu 10550 PK OC 100T Dumper Komatsu 10552 PK OC 100T Dumper Komatsu 10554 PK OC 100T Dumper Komatsu 10556 RG OC1 100T Dumper Komatsu 10588 RG OC3 250MM Drill Atlas Capco 10193 KTK OC 3.0 Cu.M. Shovel L & T 60206 SRP OC1 3.0 Cu.M. Shovel L & T KOMATSU 60208 B)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No PK.OC JK OC Loader Cater Piller 00251 RG.OC2 RG OC1 100T Dumper KOMATSU 10575 RG.OC1 RG OC2 100T Dumper KOMATSU 10255 RG.OC1 RG OC2 100T Dumper KOMATSU 10256 RG.OC1 RG OC2 100T Dumper KOMATSU 10257 PK.OC YLD CSP Loader Cater Piller 00251 C)List of Surveyed Off HEMM during the month Mine Eqpt Make Mnfg Sl.No RG OC1 35T Dumper BEML 11117 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Dec-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.57| 3.50| 6.07| 1.52| 2.44| 3.96| 7.28| 3.60| 4.00| 3.00| 1.55| 4.55| 1.05| 2.57| 0.50| 0.74| 0.74| 4.55| | 0.51| 1.64| 2.15| 37.20| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.57| 3.50| 6.07| 1.52| 2.44| 3.96| 7.28| 3.60| 4.00| 3.00| 1.55| 4.55| 1.05| 2.57| 0.50| 0.74| 0.74| 4.55| | 0.51| 1.64| 2.15| 37.20| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.29| 3.03| 5.32| 1.31| 2.66| 3.97| 7.66| 3.79| 2.89| 3.86| 0.81| 4.67| 0.24| 1.39| | 1.38| 0.89| 3.66| | 0.95| 1.40| 2.35| 34.54| | - Contractor | | | | | | | 0.05| 0.13| | | | | | | | | | | | 0.02| | 0.02| 0.20| | - Total | 2.29| 3.03| 5.32| 1.31| 2.66| 3.97| 7.71| 3.92| 2.89| 3.86| 0.81| 4.67| 0.24| 1.39| | 1.38| 0.89| 3.66| | 0.97| 1.40| 2.38| 34.75| | % Achievement | 89| 87| 88| 86| 109| 100| 106| 109| 72| 129| 52| 103| 23| 54| | 186| 120| 81| | 190| 86| 110| 93| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.00| 0.08| 0.08| | | | | | | | 0.49| 0.49| | | | | | | | 1.29| | 1.29| 1.86| | % Rehandle in Total | 0| 3| 2| | | | | | | | 60| 10| | | | | | | | 136| | 55| 5| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 4.13| 3.25| | 3.25| | | | | | | | | | | 7.38| | -Shovels | 5.43| | 5.43| | | | 20.50| 0.50| 17.55| 30.80| | 30.80| | | | | | | | | | | 74.78| | -Total | 5.43| | 5.43| | | | 20.50| 0.50| 21.68| 34.05| | 34.05| | | | | | | | | | | 82.16| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 13.00| 25.50| 5.50| 6.67| 12.17| 28.00| 23.00| | | 15.00| 15.00| 12.00| 16.00| | 13.50| 13.00| 42.50| | 12.00| 7.00| 19.00| 177.17| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 17.93| 13.00| 30.93| 5.50| 6.67| 12.17| 48.50| 23.50| 21.68| 34.05| 15.00| 49.05| 12.00| 16.00| | 13.50| 13.00| 42.50| | 12.00| 7.00| 19.00| 259.33| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 1.13| 0.65| | 0.65| | | | | | | | | | | 1.78| | -Shovels | 4.39| 0.55| 4.94| | | | 10.43| | 10.71| 20.52| 2.40| 22.92| | | | | | | | 0.10| | 0.10| 49.10| | -Total | 4.39| 0.55| 4.94| | | | 10.43| | 11.84| 21.18| 2.40| 23.57| | | | | | | | 0.10| | 0.10| 50.88| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 11.90| 2.04| 13.94| 3.62| 1.63| 5.25| 6.67| 22.00| 3.76| | | | 7.12| 8.75| | 13.18| 13.01| 34.94| | 6.51| 5.50| 12.00| 105.67| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 16.28| 2.59| 18.87| 3.62| 1.63| 5.25| 17.10| 22.00| 15.60| 21.18| 2.40| 23.57| 7.12| 8.75| | 13.18| 13.01| 34.94| | 6.61| 5.50| 12.11| 156.55| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 27| 20| | 20| | | | | | | | | | | 24| | -Shovels | 81| | 91| | | | 51| | 61| 67| | 74| | | | | | | | | | | 66| | -Total | 81| | 91| | | | 51| | 55| 62| | 69| | | | | | | | | | | 62| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 95| 16| 55| 66| 24| 43| 24| 96| | | | | 59| 55| | 98| 100| 82| | 54| 79| 63| 60| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 91| 20| 61| 66| 24| 43| 35| 94| 72| 62| 16| 48| 59| 55| | 98| 100| 82| | 55| 79| 64| 60| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 0.95| 0.46| | 0.46| | | | | | | | | | | 1.40| | - Shovels | | | | | | | | | 0.26| | 5.82| 5.82| | | | | | | | 0.15| | 0.15| 6.23| | - Total | | | | | | | | | 1.20| 0.46| 5.82| 6.28| | | | | | | | 0.15| | 0.15| 7.64| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 10| 2| 243| 27| | | | | | | | 147| | 147| 15| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 83| 110| 90| 86| 109| 100| 61| 87| 57| 66| 284| 72| 23| 54| | 186| 120| 81| | 217| 86| 117| 69| | % Utiln. of Excav.Cap. | 66| 74| 68| 44| | 44| 53| 83| 55| 65| 70| 67| 0| 46| | 46| 48| 47| | 58| | 58| 60| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Dec-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 90| | 84| 70| | 87| 75| 81| 75| 86| | 45| 85| 75| 87| 71| | | 90| 90| | | | - In O B | 90| 90| | 84| 77| | 87| | 81| 75| 86| | 75| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 6| 18| | | 12| | 3| | 9| 12| 1| | | 5| | | 4| | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 8| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10260| 14000| 24260| 5429| 8133| 13562| 24267| 14400| 16000| 12000| 6200| 18200| 4200| 10260| 2000| 2960| 2960| 18180| | 2040| 6560| 8600| 141669| | Actual | 7634| 10096| 17730| 4679| 11401| 16080| 26403| 15157| 10686| 15435| 2826| 18262| 1607| 4923| | 4755| 3742| 13420| | 3167| 4680| 7847| 127191| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 21720| | 21720| | | | 68333| 2000| 86720|136200| |136200| | | | | | | | | | | 314973| | Actual | 14625| 1833| 16458| | | | 35966| | 43852| 84700| 8357| 93057| | | | | | | | | | | 189332| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 10.23| 33.16| 16.87| 19.38| 87.39| 40.49| 9.89| 22.65| 5.57| 7.03| 8.96| 7.30| 6.06| 18.95| | 24.27| 20.54| 20.74| | 29.05| 28.62| 28.79| 12.29| | Simple Formula | 11.33| 33.16| 18.13| 19.38| 87.39| 40.49| 17.60| 30.20| 7.77| 7.48| 8.96| 7.70| 6.06| 18.95| | 24.27| 20.54| 20.74| | 29.05| 28.62| 28.79| 15.51| | Excavation(Cu.M)| 29.27| 28.13| 28.91| 12.92| 58.26| 26.99| 35.72| 20.14| 37.06| 46.02| 32.48| 44.00| 4.04| 12.64| | 16.18| 13.69| 13.83| | 22.53| 19.08| 20.46| 33.18| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 897| 396| 1293| 310| 133| 443| 1909| 549| 1585| 2282| 402| 2684| 173| 336| 15| 247| 162| 760| 73| 146| 220| 366| 9835| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 11.83| 8.06| 19.90| | 0.98| 0.98| 12.31| 2.98| 8.02| 2.17| 0.31| 2.48| 0.95| 4.01| | 10.48| 3.99| 18.48| 0.27| 0.28| 0.40| 0.68| 67.04| | - Cost/Cu.M (Rs.) | 2.00| 3.14| 2.35| | 0.56| 0.37| 0.79| 1.18| 0.58| 0.09| 0.11| 0.09| 5.93| 4.31| | 11.40| 6.76| 7.58| | 0.38| 0.43| 0.41| 0.91| | - Cost/MOR/MTH (Rs.)|1319.1|2036.4|1538.8| | 740.4| 222.3| 644.6| 542.6| 505.7| 94.9| 77.6| 92.3| 551.1|1193.0| |4244.3|2462.2|2431.7| 367.1| 192.0| 183.4| 186.8| 681.7| | PLD Allowance-Rs.Lakhs | 21.85| 9.30| 31.16| 9.25| 5.49| 14.74| 43.58| 14.13| 51.47| 57.10| 9.52| 66.62| 2.20| 7.39| 0.24| 5.05| 2.99| 15.67| 0.27| 2.92| 4.20| 7.11| 246.96| | - Cost/Cu.M (Rs.) | 3.70| 3.62| 3.67| 10.59| 3.09| 5.57| 2.81| 5.59| 3.74| 2.40| 3.24| 2.50| 13.72| 7.95| | 5.49| 5.06| 6.42| | 3.96| 4.49| 4.25| 3.34| | - Cost/MOR/MTH (Rs.)|2436.2|2349.6|2409.7|2983.6|4124.8|3326.2|2283.0|2573.1|3247.4|2502.2|2368.8|2482.2|1274.5|2200.3|1605.5|2044.6|1844.8|2062.2| 373.5|1996.9|1908.5|1943.8| 2511.0| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.43| 0.46| 0.44| 0.42| | 0.14| 0.62| 0.57| 0.85| 0.62| 0.64| 0.64| 0.44| 0.52| | 0.55| 0.32| 0.49| | 1.55| | 0.68| 0.62| | b)Other Equipments | 0.35| 0.47| 0.38| 0.59| 0.01| 0.20| 0.33| 0.45| 0.33| 0.29| 0.48| 0.37| 0.63| 0.57| | 0.56| 0.67| 0.59| | 1.29| | 0.57| 0.36| | c)Total | 0.78| 0.92| 0.82| 1.00| 0.01| 0.34| 0.95| 1.02| 1.19| 0.91| 1.12| 1.00| 1.07| 1.10| | 1.11| 0.99| 1.08| | 2.84| | 1.25| 0.99| | d)Dumpers(Ltr/CuM/KM) | 0.35| 0.29| | 0.47| | | 0.34| 0.27| 0.26| 0.23| 0.69| | | 0.19| | 0.27| 0.21| | | 0.85| | | | | e)Lubricants -Ltrs | 14165| 6336| 20501| 4564| | 4564| 55233| 9740| 53217| 39999| 26110| 66109| | 3561| | 7300| 6226| 17087| | 8386| | 8386| 351484| | -Ltrs/CuM| 0.02| 0.02| 0.02| 0.05| | 0.02| 0.04| 0.04| 0.04| 0.02| 0.03| 0.03| | 0.04| | 0.08| 0.11| 0.07| | 0.11| | 0.05| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.62| 4.08| 3.87| 7.22| | 7.22| 3.99| 5.33| 7.08| 4.02| 3.60| 3.94| | 2.67| | 2.73| 2.88| 2.74| | 5.44| 5.59| 5.53| 3.88| | Shovel-O B(CuM/Kg)| 2.81| 4.90| 2.95| | | | 2.19| | 2.11| 2.31| 0.96| 2.01| | | | | | | | | | | 2.14| | Dragline -O B(CuM/Kg)| | | | | | | | | 0.75| | | | | | | | | | | | | | 1.19| | b)% Cap Sensitive | 23.46| 10.25| 20.99| 19.97| | 19.97| 3.42| 10.64| 0.75| 3.24| 0.00| 2.54| | 8.95| | 4.32| 96.51| 29.00| | 91.70| 91.70| 91.70| 17.94| | c)Total Explosives(T) | 751| 172| 923| 18| | 18| 906| 680| 698| 985| 272| 1257| | 283| | 240| 172| 696| | 216| 311| 528| 5705| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Dec-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 47| 32| | 32| | | | | | | | | | | 41| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 60| 33| | 33| | | | | | | | | | | 46| | d)% Utilisation-SSH | | | | | | | | | 46| 29| | 29| | | | | | | | | | | 37| | -MAH | | | | | | | | | 76| 89| | 89| | | | | | | | | | | 80| | e)Down time/Hr worked | | | | | | | | | 0.87| 2.28| | 2.28| | | | | | | | | | | 1.44| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| | 3| | 3| 1| 2| | 2| 2| 6| | 3| | 3| 31| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 10| 12| 5| 17| 1| 2| | 2| 2| 6| | 3| | 3| 66| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 66| 74| 68| 44| | 44| 53| 83| 56| 69| 70| 70| 0| 46| | 46| 48| 47| | 58| | 58| 61| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 87| 89| 88| 90| | 90| 73| 94| 82| 87| 93| 88| 19| 97| | 71| 72| 81| | 79| | 79| 82| | d)% Utilisation-SSH | 62| 61| 62| 61| | 61| 48| 64| 50| 57| 67| 60| 1| 48| | 50| 51| 49| | 56| | 56| 55| | -MAH | 72| 68| 70| 68| | 68| 66| 68| 61| 66| 72| 68| 7| 50| | 70| 71| 61| | 71| | 71| 66| | e)Down time/Hr worked | 0.21| 0.17| 0.20| 0.16| | 0.16| 0.58| 0.10| 0.36| 0.23| 0.11| 0.19| 60.50| 0.07| | 0.58| 0.56| 0.38| | 0.37| | 0.37| 0.32| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 39| | 32| 47| 27| 74| | | | | | | | | | | 145| | 85 T | 8| | 8| | | | 12| | 23| | | | | | | | | | | | | | 43| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 23| 20| 43| 11| | 11| 45| 20| 29| 25| | 25| 5| 10| | 10| 8| 28| | 20| | 20| 226| | TOTAL | 36| 20| 56| 11| | 11| 101| 20| 89| 72| 27| 99| 5| 10| | 10| 8| 28| | 20| | 20| 429| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 77| 65| 73| 76| | 76| 76| 68| 70| 73| 83| 76| 30| 78| | 58| 42| 61| | 55| | 55| 71| | c)% Utilisation-SSH | 40| 38| 39| 32| | 32| 40| 41| 35| 52| 56| 53| 11| 27| | 32| 22| 27| | 38| | 38| 40| | -MAH | 52| 58| 54| 43| | 43| 53| 60| 50| 71| 67| 70| 38| 34| | 55| 53| 45| | 68| | 68| 57| | f)Down time/Hr worked | 0.57| 0.92| 0.68| 0.76| | 0.76| 0.60| 0.78| 0.87| 0.53| 0.30| 0.46| 6.25| 0.85| | 1.32| 2.62| 1.42| | 1.19| | 1.19| 0.71| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| 2| | 2| 15| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 69| 78| 73| 46| | 46| 62| 81| 47| 78| 68| 74| | 93| | 32| 70| 68| 100| 51| | 51| 65| | c)% Utilisation-SSH | 33| 35| 34| 14| | 14| 35| 22| 26| 46| 37| 42| | 16| | 15| 28| 17| 0| 27| | 27| 32| | -MAH | 48| 45| 47| 30| | 30| 57| 27| 56| 59| 54| 57| | 17| | 46| 40| 25| 0| 53| | 53| 49| | f)Down time/Hr worked | 0.94| 0.62| 0.80| 3.94| | 3.94| 1.10| 0.84| 2.01| 0.49| 0.88| 0.62| | 0.46| | 4.67| 1.08| 1.87| | 1.82| | 1.82| 1.09| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 19-Dec-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Nov 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 7| 8| 1| 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 1| 1| | | | | | | | | | | 2| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| | 1| | 1| 1| 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 12| 11| 7| 17| | 1| | 1| 1| 3| | 1| | 1| 54| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 24.72| 23.92| 24.46| 0.00| | 0.00| 28.95| 26.75| 24.85| 23.52| 30.91| 27.14| | 16.24| | 27.02| 27.03| 21.50| | 17.94| | 17.94| 25.95| | c)% Availability | 83| 70| 77| 80| | 80| 74| 94| 85| 80| 74| 77| | 96| | 67| 89| 84| | 73| | 73| 79| | d)% Utilisation-SSH | 39| 22| 31| 21| | 21| 28| 20| 24| 27| 39| 31| | 38| | 20| 19| 26| | 30| | 30| 28| | -MAH | 47| 31| 40| 26| | 26| 37| 22| 29| 33| 52| 40| | 39| | 30| 22| 31| | 41| | 41| 35| | e)Down time/Hr worked | 0.43| 1.37| 0.74| 1.00| | 1.00| 0.93| 0.28| 0.62| 0.75| 0.68| 0.72| | 0.10| | 1.68| 0.59| 0.63| | 0.91| | 0.91| 0.74| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 7| 2| 3| | 3| 3| | 1| | | 2| 3| | 2| | 2| 23| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| 1| 1| | 1| 1| 3| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 2| | 2| 12| 3| 8| 7| 5| 12| 1| 2| | 2| 1| 5| 1| 2| | 2| 52| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 5| 1| 6| 31| 9| 17| 14| 18| 32| 3| 5| | 4| 5| 14| 3| 7| | 7| 137| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 71| 78| 79| 93| 81| 70| 62| 68| 66| 74| 70| 66| 73| | 49| 43| 56| 100| 68| | 68| 70| | c)% Utilisation-SSH | 25| 26| 25| 29| 22| 28| 29| 25| 31| 40| 19| 28| 23| 18| | 15| 26| 20| 0| 34| | 34| 27| | -MAH | 31| 37| 33| 37| 23| 34| 42| 40| 46| 60| 26| 40| 35| 24| | 30| 62| 35| 0| 50| | 50| 39| | d)Down time/Hr worked | 0.76| 1.12| 0.88| 0.74| 0.34| 0.68| 1.01| 1.51| 1.03| 0.86| 1.35| 1.04| 1.45| 1.49| | 3.43| 2.17| 2.27| | 0.97| | 0.97| 1.13| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 59| 34| 93| 21| 1| 22| 174| 38| 142| 122| 65| 186| 9| 21| | 19| 17| 57| 4| 34| | 34| 759| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 79| 70| 76| 75| 93| 76| 73| 72| 70| 74| 79| 76| 42| 82| | 55| 49| 64| 100| 60| | 60| 72| | c)% Utilisation-SSH | 39| 37| 39| 32| 22| 32| 38| 36| 34| 48| 43| 46| 15| 26| | 28| 26| 26| 0| 37| | 37| 39| | -MAH | 50| 53| 51| 43| 23| 42| 52| 51| 49| 65| 55| 61| 35| 32| | 50| 53| 42| 0| 62| | 62| 53| | d)Down time/Hr worked | 0.54| 0.80| 0.63| 0.76| 0.34| 0.75| 0.72| 0.78| 0.90| 0.54| 0.50| 0.52| 4.01| 0.71| | 1.63| 1.96| 1.37| | 1.07| | 1.07| 0.72| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | 2.08| 1.11| | 1.11| | | | | | | | | | | 3.19| |b)Shovels(LCu.M)-Cap. | 8.97| 3.53| 12.50| 2.00| | 2.00| 28.50| 3.06| 23.00| 25.30| 12.90| 38.20| 1.00| 2.00| | 2.00| 1.23| 5.23| | 3.00| | 3.00| 116.49| | -OB | 4.39| 0.55| 4.93| | | | 10.43| | 10.97| 14.98| 8.22| 23.20| | | | | | | | 0.26| | 0.26| 49.78| | -Coal(LT) | 2.29| 3.11| 5.40| 1.31| | 1.31| 7.16| 3.79| 2.88| 3.86| 1.30| 5.16| 0.01| 1.39| | 1.38| 0.89| 3.66| | 2.24| | 2.24| 31.61| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Mines: Mine Eqpt Make Mnfg Sl.No PK OC 100T Dumper Komatsu 10583 RG OC1 100T Dumper Komatsu 10568 RG OC1 100T Dumper Komatsu 10578 RG OC1 100T Dumper Komatsu 10584 RG OC1 100T Dumper Komatsu 10585 RG.OC3 85T Dumpers GMMCO 8JL52 (which was surveyed-off previously is withdrawn surveyed-off) B)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No GK.OC JVR OC 35T Dumper BEML 10136 GK.OC JVR OC 35T Dumper BEML 10139 RK.OC SRP OC1 3.0 Cu.M.Shovel L&T B-544 DOR.OC1 KRG.OC Loader H.M. 00251 (Transferred in 10/2012 but commissioned in 11/2012) THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Nov-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.57| 3.50| 6.07| 1.52| 2.56| 4.08| 6.95| 3.60| 3.56| 3.00| 1.55| 4.55| 1.05| 2.57| 0.50| 0.74| 0.74| 4.55| | 0.51| 1.64| 2.15| 36.55| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.57| 3.50| 6.07| 1.52| 2.56| 4.08| 6.95| 3.60| 3.56| 3.00| 1.55| 4.55| 1.05| 2.57| 0.50| 0.74| 0.74| 4.55| | 0.51| 1.64| 2.15| 36.55| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.58| 3.21| 5.78| 1.28| 2.84| 4.12| 7.51| 3.34| 2.96| 3.77| 0.55| 4.31| 0.49| 1.39| | 1.20| 0.85| 3.45| | 1.01| 1.44| 2.46| 34.41| | - Contractor | | | | | | | 0.37| 0.02| | | | | | | | | | | | 0.01| | 0.01| 0.40| | - Total | 2.58| 3.21| 5.78| 1.28| 2.84| 4.12| 7.89| 3.35| 2.96| 3.77| 0.55| 4.31| 0.49| 1.39| | 1.20| 0.85| 3.45| | 1.02| 1.44| 2.46| 34.81| | % Achievement | 100| 92| 95| 84| 111| 101| 113| 93| 83| 126| 35| 95| 46| 54| | 163| 115| 76| | 200| 88| 114| 95| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | | 0.29| 0.29| | | | | | | | 0.05| 0.05| | | | | | | | 1.42| | 1.42| 1.76| | % Rehandle in Total | | 9| 5| | | | | | | | 8| 1| | | | | | | | 140| | 58| 5| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 3.65| 2.87| | 2.87| | | | | | | | | | | 6.52| | -Shovels | 5.43| | 5.43| | | | 19.90| 0.50| 18.05| 30.80| | 30.80| | | | | | | | | | | 74.68| | -Total | 5.43| | 5.43| | | | 19.90| 0.50| 21.70| 33.67| | 33.67| | | | | | | | | | | 81.20| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 13.00| 25.50| 3.00| 6.66| 9.66| 26.50| 21.00| 10.00| | 15.00| 15.00| 11.50| 19.50| | 8.21| 13.50| 41.21| | 12.00| 6.00| 18.00| 178.37| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 17.93| 13.00| 30.93| 3.00| 6.66| 9.66| 46.40| 21.50| 31.70| 33.67| 15.00| 48.67| 11.50| 19.50| | 8.21| 13.50| 41.21| | 12.00| 6.00| 18.00| 259.57| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 1.59| 1.83| | 1.83| | | | | | | | | | | 3.42| | -Shovels | 4.26| 0.62| 4.88| | | | 11.81| 0.00| 9.45| 16.67| 2.34| 19.01| | | | | | | | | | | 45.15| | -Total | 4.26| 0.62| 4.88| | | | 11.81| 0.00| 11.04| 18.50| 2.34| 20.84| | | | | | | | | | | 48.58| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.17| 2.77| 14.93| 4.00| 1.93| 5.93| 8.23| 20.75| 3.12| | | | 6.38| 7.47| | 11.76| 10.49| 29.72| | 5.50| 3.35| 8.85| 97.91| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 16.43| 3.39| 19.82| 4.00| 1.93| 5.93| 20.04| 20.75| 14.16| 18.50| 2.34| 20.84| 6.38| 7.47| | 11.76| 10.49| 29.72| | 5.50| 3.35| 8.85| 146.49| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 44| 64| | 64| | | | | | | | | | | 52| | -Shovels | 78| | 90| | | | 59| 0| 52| 54| | 62| | | | | | | | | | | 60| | -Total | 78| | 90| | | | 59| 0| 51| 55| | 62| | | | | | | | | | | 60| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 97| 21| 59| 133| 29| 61| 31| 99| 31| | | | 55| 38| | 143| 78| 72| | 46| 56| 49| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 92| 26| 64| 133| 29| 61| 43| 97| 45| 55| 16| 43| 55| 38| | 143| 78| 72| | 46| 56| 49| 56| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 0.95| 1.51| | 1.51| | | | | | | | | | | 2.46| | - Shovels | | | | | | | | | 0.26| | 5.81| 5.81| | | | | | | | | | | 6.07| | - Total | | | | | | | | | 1.21| 1.51| 5.81| 7.32| | | | | | | | | | | 8.53| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 11| 8| 248| 35| | | | | | | | | | | 18| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 84| 118| 92| 84| 111| 101| 69| 77| 54| 59| 262| 65| 46| 54| | 163| 115| 76| | 198| 88| 114| 68| | % Utiln. of Excav.Cap. | 65| 84| 70| 43| | 43| 57| 74| 52| 63| 66| 64| 0| 46| | 40| 50| 45| 0| 81| | 81| 59| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Nov-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | 90| 78| | 89| 81| 80| 90| 93| | 66| 83| 75| 87| 75| | | 90| 90| | | | - In O B | 93| 93| | 90| 73| | 89| 1| 78| 90| 93| | 78| | | | | | 75| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 4| 9| | | 8| | 1| 12| 12| 3| | | | 4| | 3| | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 7| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 10260| 14000| 24260| 5067| 8258| 13325| 23167| 14400| 14240| 12000| 6200| 18200| 4200| 10260| 2000| 2960| 2960| 18180| | 2040| 6560| 8600| 138571| | Actual | 8310| 10345| 18655| 4262| 10934| 15196| 25324| 12352| 11092| 12552| 1763| 14315| 2213| 5036| | 4153| 3402| 12591| | 3372| 4813| 8185| 119923| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 21720| | 21720| | | | 66333| 2000| 86800|134680| |134680| | | | | | | | | | | 311533| | Actual | 13749| 2003| 15753| | | | 39809| 720| 42462| 61669| 7547| 69216| | | | | | | | | | | 167959| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 9.98| 34.06| 16.42| 18.26| 90.97| 40.70| 10.24| 19.34| 5.05| 5.98| 6.17| 6.00| 16.84| 18.42| | 20.01| 20.94| 19.21| | 29.25| 29.00| 29.10| 11.64| | Simple Formula | 12.28| 34.06| 19.03| 18.26| 90.97| 40.70| 16.54| 25.76| 7.65| 7.01| 6.17| 6.89| 16.84| 18.42| | 20.01| 20.94| 19.21| | 29.25| 29.00| 29.10| 15.00| | Excavation(Cu.M)| 28.50| 29.31| 28.75| 12.17| 60.65| 27.13| 37.02| 17.19| 33.65| 39.10| 30.54| 37.89| 11.23| 12.28| | 13.34| 13.96| 12.80| | 19.50| 19.34| 19.40| 30.90| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 897| 397| 1294| 310| 133| 443| 1912| 550| 1568| 2303| 382| 2685| 173| 336| 15| 247| 158| 756| 72| 150| 215| 365| 9818| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 8.04| 6.73| 14.77| | 0.14| 0.14| 9.86| 2.86| 7.35| 1.74| 0.15| 1.89| 1.76| 6.58| | 8.89| 3.19| 18.65| 0.52| 0.16| 0.23| 0.40| 58.20| | - Cost/Cu.M (Rs.) | 1.34| 2.44| 1.69| | 0.07| 0.05| 0.59| 1.28| 0.56| 0.08| 0.06| 0.08| 5.43| 7.08| | 11.07| 5.62| 8.11| | 0.24| 0.24| 0.24| 0.81| | - Cost/MOR/MTH (Rs.)| 896.3|1695.2|1141.4| | 104.9| 31.5| 515.8| 519.8| 468.7| 75.5| 40.1| 70.4|1019.2|1957.3| |3599.7|2016.6|2467.5| 720.1| 108.3| 108.7| 108.5| 592.8| | PLD Allowance-Rs.Lakhs | 28.21| 12.65| 40.87| 6.99| 4.12| 11.11| 62.51| 17.89| 65.21| 76.88| 12.13| 89.01| 3.20| 10.22| 0.32| 7.59| 4.08| 22.21| 0.25| 3.60| 5.13| 8.74| 320.99| | - Cost/Cu.M (Rs.) | 4.72| 4.59| 4.68| 8.20| 2.17| 4.04| 3.72| 8.04| 5.01| 3.66| 4.49| 3.75| 9.86| 11.00| | 9.45| 7.20| 9.66| | 5.34| 5.33| 5.34| 4.49| | - Cost/MOR/MTH (Rs.)|3145.4|3187.0|3158.2|2255.8|3095.2|2507.8|3269.4|3251.9|4159.0|3338.2|3174.8|3315.0|1850.3|3042.2|2119.5|3071.1|2583.5|2937.5| 352.9|2402.9|2387.7|2393.9| 3269.4| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.48| 0.42| 0.46| 0.38| | 0.12| 0.53| 0.58| 0.81| 0.59| 0.73| 0.69| | 0.58| | 0.57| 0.39| 0.53| | 1.62| | 0.67| 0.60| | b)Other Equipments | 0.36| 0.44| 0.38| 0.60| 0.01| 0.19| 0.30| 0.48| 0.37| 0.32| 0.50| 0.41| 0.13| 0.62| | 0.55| 0.66| 0.61| | 1.17| | 0.48| 0.37| | c)Total | 0.84| 0.86| 0.84| 0.99| 0.01| 0.31| 0.83| 1.06| 1.18| 0.91| 1.23| 1.10| 0.13| 1.20| | 1.12| 1.05| 1.14| | 2.79| | 1.15| 0.98| | d)Dumpers(Ltr/CuM/KM) | 0.36| 0.28| | 0.69| | | 0.27| 0.24| 0.28| 0.44| 0.47| | | 0.20| | 0.29| 0.26| | | 0.72| | | | | e)Lubricants -Ltrs | 19387| 6415| 25802| 4830| | 4830| 48793| 9343| 45413| 36249| 24580| 60829| | 4533| | 5222| 6310| 16065| 915| 6183| | 6183| 331882| | -Ltrs/CuM| 0.03| 0.02| 0.03| 0.06| | 0.02| 0.03| 0.04| 0.04| 0.02| 0.03| 0.03| | 0.05| | 0.07| 0.11| 0.07| | 0.09| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 9.27| 3.66| 5.01| 10.57| | 10.57| 4.24| 5.19| 6.28| 4.38| 3.35| 4.22| | 2.63| | 2.62| 3.17| 2.74| | 5.76| 5.71| 5.73| 4.18| | Shovel-O B(CuM/Kg)| 2.13| 4.38| 2.27| | | | 2.59| | 2.29| 2.56| 1.01| 2.15| | | | | | | | | | | 2.30| | Dragline -O B(CuM/Kg)| | | | | | | | | 0.90| 2.44| | 2.44| | | | | | | | | | | 1.36| | b)% Cap Sensitive | 28.16| 9.05| 23.99| 19.79| | 19.79| 3.73| 9.87| 2.67| 3.83| 0.00| 2.94| | 9.19| | 0.22| 86.94| 21.93| | 92.62| 92.62| 92.62| 17.88| | c)Total Explosives(T) | 819| 229| 1048| 12| | 12| 900| 651| 636| 812| 248| 1060| | 228| | 236| 123| 587| | 190| 273| 463| 5356| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Nov-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 58| 97| | 97| | | | | | | | | | | 75| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 70| 90| | 90| | | | | | | | | | | 80| | d)% Utilisation-SSH | | | | | | | | | 54| 79| | 79| | | | | | | | | | | 67| | -MAH | | | | | | | | | 78| 89| | 89| | | | | | | | | | | 84| | e)Down time/Hr worked | | | | | | | | | 0.55| 0.13| | 0.13| | | | | | | | | | | 0.30| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 2| 3| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| | 3| | 3| 1| 2| | 2| 1| 5| 1| 2| | 2| 30| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 10| 12| 5| 17| 1| 2| | 2| 1| 5| 1| 2| | 2| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 65| 84| 70| 43| | 43| 57| 74| 51| 59| 66| 61| | 46| | 40| 50| 45| | 81| | 81| 58| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 86| 92| 88| 91| | 91| 72| 92| 81| 79| 91| 83| 100| 96| | 67| 60| 77| 96| 89| | 89| 82| | d)% Utilisation-SSH | 63| 64| 64| 59| | 59| 48| 58| 50| 52| 66| 56| 0| 51| | 34| 53| 45| 0| 66| | 66| 53| | -MAH | 73| 70| 72| 65| | 65| 67| 63| 61| 66| 72| 68| 0| 54| | 52| 88| 58| 0| 74| | 74| 64| | e)Down time/Hr worked | 0.22| 0.13| 0.19| 0.15| | 0.15| 0.57| 0.14| 0.38| 0.40| 0.14| 0.31| | 0.08| | 0.97| 0.76| 0.52| | 0.16| | 0.16| 0.34| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 38| | 32| 43| 27| 70| | | | | | | | | | | 140| | 85 T | 8| | 8| | | | 12| | 22| | | | | | | | | | | | | | 42| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 25| 18| 43| 11| | 11| 45| 20| 29| 25| | 25| 5| 10| | 10| 8| 28| | 20| | 20| 226| | TOTAL | 38| 18| 56| 11| | 11| 100| 20| 88| 68| 27| 95| 5| 10| | 10| 8| 28| | 20| | 20| 423| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 70| 77| 69| | 69| 73| 73| 62| 69| 88| 75| 100| 77| | 50| 46| 59| 91| 62| | 62| 70| | c)% Utilisation-SSH | 41| 43| 42| 30| | 30| 42| 38| 31| 50| 59| 53| 0| 33| | 29| 23| 29| 0| 41| | 41| 40| | -MAH | 52| 62| 55| 43| | 43| 57| 52| 50| 73| 67| 71| 0| 43| | 57| 51| 49| 0| 67| | 67| 57| | f)Down time/Hr worked | 0.49| 0.70| 0.56| 1.03| | 1.03| 0.64| 0.70| 1.23| 0.61| 0.20| 0.48| | 0.71| | 1.72| 2.28| 1.43| | 0.93| | 0.93| 0.74| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| 2| | 2| 15| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 81| 74| 78| 48| | 48| 56| 83| 32| 72| 69| 71| | 88| | 37| 57| 65| 92| 51| | 51| 61| | c)% Utilisation-SSH | 36| 33| 35| 11| | 11| 35| 21| 20| 45| 43| 44| | 20| | 8| 30| 17| 9| 27| | 27| 31| | -MAH | 45| 44| 45| 23| | 23| 62| 25| 64| 62| 63| 62| | 23| | 23| 52| 26| 10| 52| | 52| 52| | f)Down time/Hr worked | 0.52| 0.81| 0.63| 4.58| | 4.58| 1.25| 0.81| 3.36| 0.62| 0.73| 0.66| | 0.58| | 7.50| 1.47| 2.02| 0.87| 1.84| | 1.84| 1.24| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-Nov-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Oct 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 7| 8| | 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 2| 2| | | | | | | | | | | 3| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| | 1| | 1| 1| 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 12| 11| 7| 18| | 1| | 1| 1| 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 24.21| 23.88| 24.10| 0.00| | 0.00| 20.72| 28.80| 24.41| 22.44| 28.20| 25.38| | 19.13| | 29.70| 41.75| 25.57| | 26.74| | 26.74| 24.06| | c)% Availability | 84| 68| 77| 85| | 85| 78| 94| 77| 76| 67| 72| | 96| | 56| 81| 77| | 78| | 78| 76| | d)% Utilisation-SSH | 41| 23| 33| 8| | 8| 26| 15| 27| 26| 40| 32| | 33| | 19| 10| 21| | 26| | 26| 28| | -MAH | 49| 33| 43| 9| | 9| 34| 16| 36| 34| 61| 44| | 34| | 33| 12| 27| | 34| | 34| 36| | e)Down time/Hr worked | 0.38| 1.39| 0.70| 1.88| | 1.88| 0.84| 0.38| 0.84| 0.94| 0.83| 0.88| | 0.11| | 2.38| 1.93| 1.08| | 0.84| | 0.84| 0.84| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 7| 2| 3| | 3| 3| | | | 1| 2| 3| | 2| | 2| 23| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| 1| 1| | 1| 1| 3| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 2| | 2| 12| 3| 8| 7| 4| 11| 1| 2| | 2| 1| 5| 1| 2| | 2| 51| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 5| 1| 6| 31| 9| 17| 14| 17| 31| 3| 4| | 5| 5| 14| 3| 7| | 7| 136| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 69| 74| 71| 82| 90| 84| 68| 66| 59| 63| 72| 68| 92| 75| | 74| 56| 68| 94| 74| | 74| 70| | c)% Utilisation-SSH | 25| 25| 25| 27| 21| 26| 29| 24| 31| 39| 17| 27| 14| 21| | 20| 31| 24| 4| 36| | 36| 27| | -MAH | 36| 34| 35| 33| 23| 31| 42| 37| 52| 61| 24| 40| 15| 28| | 27| 56| 35| 4| 49| | 49| 38| | d)Down time/Hr worked | 1.22| 1.04| 1.16| 0.66| 0.49| 0.64| 1.09| 1.40| 1.33| 0.94| 1.64| 1.18| 0.56| 1.21| | 1.30| 1.43| 1.33| 1.57| 0.73| | 0.73| 1.13| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 61| 32| 93| 21| 1| 22| 173| 38| 141| 118| 64| 182| 9| 20| | 20| 16| 56| 5| 33| | 33| 752| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 79| 73| 77| 74| 90| 74| 71| 75| 62| 71| 79| 74| 95| 81| | 57| 53| 65| 94| 66| | 66| 71| | c)% Utilisation-SSH | 41| 40| 40| 29| 21| 29| 38| 34| 31| 47| 45| 46| 9| 31| | 25| 28| 27| 3| 40| | 40| 38| | -MAH | 51| 55| 52| 40| 23| 39| 54| 45| 50| 66| 57| 62| 9| 38| | 43| 52| 43| 4| 61| | 61| 54| | d)Down time/Hr worked | 0.51| 0.67| 0.56| 0.90| 0.49| 0.88| 0.75| 0.73| 1.23| 0.63| 0.46| 0.57| 0.56| 0.62| | 1.75| 1.71| 1.29| 1.88| 0.86| | 0.86| 0.74| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | 2.54| 3.34| | 3.34| | | | | | | | | | | 5.88| |b)Shovels(LCu.M)-Cap. | 9.12| 3.50| 12.62| 2.00| | 2.00| 29.02| 3.02| 23.00| 25.30| 12.90| 38.20| 1.00| 2.00| | 2.00| 1.14| 5.14| 1.00| 2.00| | 2.00| 117.00| | -OB | 4.26| 0.60| 4.86| | | | 11.77| 0.00| 9.71| 12.38| 8.14| 20.53| | | | | | | | | | | 46.87| | -Coal(LT) | 2.48| 3.50| 5.98| 1.28| | 1.28| 7.28| 3.33| 2.92| 3.77| 0.59| 4.36| | 1.39| | 1.20| 0.85| 3.45| | 2.43| | 2.43| 31.01| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Month: Mine Eqpt Make Mnfg Sl.No PK OC 100T Dumper Komatsu 10569 PK OC 100T Dumper Komatsu 10570 PK OC 100T Dumper Komatsu 10571 PK OC 100T Dumper Komatsu 10572 PK OC 100T Dumper Komatsu 10573 PK OC 100T Dumper Komatsu 10574 PK OC 100T Dumper Komatsu 10581 PK OC 100T Dumper Komatsu 10582 RG.OC3 100T Dumper Komatsu 10577 RG.OC1 100T Dumper Komatsu 10562 RG.OC1 100T Dumper Komatsu 10563 RG.OC1 100T Dumper Komatsu 10564 RG.OC1 100T Dumper Komatsu 10565 RG.OC1 100T Dumper Komatsu 10566 RG.OC1 100T Dumper Komatsu 10567 RG.OC1 100T Dumper Komatsu 10579 RG.OC1 100T Dumper Komatsu 10580 RG.OC2 100T Dumper Komatsu 10575 RG.OC3 Water Tanker BEML 00469 KTK OC Water Tanker BEML 00298 (Previously commissioned) KTK OC Grader BEML 06387 (Previously transferred) RG.OC3 85T Dumpers GMMCO 8JL82,8JL79,8JL77,8JL56,8JL54,8JL53,8JL51,8JL50,8JL34,8JL33,8JL32,8JL31,8JL30,00025,00031 (which were surveyed-off previous month is withdrawn surveyed-off) DOR OC1 Loader TATA Telecom 02159 (Recommissioned) B)List of Surveyed Off HEMM during the month: Mine Eqpt Make Mnfg Sl.No JK5 OC Water Tanker BEML 00183 MED OC 35T Dumper GMMCO 55500 RG.OC1 Water Tanker Hindustan 00251 KRG OC Grader BEML 06386 C)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No RG.OC3 KTK OC 35T Dumper H.M. 00252 RG.OC3 KTK OC 35T Dumper H.M. 00256 RG.OC3 KTK OC 35T Dumper H.M. 00257 RG.OC3 KTK OC 35T Dumper H.M. 00258 RG.OC3 KTK OC 35T Dumper H.M. 00260 RG.OC1 SRP OC1 35T Dumper BEML 11119 RG.OC1 SRP OC1 35T Dumper BEML 11120 RG.OC1 SRP OC1 35T Dumper BEML 11121 RK.OC SRP OC1 35T Dumper H.M. 00765 RK.OC SRP OC1 35T Dumper H.M. 00769 RG.OC3 KTK OC 3.0 Cu.M.Shovel L&T 0B474 RG.OC2 RG.OC1 12.0 Cu.M.Shovel L&T 20204 KRG.OC DOR.OC2 Loader TATA 02432 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Oct-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.25| 3.10| 5.35| 1.32| 2.30| 3.62| 5.35| 3.15| 2.65| 2.60| 1.34| 3.94| 0.90| 2.25| 0.50| 0.74| 0.74| 4.23| | 0.45| 1.46| 1.91| 31.10| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.25| 3.10| 5.35| 1.32| 2.30| 3.62| 5.35| 3.15| 2.65| 2.60| 1.34| 3.94| 0.90| 2.25| 0.50| 0.74| 0.74| 4.23| | 0.45| 1.46| 1.91| 31.10| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 1.96| 2.51| 4.47| 1.34| 2.92| 4.25| 6.87| 2.63| 2.85| 3.15| 0.08| 3.23| 0.22| 1.27| | 0.98| 0.65| 2.89| | 0.33| 1.29| 1.62| 28.79| | - Contractor | | | | | | | 0.24| 0.15| | | | | | | | | | | | 0.03| | 0.03| 0.41| | - Total | 1.96| 2.51| 4.47| 1.34| 2.92| 4.25| 7.10| 2.78| 2.85| 3.15| 0.08| 3.23| 0.22| 1.27| | 0.98| 0.65| 2.89| | 0.36| 1.29| 1.65| 29.44| | % Achievement | 87| 81| 84| 101| 127| 118| 133| 88| 107| 121| 6| 82| 24| 56| | 132| 87| 68| | 79| 89| 86| 95| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.05| | 0.05| | | | | | | | 0.06| 0.06| | | | | 0.65| 0.65| | 1.62| | 1.62| 2.38| | % Rehandle in Total | 2| | 1| | | | | | | | 77| 2| | | | | | 29| | 495| | 100| 8| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 2.66| 2.09| | 2.09| | | | | | | | | | | 4.75| | -Shovels | 4.94| | 4.94| | | | 13.20| 0.50| 16.39| 20.90| | 20.90| | | | | | | | | | | 55.93| | -Total | 4.94| | 4.94| | | | 13.20| 0.50| 19.05| 22.99| | 22.99| | | | | | | | | | | 60.68| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 8.00| 7.00| 15.00| 3.00| 6.14| 9.14| 32.00| 13.00| 7.50| | 5.00| 5.00| 6.00| 14.50| | 4.00| 4.00| 22.50| | 8.00| | 8.00| 118.14| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 12.94| 7.00| 19.94| 3.00| 6.14| 9.14| 45.20| 13.50| 26.55| 22.99| 5.00| 27.99| 6.00| 14.50| | 4.00| 4.00| 22.50| | 8.00| | 8.00| 178.82| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 2.43| 1.79| | 1.79| | | | | | | | | | | 4.22| | -Shovels | 2.95| 0.59| 3.54| | | | 7.79| 0.04| 9.16| 14.28| 2.54| 16.81| | | | | | | | 0.01| | 0.01| 37.36| | -Total | 2.95| 0.59| 3.54| | | | 7.79| 0.04| 11.59| 16.07| 2.54| 18.61| | | | | | | | 0.01| | 0.01| 41.58| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 11.27| 3.84| 15.11| 3.37| 1.65| 5.01| 6.10| 15.84| 2.75| | | | 3.84| 3.14| | 6.15| 4.28| 13.56| | 4.00| 4.09| 8.09| 70.31| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 14.22| 4.43| 18.65| 3.37| 1.65| 5.01| 13.89| 15.88| 14.34| 16.07| 2.54| 18.61| 3.84| 3.14| | 6.15| 4.28| 13.56| | 4.01| 4.09| 8.11| 111.89| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 91| 86| | 86| | | | | | | | | | | 89| | -Shovels | 60| | 72| | | | 59| 7| 56| 68| | 80| | | | | | | | | | | 67| | -Total | 60| | 72| | | | 59| 7| 61| 70| | 81| | | | | | | | | | | 69| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 141| 55| 101| 112| 27| 55| 19| 122| 37| | | | 64| 22| | 154| 107| 60| | 50| | 101| 60| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 110| 63| 94| 112| 27| 55| 31| 118| 54| 70| 51| 66| 64| 22| | 154| 107| 60| | 50| | 101| 63| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 1.13| 1.21| | 1.21| | | | | | | | | | | 2.34| | - Shovels | | | | | | | | | | | 5.35| 5.35| | | | | | | | | | | 5.35| | - Total | | | | | | | | | 1.13| 1.21| 5.35| 6.56| | | | | | | | | | | 7.69| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 10| 8| 211| 35| | | | | | | | | | | 18| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 66| 110| 77| 101| 127| 118| 74| 69| 65| 73| 290| 81| 24| 56| | 132| | 53| | 78| 89| 86| 74| | % Utiln. of Excav.Cap. | 96| 134| 106| 89| | 89| 84| 113| 103| 113| 99| 107| | 84| | 65| 73| 74| 0| 131| | 131| 99| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Oct-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 90| | 86| 70| | 87| 75| 77| 73| 86| | 45| 82| 75| 82| 84| | | 78| 78| | | | - In O B | 90| 90| | 86| 74| | 52| 15| 68| 73| 86| | 73| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 1| 15| | 4| 13| | 3| 15| 22| 17| 4| | 15| 8| | 8| 6| | 75| 12| 12| | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 7| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9000| 12400| 21400| 4400| 7667| 12067| 17833| 12600| 10600| 10400| 5360| 15760| 3600| 9000| 2000| 2960| 2960| 16920| | 1800| 5840| 7640| 118420| | Actual | 6542| 8364| 14905| 4665| 12498| 17163| 23675| 10537| 11085| 12940| 289| 13229| 1450| 4637| | 3575| | 8212| | 1261| 4976| 6237| 106493| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 19760| | 19760| | | | 44000| 2000| 76200| 91960| | 91960| | | | | | | | | | | 233920| | Actual | 9834| 1970| 11804| | | | 44949| 718| 51132| 66035| 8852| 74887| | | | | | | | | | | 183491| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 7.28| 27.38| 12.38| 18.31| 92.84| 40.72| 7.73| 15.59| 5.30| 5.23| 0.89| 4.65| 7.45| 17.22| | 17.73| | 17.07| | 19.43| 19.17| 19.22| 9.46| | Simple Formula | 9.57| 27.38| 15.07| 18.31| 92.84| 40.72| 15.45| 20.40| 7.44| 5.93| 0.89| 5.18| 7.45| 17.22| | 17.73| | 17.07| | 19.43| 19.17| 19.22| 12.75| | Excavation(Cu.M)| 20.76| 24.70| 21.98| 12.21| 61.89| 27.15| 27.83| 13.88| 35.27| 34.19| 27.97| 33.27| 4.86| 11.48| | 11.82| | 11.38| | 13.84| 12.78| 12.99| 27.17| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 901| 397| 1298| 316| 135| 451| 1913| 558| 1568| 2302| 404| 2706| 125| 335| 15| 249| 149| 748| 70| 73| 293| 366| 9803| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 7.23| 6.42| 13.65| | 0.08| 0.08| 9.27| 2.98| 4.86| 1.12| 0.16| 1.27| 1.76| 4.06| | 4.84| 3.54| 12.44| 0.28| 0.06| 0.13| 0.19| 46.78| | - Cost/Cu.M (Rs.) | 1.70| 2.84| 2.09| | 0.04| 0.03| 0.75| 1.66| 0.36| 0.06| 0.06| 0.06| 12.16| 4.80| | 7.43| | 8.31| | 0.26| 0.15| 0.17| 0.77| | - Cost/MOR/MTH (Rs.)| 802.0|1618.2|1051.6| | 58.8| 17.6| 484.4| 533.2| 310.2| 48.5| 38.8| 47.1|1410.6|1211.9| |1944.3|2376.1|1663.3| 393.3| 82.1| 43.6| 51.3| 477.2| | PLD Allowance-Rs.Lakhs | 34.95| 14.95| 49.90| 7.22| 4.33| 11.55| 75.27| 21.90| 79.99| 94.76| 15.81|110.57| 3.20| 12.76| 0.40| 7.42| 5.44| 26.02| 0.15| 2.13| 8.51| 10.63| 389.19| | - Cost/Cu.M (Rs.) | 8.21| 6.60| 7.65| 8.10| 2.23| 4.07| 6.09| 12.22| 5.93| 5.22| 6.10| 5.33| 22.07| 15.10| | 11.39| | 17.39| | 9.11| 9.86| 9.70| 6.43| | - Cost/MOR/MTH (Rs.)|3879.0|3765.9|3844.4|2285.4|3209.4|2562.0|3934.4|3924.8|5101.6|4116.4|3913.6|4086.1|2560.8|3809.0|2660.1|2980.2|3649.1|3478.2| 219.5|2913.1|2903.2|2905.2| 3970.1| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.59| 0.49| 0.55| 0.34| | 0.11| 0.59| 0.63| 0.82| 0.50| 0.68| 0.59| | 0.69| | 0.59| | 0.78| | 3.59| | 0.77| 0.61| | b)Other Equipments | 0.47| 0.46| 0.47| 0.51| 0.00| 0.16| 0.37| 0.53| 0.34| 0.36| 0.51| 0.43| 0.33| 0.61| | 0.65| | 0.87| | 3.03| | 0.65| 0.41| | c)Total | 1.06| 0.95| 1.02| 0.85| 0.00| 0.27| 0.96| 1.16| 1.16| 0.86| 1.18| 1.02| 0.33| 1.30| | 1.24| | 1.65| | 6.62| | 1.41| 1.02| | d)Dumpers(Ltr/CuM/KM) | 0.40| 0.29| | | | | 0.34| 0.29| 0.30| 0.53| 0.47| | | 0.24| | 0.27| | | | 1.57| | | | | e)Lubricants -Ltrs | 14204| 7279| 21483| 4410| | 4410| 42488| 8531| 41265| 28517| 24960| 53477| | 2224| | 4645| | 6869| 942| 4886| | 4886| 275476| | -Ltrs/CuM| 0.03| 0.03| 0.03| 0.05| | 0.02| 0.03| 0.05| 0.04| 0.03| 0.03| 0.03| | 0.03| | 0.07| | 0.05| | 0.21| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 4.75| 2.84| 3.45| 14.48| | 14.48| 3.88| 5.77| 4.24| 3.09| | 3.17| | 2.90| | 2.65| | 2.68| | 4.67| 4.61| 4.62| 3.47| | Shovel-O B(CuM/Kg)| 1.96| 4.73| 2.17| | | | 2.55| | 2.51| 2.16| 1.00| 1.84| | | | | | | | | | | 2.14| | Dragline -O B(CuM/Kg)| | | | | | | | | 2.00| 1.85| | 1.85| | | | | | | | | | | 1.94| | b)% Cap Sensitive | 37.95| 21.26| 33.07| 20.16| | 20.16| 5.30| 6.67| 3.15| 4.06| 0.00| 3.13| | 58.80| | 5.63|100.00| 35.40| | 93.45| 93.45| 93.45| 19.76| | c)Total Explosives(T) | 636| 263| 898| 9| | 9| 696| 685| 554| 859| 254| 1113| | 44| | 120| 40| 204| | 86| 343| 429| 4589| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Oct-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 163| 174| | 174| | | | | | | | | | | 168| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 80| 94| | 94| | | | | | | | | | | 87| | d)% Utilisation-SSH | | | | | | | | | 67| 72| | 72| | | | | | | | | | | 69| | -MAH | | | | | | | | | 84| 76| | 76| | | | | | | | | | | 80| | e)Down time/Hr worked | | | | | | | | | 0.31| 0.09| | 0.09| | | | | | | | | | | 0.19| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| 1| 3| | 3| | 2| | 2| 1| 5| 1| 2| | 2| 30| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 11| 11| 6| 17| | 2| | 2| 1| 5| 1| 2| | 2| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 96| 134| 106| 89| | 89| 84| 113| 92| 103| 99| 101| | 84| | 65| 73| 74| | 131| | 131| 94| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 83| 90| 86| 85| | 85| 75| 92| 79| 72| 93| 79| | 95| | 72| 80| 83| 95| 74| | 74| 80| | d)% Utilisation-SSH | 56| 56| 56| 56| | 56| 44| 59| 45| 44| 52| 47| | 49| | 37| 58| 46| 9| 49| | 49| 48| | -MAH | 67| 62| 65| 66| | 66| 59| 64| 57| 61| 56| 59| | 52| | 51| 73| 56| 10| 66| | 66| 59| | e)Down time/Hr worked | 0.30| 0.18| 0.26| 0.26| | 0.26| 0.57| 0.13| 0.47| 0.65| 0.14| 0.45| | 0.10| | 0.74| 0.35| 0.37| 0.56| 0.53| | 0.53| 0.42| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | 12| | 7| | | | | | | | | | | | | | 27| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 25| 18| 43| 11| | 11| 45| 21| 34| 28| | 28| | 10| | 10| 8| 28| 2| 15| | 15| 227| | TOTAL | 38| 18| 56| 11| | 11| 92| 21| 77| 63| 26| 89| | 10| | 10| 8| 28| 2| 15| | 15| 391| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 79| 69| 76| 75| | 75| 77| 75| 62| 67| 88| 73| | 77| | 50| 49| 60| 96| 63| | 63| 71| | c)% Utilisation-SSH | 37| 38| 38| 28| | 28| 38| 36| 32| 42| 49| 44| | 30| | 26| 22| 26| 2| 39| | 39| 37| | -MAH | 47| 55| 49| 37| | 37| 50| 48| 51| 62| 56| 60| | 39| | 52| 45| 44| 2| 61| | 61| 52| | f)Down time/Hr worked | 0.55| 0.83| 0.64| 0.89| | 0.89| 0.61| 0.69| 1.21| 0.78| 0.25| 0.60| | 0.79| | 1.91| 2.31| 1.54| 2.38| 0.97| | 0.97| 0.79| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| 2| | 2| 15| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 77| 81| 36| | 36| 57| 92| 31| 66| 73| 69| | 72| | 57| 75| 67| 80| 59| | 59| 61| | c)% Utilisation-SSH | 35| 33| 34| 11| | 11| 32| 19| 20| 40| 41| 41| | 13| | 16| 38| 18| 7| 28| | 28| 30| | -MAH | 42| 43| 42| 30| | 30| 56| 21| 67| 61| 57| 59| | 19| | 28| 51| 27| 9| 47| | 47| 49| | f)Down time/Hr worked | 0.46| 0.69| 0.55| 5.96| | 5.96| 1.37| 0.43| 3.39| 0.84| 0.66| 0.76| | 2.08| | 2.76| 0.66| 1.85| 2.88| 1.47| | 1.47| 1.31| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Oct-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Sep 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 7| 8| | 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 2| 2| | | | | | | | | | | 3| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| | 1| | 1| 1| 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 12| 11| 7| 18| | 1| | 1| 1| 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 26.82| 28.89| 27.43| 0.00| | 0.00| 26.10| 23.36| 24.87| 22.58| 28.10| 25.35| | 34.83| | 37.32| 24.01| 33.05| | 27.80| | 27.80| 25.77| | c)% Availability | 86| 62| 74| 76| | 76| 86| 83| 81| 71| 73| 72| | 95| | 74| 83| 84| | 71| | 71| 78| | d)% Utilisation-SSH | 36| 17| 27| 10| | 10| 21| 12| 23| 23| 35| 28| | 17| | 15| 13| 15| | 28| | 28| 23| | -MAH | 42| 28| 37| 13| | 13| 24| 15| 28| 32| 48| 38| | 18| | 21| 15| 18| | 40| | 40| 30| | e)Down time/Hr worked | 0.40| 2.20| 0.93| 2.51| | 2.51| 0.65| 1.37| 0.83| 1.26| 0.78| 1.02| | 0.30| | 1.73| 1.34| 1.07| | 1.02| | 1.02| 0.92| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 7| 2| 3| | 3| 3| | 1| | | 1| 2| | 2| | 2| 22| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| | 2| | 1| 1| 4| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 3| | 3| 12| 3| 7| 8| 4| 12| | 2| | 2| 1| 5| 1| 2| | 2| 51| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 6| 1| 7| 31| 9| 16| 15| 17| 32| 1| 6| | 4| 4| 14| 3| 7| | 7| 135| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 74| 74| 74| 64| 75| 66| 76| 76| 62| 64| 78| 71| 85| 68| | 64| 49| 62| 87| 71| | 71| 71| | c)% Utilisation-SSH | 23| 27| 25| 20| 8| 18| 27| 22| 25| 30| 17| 23| 38| 15| | 18| 28| 19| 1| 35| | 35| 24| | -MAH | 32| 37| 33| 30| 10| 27| 36| 29| 40| 47| 21| 32| 45| 22| | 28| 56| 31| 2| 49| | 49| 33| | d)Down time/Hr worked | 1.12| 0.93| 1.05| 1.82| 3.33| 1.92| 0.87| 1.08| 1.55| 1.22| 1.32| 1.26| 0.40| 2.09| | 2.01| 1.85| 1.98| 8.69| 0.84| | 0.84| 1.25| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 61| 32| 93| 22| 1| 23| 165| 39| 130| 113| 64| 177| 1| 22| | 19| 15| 56| 7| 28| | 28| 719| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 72| 77| 70| 75| 70| 75| 79| 62| 68| 82| 73| 85| 77| | 57| 55| 64| 90| 66| | 66| 72| | c)% Utilisation-SSH | 37| 36| 37| 26| 8| 25| 35| 32| 30| 39| 39| 39| 38| 25| | 24| 27| 25| 3| 37| | 37| 34| | -MAH | 46| 50| 47| 37| 10| 36| 47| 41| 49| 57| 47| 53| 45| 33| | 41| 48| 39| 4| 56| | 56| 48| | d)Down time/Hr worked | 0.55| 0.79| 0.63| 1.16| 3.33| 1.19| 0.71| 0.66| 1.25| 0.83| 0.46| 0.69| 0.40| 0.94| | 1.79| 1.68| 1.42| 2.97| 0.94| | 0.94| 0.83| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | 3.56| 3.00| | 3.00| | | | | | | | | | | 6.56| |b)Shovels(LCu.M)-Cap. | 4.45| 1.59| 6.04| 1.00| | 1.00| 14.66| 1.54| 12.00| 11.00| 8.10| 19.10| | 1.00| | 1.00| 0.59| 2.59| 0.50| 1.00| | 1.00| 58.43| | -OB | 2.95| 0.59| 3.54| | | | 7.74| 0.04| 9.15| 9.23| 7.89| 17.13| | | | | | | | 0.01| | 0.01| 37.60| | -Coal(LT) | 2.01| 2.32| 4.33| 1.34| | 1.34| 6.79| 2.56| 2.83| 3.15| 0.15| 3.30| | 1.27| | 0.98| 0.65| 2.89| | 1.95| | 1.95| 25.98| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Month: Mine Eqpt Make Mnfg Sl.No PK OC Water Tanker BEML 00472 RG OC1 Water Tanker BEML 00068 RG OC1 Water Tanker BEML 00473 B)List of Surveyed Off HEMM during the month: Mine Eqpt Make Mnfg Sl.No MED OC 35T Dumper GMMCO 55501 MED OC 35T Dumper GMMCO 55502 RG OC3 85T Dumper GMMCO 8JL82 RG OC3 85T Dumper GMMCO 8JL79 RG OC3 85T Dumper GMMCO 8JL77 RG OC3 85T Dumper GMMCO 8JL56 RG OC3 85T Dumper GMMCO 8JL54 RG OC3 85T Dumper GMMCO 8JL53 RG OC3 85T Dumper GMMCO 8JL51 RG OC3 85T Dumper GMMCO 8JL50 RG OC3 85T Dumper GMMCO 8JL34 RG OC3 85T Dumper GMMCO 8JL33 RG OC3 85T Dumper GMMCO 8JL32 RG OC3 85T Dumper GMMCO 8JL31 RG OC3 85T Dumper GMMCO 8JL30 RG OC3 85T Dumper GMMCO 00025 RG OC3 85T Dumper GMMCO 00031 RG OC1 Water Tanker BEML 55921 C)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No KRG OC DOR OC2 150mm Drill Atlas Copco 06681 DOR OC2 KRG OC Water Tanker Hindustan 00261 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Sep-2012 ** OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.35| 3.20| 5.55| 1.30| 2.28| 3.58| 5.23| 3.23| 2.65| 2.68| 1.38| 4.06| 0.94| 2.34| 0.50| 0.70| 0.70| 4.24| | 0.47| 1.48| 1.95| 31.43| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.35| 3.20| 5.55| 1.30| 2.28| 3.58| 5.23| 3.23| 2.65| 2.68| 1.38| 4.06| 0.94| 2.34| 0.50| 0.70| 0.70| 4.24| | 0.47| 1.48| 1.95| 31.43| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 1.52| 2.87| 4.39| 1.16| 3.14| 4.29| 6.73| 2.23| 2.91| 3.73| 0.34| 4.06| 0.31| 1.14| | 0.76| 0.60| 2.49| | 0.85| 0.64| 1.49| 28.91| | - Contractor | | 0.11| 0.11| | | | 0.36| 0.22| | | | | | | | | | | | | 0.05| 0.05| 0.74| | - Total | 1.52| 2.98| 4.50| 1.16| 3.14| 4.29| 7.10| 2.45| 2.91| 3.73| 0.34| 4.06| 0.31| 1.14| | 0.76| 0.60| 2.49| | 0.85| 0.69| 1.54| 29.65| | % Achievement | 65| 93| 81| 89| 138| 120| 136| 76| 110| 139| 24| 100| 33| 49| | 108| 85| 59| | 183| 46| 79| 94| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.03| | 0.03| | | | 0.08| | 0.00| | 0.04| 0.12| | | | | 0.60| 0.60| | 0.83| | 0.83| 1.58| | % Rehandle in Total | 2| | 1| | | | 1| | 0| | 11| 3| | | | | | 31| | 98| | 56| 6| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 2.66| 2.09| | 2.09| | | | | | | | | | | 4.75| | -Shovels | 5.12| | 5.12| | | | 13.20| 0.50| 17.17| 20.90| | 20.90| | | | | | | | | | | 56.89| | -Total | 5.12| | 5.12| | | | 13.20| 0.50| 19.83| 22.99| | 22.99| | | | | | | | | | | 61.64| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 6.50| 7.00| 13.50| 3.00| 6.13| 9.13| 10.00| 13.00| 6.00| | 5.00| 5.00| 4.00| 14.50| | 4.00| 3.75| 22.25| | 6.00| | 6.00| 88.88| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 11.62| 7.00| 18.62| 3.00| 6.13| 9.13| 23.20| 13.50| 25.83| 22.99| 5.00| 27.99| 4.00| 14.50| | 4.00| 3.75| 22.25| | 6.00| | 6.00| 150.52| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 3.76| 1.63| | 1.63| | | | | | | | | | | 5.38| | -Shovels | 3.83| 0.36| 4.19| | | | 6.98| 0.02| 8.72| 12.84| 1.69| 14.53| | | | | | | | 0.07| | 0.07| 34.51| | -Total | 3.83| 0.36| 4.19| | | | 6.98| 0.02| 12.48| 14.47| 1.69| 16.16| | | | | | | | 0.07| | 0.07| 39.89| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 10.04| 4.25| 14.30| 2.97| 1.67| 4.64| 8.49| 14.27| 2.98| | | | 2.22| 2.56| | 4.90| 3.16| 10.62| | 3.97| 3.18| 7.15| 64.67| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 13.87| 4.62| 18.49| 2.97| 1.67| 4.64| 15.47| 14.29| 15.45| 14.47| 1.69| 16.16| 2.22| 2.56| | 4.90| 3.16| 10.62| | 4.04| 3.18| 7.22| 104.56| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 141| 78| | 78| | | | | | | | | | | 113| | -Shovels | 75| | 82| | | | 53| 4| 51| 61| | 70| | | | | | | | | | | 61| | -Total | 75| | 82| | | | 53| 4| 63| 63| | 70| | | | | | | | | | | 65| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 154| 61| 106| 99| 27| 51| 85| 110| 50| | | | 56| 18| | 123| 84| 48| | 66| | 119| 73| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 119| 66| 99| 99| 27| 51| 67| 106| 60| 63| 34| 58| 56| 18| | 123| 84| 48| | 67| | 120| 69| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 0.65| 1.01| | 1.01| | | | | | | | | | | 1.66| | - Shovels | | | | | | | | | | | 5.11| 5.11| | | | | | | | | | | 5.11| | - Total | | | | | | | | | 0.65| 1.01| 5.11| 6.13| | | | | | | | | | | 6.78| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 5| 7| 302| 38| | | | | | | | | | | 17| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 72| 107| 81| 89| 138| 120| 69| 57| 67| 68| 208| 73| 33| 49| | 108| | 45| | 206| 43| 82| 71| | % Utiln. of Excav.Cap. | 106| 127| 111| 77| | 77| 79| 92| 106| 103| 87| 97| | 76| | 51| 57| 62| 0| 119| | 119| 94| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Sep-2012 ** OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | 86| 76| | 84| 72| 74| 93| 75| | 57| 78| 78| 78| 68| | | 74| 74| | | | - In O B | 93| 93| | 86| 76| | 45| 7| 55| 93| 75| | 58| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 5| | | 7| 17| | 6| 21| 38| 25| 18| | 24| 15| | 15| 25| | 78| 19| 19| | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9038| 12308| 21346| 4194| 7355| 11548| 17433| 12423| 10192| 10308| 5308| 15615| 3615| 9000| 1923| 2692| 2692| 16308| | 1788| 5692| 7481| 115962| | Actual | 4897| 9259| 14156| 4041| 12379| 16420| 24048| 9284| 11779| 12021| 1344| 13365| 1633| 4367| | 2915| | 7282| | 3447| 2600| 6046| 104014| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 19692| | 19692| | | | 44000| 1923| 76269| 88423| | 88423| | | | | | | | | | | 230308| | Actual | 12352| 1165| 13517| | | | 46533| 771| 68045| 46663| 6765| 53428| | | | | | | | | | | 182296| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 8.16| 32.70| 16.03| 15.68| 96.52| 40.37| 6.94| 12.70| 5.63| 4.80| 3.52| 4.66| 11.09| 14.81| | 13.06| | 13.75| | 19.11| 19.11| 19.11| 8.97| | Simple Formula | 7.35| 32.70| 14.90| 15.68| 96.52| 40.36| 14.63| 16.74| 7.57| 6.89| 3.52| 6.38| 11.09| 14.81| | 13.06| | 13.75| | 19.11| 19.11| 19.11| 12.54| | Excavation(Cu.M)| 23.43| 25.91| 24.17| 10.45| 64.35| 26.91| 24.92| 11.30| 37.54| 31.34| 20.06| 29.64| 7.39| 9.87| | 8.71| | 9.17| | 14.35| 12.74| 13.66| 25.99| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 890| 375| 1265| 321| 135| 456| 1894| 557| 1550| 2305| 406| 2711| 125| 335| 15| 250| 143| 743| 70| 191| 144| 335| 9706| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 8.20| 12.16| 20.36| | 0.03| 0.03| 17.07| 2.84| 4.86| 1.62| 0.29| 1.91| 0.68| 4.36| | 6.19| 2.67| 13.22| 0.21| 0.52| 0.39| 0.90| 62.09| | - Cost/Cu.M (Rs.) | 1.69| 5.35| 2.86| | 0.01| 0.01| 1.49| 1.89| 0.34| 0.10| 0.15| 0.10| 3.31| 5.76| | 12.24| | 10.47| | 0.81| 0.91| 0.85| 1.06| | - Cost/MOR/MTH (Rs.)| 920.8|3242.8|1609.2| | 22.0| 6.5| 901.4| 510.7| 313.3| 70.2| 71.4| 70.4| 547.6|1300.5| |2474.9|1870.4|1779.1| 301.1| 269.8| 270.0| 269.9| 639.7| | PLD Allowance-Rs.Lakhs | 25.90| 10.70| 36.60| 8.51| 5.03| 13.54| 49.11| 16.23| 60.96| 72.20| 12.10| 84.30| 2.02| 9.65| 0.31| 6.38| 2.79| 19.13| 0.06| 4.27| 3.22| 7.50| 289.45| | - Cost/Cu.M (Rs.) | 5.35| 4.70| 5.14| 11.01| 2.41| 4.73| 4.28| 10.80| 4.23| 4.26| 6.32| 4.47| 9.77| 12.75| | 12.63| | 15.15| | 6.70| 7.54| 7.04| 4.93| | - Cost/MOR/MTH (Rs.)|2909.7|2853.7|2893.1|2650.2|3729.6|2969.7|2592.9|2914.4|3933.1|3132.5|2979.3|3109.5|1616.7|2880.1|2057.1|2552.8|1951.5|2574.6| 83.8|2238.0|2239.4|2238.6| 2982.2| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.52| 0.49| 0.51| 0.36| | 0.10| 0.58| 0.72| 0.77| 0.57| 0.70| 0.64| | 0.60| | 0.61| | 0.71| | 1.12| | 0.67| 0.61| | b)Other Equipments | 0.37| 0.45| 0.39| 0.62| 0.00| 0.17| 0.40| 0.64| 0.36| 0.36| 0.53| 0.44| 0.11| 0.67| | 0.76| | 0.91| | 0.96| | 0.57| 0.41| | c)Total | 0.88| 0.95| 0.91| 0.97| 0.00| 0.26| 0.97| 1.36| 1.12| 0.94| 1.24| 1.07| 0.11| 1.27| | 1.37| | 1.62| | 2.08| | 1.24| 1.02| | d)Dumpers(Ltr/CuM/KM) | 0.38| 0.31| | 1.20| | | 0.34| 0.30| 0.27| 0.29| 0.27| | | 0.23| | 0.30| | | | 0.57| | | | | e)Lubricants -Ltrs | 15647| 5413| 21060| 4144| | 4144| 45353| 9331| 43133| 24924| 19030| 43954| | 3343| | 5415| 2688| 11446| 1205| 4667| | 4667| 269564| | -Ltrs/CuM| 0.03| 0.02| 0.03| 0.05| | 0.01| 0.04| 0.06| 0.04| 0.02| 0.03| 0.03| | 0.04| | 0.11| | 0.09| | 0.07| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 3.57| 3.49| 3.51| 17.38| | 17.38| 3.92| 5.22| 5.17| 4.35| 13.44| 4.61| | 3.16| | 2.35| | 2.43| | 5.59| 5.59| 5.59| 3.70| | Shovel-O B(CuM/Kg)| 2.55| 3.41| 2.61| | | | 2.22| | 2.31| 2.02| 0.89| 1.76| | | | | | | | | | | 2.06| | Dragline -O B(CuM/Kg)| | | | | | | | | 10.94| 1.40| | 1.40| | | | | | | | | | | 3.57| | b)% Cap Sensitive | 38.53| 22.39| 33.79| 19.88| | 19.88| 9.07| 7.65| 0.70| 2.70| 0.00| 2.20| | 8.72| | 17.19| 80.43| 25.61| | 93.76| 93.76| 93.76| 19.57| | c)Total Explosives(T) | 701| 291| 992| 7| | 7| 729| 558| 468| 838| 192| 1029| | 111| | 93| 49| 253| | 195| 147| 342| 4378| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Sep-2012 ** OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 201| 153| | 153| | | | | | | | | | | 180| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 71| 84| | 84| | | | | | | | | | | 77| | d)% Utilisation-SSH | | | | | | | | | 63| 69| | 69| | | | | | | | | | | 66| | -MAH | | | | | | | | | 89| 82| | 82| | | | | | | | | | | 85| | e)Down time/Hr worked | | | | | | | | | 0.47| 0.23| | 0.23| | | | | | | | | | | 0.35| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| 1| 3| | 3| | 2| | 2| 1| 5| 1| 2| | 2| 30| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 11| 11| 6| 17| | 2| | 2| 1| 5| 1| 2| | 2| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 106| 127| 111| 77| | 77| 79| 92| 89| 95| 87| 92| | 76| | 51| 57| 62| | 119| | 119| 88| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 79| 82| 80| 90| | 90| 83| 90| 78| 74| 87| 78| | 95| | 49| 71| 72| 98| 72| | 72| 80| | d)% Utilisation-SSH | 53| 53| 53| 53| | 53| 44| 56| 40| 40| 48| 43| | 45| | 26| 46| 38| 2| 50| | 50| 45| | -MAH | 67| 65| 66| 60| | 60| 54| 62| 52| 55| 55| 55| | 47| | 53| 64| 52| 2| 70| | 70| 56| | e)Down time/Hr worked | 0.40| 0.34| 0.38| 0.19| | 0.19| 0.39| 0.18| 0.55| 0.65| 0.27| 0.50| | 0.10| | 1.98| 0.63| 0.75| 1.17| 0.57| | 0.57| 0.45| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | 12| | 22| | | | | | | | | | | | | | 42| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 25| 18| 43| 11| | 11| 45| 23| 34| 28| | 28| | 10| | 10| 8| 28| 2| 15| | 15| 229| | TOTAL | 38| 18| 56| 11| | 11| 92| 23| 92| 63| 26| 89| | 10| | 10| 8| 28| 2| 15| | 15| 408| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 64| 75| 70| | 70| 73| 71| 61| 65| 88| 71| | 81| | 38| 50| 56| 99| 67| | 67| 69| | c)% Utilisation-SSH | 36| 37| 36| 27| | 27| 32| 29| 25| 37| 46| 40| | 26| | 18| 15| 20| 1| 34| | 34| 32| | -MAH | 45| 57| 48| 38| | 38| 44| 41| 41| 58| 52| 56| | 33| | 48| 29| 36| 1| 51| | 51| 46| | f)Down time/Hr worked | 0.55| 0.98| 0.69| 1.13| | 1.13| 0.84| 0.99| 1.60| 0.95| 0.27| 0.72| | 0.72| | 3.42| 3.44| 2.15| 0.78| 0.95| | 0.95| 0.99| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| 2| | 2| 15| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 63| 85| 72| 77| | 77| 59| 91| 36| 71| 67| 69| | 97| | 76| 81| 87| 93| 62| | 62| 64| | c)% Utilisation-SSH | 33| 33| 33| 21| | 21| 30| 21| 26| 39| 38| 38| | 17| | 23| 24| 20| 25| 25| | 25| 30| | -MAH | 53| 39| 46| 27| | 27| 52| 23| 71| 55| 56| 55| | 18| | 30| 30| 23| 27| 41| | 41| 47| | f)Down time/Hr worked | 1.14| 0.46| 0.87| 1.11| | 1.11| 1.35| 0.44| 2.46| 0.74| 0.88| 0.80| | 0.19| | 1.03| 0.80| 0.63| 0.27| 1.49| | 1.49| 1.17| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 20-Sep-2012 ** OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Aug 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 7| 8| | 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 2| 2| | | | | | | | | | | 3| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| | 2| | 1| | 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 12| 11| 7| 18| | 2| | 1| | 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 23.87| 28.01| 25.22| 0.00| | 0.00| 27.89| 21.68| 22.14| 23.26| 31.62| 27.82| | 23.64| | 33.04| | 27.67| | 31.65| | 31.65| 25.97| | c)% Availability | 79| 83| 81| 71| | 71| 83| 96| 90| 76| 74| 75| | 88| | 59| | 78| | 75| | 75| 82| | d)% Utilisation-SSH | 34| 18| 26| 6| | 6| 19| 12| 21| 18| 33| 24| | 9| | 12| | 10| | 10| | 10| 21| | -MAH | 42| 21| 32| 9| | 9| 23| 13| 23| 24| 45| 32| | 10| | 21| | 13| | 14| | 14| 25| | e)Down time/Hr worked | 0.61| 0.96| 0.72| 4.84| | 4.84| 0.91| 0.32| 0.46| 1.33| 0.79| 1.03| | 1.37| | 3.34| | 2.22| | 2.40| | 2.40| 0.88| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 7| 2| 3| | 3| 3| | 1| | | 1| 2| | 2| | 2| 22| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| | 2| | 1| 1| 4| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 3| | 3| 11| 3| 7| 7| 4| 11| | 1| | 2| 2| 5| 1| 2| | 2| 49| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 6| 1| 7| 30| 9| 16| 14| 17| 31| 1| 5| | 4| 5| 14| 3| 7| | 7| 133| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 84| 77| 81| 66| 85| 69| 78| 64| 71| 64| 72| 69| 40| 73| | 69| 50| 66| 93| 76| | 76| 72| | c)% Utilisation-SSH | 23| 25| 23| 19| 6| 17| 27| 17| 23| 28| 14| 20| 20| 22| | 11| 22| 19| 1| 31| | 31| 22| | -MAH | 27| 32| 29| 29| 7| 24| 35| 27| 32| 44| 19| 29| 50| 30| | 15| 44| 28| 2| 41| | 41| 30| | d)Down time/Hr worked | 0.73| 0.94| 0.80| 1.81| 2.36| 1.84| 0.80| 2.14| 1.25| 1.30| 1.96| 1.57| 3.03| 1.22| | 2.97| 2.24| 1.86| 4.57| 0.76| | 0.76| 1.29| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 61| 32| 93| 22| 1| 23| 164| 41| 145| 112| 64| 176| 1| 22| | 19| 15| 56| 7| 28| | 28| 734| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 79| 72| 77| 71| 85| 72| 74| 74| 63| 67| 79| 72| 40| 83| | 51| 54| 65| 95| 69| | 69| 71| | c)% Utilisation-SSH | 35| 34| 35| 26| 6| 25| 32| 27| 26| 35| 35| 35| 20| 24| | 18| 20| 21| 5| 33| | 33| 31| | -MAH | 45| 48| 46| 36| 7| 35| 43| 37| 41| 52| 44| 49| 50| 29| | 35| 37| 32| 5| 48| | 48| 43| | d)Down time/Hr worked | 0.59| 0.83| 0.67| 1.10| 2.36| 1.12| 0.82| 0.95| 1.42| 0.93| 0.59| 0.80| 3.03| 0.70| | 2.81| 2.27| 1.69| 0.93| 0.92| | 0.92| 0.93| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | 4.41| 2.64| | 2.64| | | | | | | | | | | 7.05| |b)Shovels(LCu.M)-Cap. | 4.60| 1.66| 6.26| 1.00| | 1.00| 14.58| 1.60| 12.00| 11.00| 8.10| 19.10| | 1.00| | 1.00| 0.69| 2.69| 0.50| 1.00| | 1.00| 58.73| | -OB | 3.82| 0.36| 4.18| | | | 6.96| 0.02| 8.70| 7.97| 6.81| 14.78| | | | | | | | 0.07| | 0.07| 34.71| | -Coal(LT) | 1.55| 2.62| 4.16| 1.16| | 1.16| 6.82| 2.17| 2.91| 3.73| 0.37| 4.10| | 1.14| | 0.76| 0.60| 2.49| | 1.68| | 1.68| 25.49| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No MED OC GK. OC 35T Dumper H.M. 00205 MED OC GK. OC 35T Dumper H.M. 00251 DOR OC2 DOR OC1 35T Dumper H.M. A0307 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Aug-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.35| 2.80| 5.15| 1.26| 1.90| 3.16| 5.09| 3.34| 2.65| 2.70| 1.43| 4.13| 0.94| 2.34| | 0.62| 0.62| 3.58| | 0.47| 1.48| 1.95| 29.99| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.35| 2.80| 5.15| 1.26| 1.90| 3.16| 5.09| 3.34| 2.65| 2.70| 1.43| 4.13| 0.94| 2.34| | 0.62| 0.62| 3.58| | 0.47| 1.48| 1.95| 29.99| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.01| 3.35| 5.36| 0.89| 3.04| 3.93| 5.90| 1.82| 2.28| 3.18| 0.52| 3.71| 0.34| 1.06| | 0.55| 0.32| 1.93| | 1.04| 0.71| 1.76| 27.03| | - Contractor | | 0.03| 0.03| | | | 0.52| 0.51| | | | | | | | | | | | | | | 1.07| | - Total | 2.01| 3.38| 5.39| 0.89| 3.04| 3.93| 6.42| 2.33| 2.28| 3.18| 0.52| 3.71| 0.34| 1.06| | 0.55| 0.32| 1.93| | 1.04| 0.72| 1.76| 28.10| | % Achievement | 86| 121| 105| 71| 160| 124| 126| 70| 86| 118| 37| 90| 37| 45| | 89| 51| 54| | 224| 48| 91| 94| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.10| | 0.10| | | | 0.22| | | | 0.22| 0.45| | | | | 0.27| 0.27| | 0.71| | 0.71| 1.52| | % Rehandle in Total | 5| | 2| | | | 4| | | | 43| 12| | | | | | 17| | 68| | 41| 6| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 2.66| 2.09| | 2.09| | | | | | | | | | | 4.75| | -Shovels | 5.12| | 5.12| | | | 13.20| 1.00| 17.96| 20.90| | 20.90| | | | | | | | | | | 58.18| | -Total | 5.12| | 5.12| | | | 13.20| 1.00| 20.62| 22.99| | 22.99| | | | | | | | | | | 62.93| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 6.50| 7.00| 13.50| 3.00| 6.13| 9.13| 12.00| 13.00| 6.50| | 5.00| 5.00| 4.00| 14.00| | 4.00| 3.70| 21.70| | 6.00| | 6.00| 90.83| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 11.62| 7.00| 18.62| 3.00| 6.13| 9.13| 25.20| 14.00| 27.12| 22.99| 5.00| 27.99| 4.00| 14.00| | 4.00| 3.70| 21.70| | 6.00| | 6.00| 153.76| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 3.40| 1.68| | 1.68| | | | | | | | | | | 5.08| | -Shovels | 2.78| 0.29| 3.07| | | | 5.87| 0.02| 8.63| 11.05| 1.49| 12.53| | | | | | | | | | | 30.13| | -Total | 2.78| 0.29| 3.07| | | | 5.87| 0.02| 12.03| 12.73| 1.49| 14.21| | | | | | | | | | | 35.21| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 10.69| 4.21| 14.90| 2.35| 0.74| 3.10| | 10.10| 2.87| | | | 1.85| 2.21| | 4.73| 3.27| 10.21| | 1.81| 3.60| 5.41| 48.44| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 13.47| 4.50| 17.97| 2.35| 0.74| 3.10| 5.87| 10.12| 14.90| 12.73| 1.49| 14.21| 1.85| 2.21| | 4.73| 3.27| 10.21| | 1.81| 3.60| 5.41| 83.65| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 128| 80| | 80| | | | | | | | | | | 107| | -Shovels | 54| | 60| | | | 44| 2| 48| 53| | 60| | | | | | | | | | | 52| | -Total | 54| | 60| | | | 44| 2| 58| 55| | 62| | | | | | | | | | | 56| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 165| 60| 110| 78| 12| 34| | 78| 44| | | | 46| 16| | 118| 88| 47| | 30| | 90| 53| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 116| 64| 97| 78| 12| 34| 23| 72| 55| 55| 30| 51| 46| 16| | 118| 88| 47| | 30| | 90| 54| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 1.35| 1.05| | 1.05| | | | | | | | | | | 2.40| | - Shovels | | | | | | | 0.21| | 0.74| | 4.46| 4.46| | | | | | | | | | | 5.41| | - Total | | | | | | | 0.21| | 2.09| 1.05| 4.46| 5.52| | | | | | | | | | | 7.81| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | 4| | 17| 8| 301| 39| | | | | | | | | | | 22| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 62| 135| 78| 71| 160| 124| 59| 38| 61| 60| 192| 65| 37| 45| | 89| | 45| | 224| 48| 90| 64| | % Utiln. of Excav.Cap. | 97| 128| 106| 60| | 60| 70| 79| 110| 91| 80| 86| | 71| | 37| 27| 47| 0| 117| | 117| 87| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Aug-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | 79| 75| | 83| 65| 57| 73| 80| | 63| 75| 78| 72| 65| | | 93| 93| | | | - In O B | 93| 93| | 79| | | 48| 9| 50| 73| 80| | 63| | | | | | 40| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | 10| | | 14| 18| | 10| 28| 43| 20| 13| | 24| 18| | 21| 28| | 38| 19| 19| | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9038| 10769| 19808| 4065| 6129| 10194| 16419| 12846| 10192| 10385| 5500| 15885| 3615| 9000| | 2385| 2385| 13769| | 1788| 5692| 7481| 110209| | Actual | 6485| 10821| 17305| 3395| 12148| 15543| 21322| 8406| 11994| 13086| 1962| 15048| 1641| 4251| | 2311| | 6562| | 3366| 2298| 5663| 103485| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 19692| | 19692| | | | 42581| 3846| 79308| 88423| | 88423| | | | | | | | | | | 233850| | Actual | 8965| 942| 9906| | | | 36697| 668| 72180| 52305| 5569| 57874| | | | | | | | | | | 177325| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 6.92| 37.64| 14.13| 11.66| 92.59| 35.91| 5.94| 10.39| 5.22| 4.20| 5.07| 4.31| 13.03| 14.01| | 9.93| | 11.96| | 21.54| 21.17| 21.39| 8.35| | Simple Formula | 9.61| 37.64| 17.99| 11.66| 92.59| 35.91| 12.84| 13.64| 5.86| 5.88| 5.07| 5.75| 13.03| 14.01| | 9.93| | 11.96| | 21.54| 21.17| 21.39| 11.73| | Excavation(Cu.M)| 19.70| 28.37| 22.29| 7.77| 61.73| 23.94| 21.33| 9.25| 34.84| 27.44| 17.78| 25.89| 8.68| 9.34| | 6.62| | 7.97| | 14.36| 14.11| 14.26| 23.28| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 908| 365| 1273| 324| 137| 461| 1868| 562| 1554| 2270| 437| 2707| 116| 338| 17| 245| 130| 730| 69| 197| 135| 332| 9672| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 5.21| 12.58| 17.79| | 0.35| 0.35| 10.98| 1.38| 5.55| 2.53| 0.21| 2.74| 0.55| 4.30| | 6.15| 1.64| 12.08| 0.44| 0.31| 0.12| 0.43| 52.30| | - Cost/Cu.M (Rs.) | 1.26| 4.98| 2.68| | 0.17| 0.13| 1.12| 1.12| 0.41| 0.17| 0.12| 0.16| 2.40| 6.07| | 16.62| | 11.21| | 0.45| 0.25| 0.36| 0.99| | - Cost/MOR/MTH (Rs.)| 573.6|3446.5|1397.3| | 252.2| 75.0| 588.1| 245.2| 357.2| 111.4| 48.8| 101.3| 476.2|1272.4| |2508.4|1258.4|1655.1| 644.5| 157.3| 86.5| 128.5| 540.7| | PLD Allowance-Rs.Lakhs | 29.56| 13.03| 42.59| 6.64| 3.72| 10.36| 61.20| 19.29| 75.26| 89.24| 16.40|105.64| 2.55| 11.89| 0.39| 7.44| 3.69| 23.40| 0.69| 6.28| 4.36| 10.64| 351.61| | - Cost/Cu.M (Rs.) | 7.18| 5.15| 6.41| 11.15| 1.84| 3.95| 6.24| 15.63| 5.55| 6.01| 8.94| 6.33| 11.10| 16.78| | 20.11| | 21.71| | 9.02| 9.18| 9.09| 6.63| | - Cost/MOR/MTH (Rs.)|3255.2|3569.8|3345.4|2050.9|2713.9|2247.9|3276.5|3431.7|4842.7|3931.2|3753.3|3902.4|2198.8|3517.5|2273.7|3034.8|2840.7|3206.0|1000.7|3185.4|3230.2|3203.7| 3635.4| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.53| 0.39| 0.48| 0.37| | 0.08| 0.55| 0.75| 0.70| 0.58| 0.62| 0.61| | 0.60| | 0.74| | 0.74| | 0.92| | 0.54| 0.57| | b)Other Equipments | 0.40| 0.40| 0.40| 0.72| 0.00| 0.17| 0.46| 0.75| 0.34| 0.39| 0.53| 0.46| 0.17| 0.66| | 1.08| | 1.07| | 0.96| | 0.57| 0.43| | c)Total | 0.94| 0.79| 0.88| 1.09| 0.00| 0.25| 1.01| 1.49| 1.04| 0.97| 1.15| 1.06| 0.17| 1.26| | 1.82| | 1.80| | 1.87| | 1.11| 1.00| | d)Dumpers(Ltr/CuM/KM) | 0.35| 0.29| | 0.94| | | 0.37| 0.29| 0.30| 0.29| 0.27| | | 0.23| | 0.40| | | | 0.43| | | | | e)Lubricants -Ltrs | 15150| 4781| 19931| 6216| | 6216| 44850| 7164| 47425| 20187| 26110| 46297| | 4330| | 6379| 2810| 13519| 1313| 5850| | 5850| 284378| | -Ltrs/CuM| 0.04| 0.02| 0.03| 0.10| | 0.02| 0.05| 0.06| 0.05| 0.02| 0.04| 0.03| | 0.06| | 0.17| | 0.13| | 0.08| | 0.05| 0.06| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 5.61| 6.14| 5.93| 6.90| | 6.90| 2.88| 7.22| 6.07| 5.11| 4.76| 5.05| | 2.86| | 2.84| | 2.69| | 6.18| 6.08| 6.14| 3.87| | Shovel-O B(CuM/Kg)| 1.91| 3.10| 1.99| | | | 1.37| 0.46| 2.03| 1.68| 1.16| 1.59| | | | | | | | | | | 1.67| | Dragline -O B(CuM/Kg)| | | | | | | | | 1.44| 0.92| | 0.92| | | | | | | | | | | 1.21| | b)% Cap Sensitive | 52.92| 24.08| 44.50| 20.08| | 20.08| 2.25| 6.34| 0.18| 2.66| 0.00| 2.30| | 30.23| | 19.83| 97.52| 38.01| | 92.38| 92.38| 92.38| 18.85| | c)Total Explosives(T) | 674| 278| 952| 13| | 13| 872| 468| 699| 905| 139| 1044| | 78| | 99| 40| 217| | 177| 123| 300| 4565| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Aug-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 217| 158| | 158| | | | | | | | | | | 191| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 79| 89| | 89| | | | | | | | | | | 84| | d)% Utilisation-SSH | | | | | | | | | 72| 74| | 74| | | | | | | | | | | 73| | -MAH | | | | | | | | | 91| 83| | 83| | | | | | | | | | | 87| | e)Down time/Hr worked | | | | | | | | | 0.29| 0.15| | 0.15| | | | | | | | | | | 0.22| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| 1| 3| | 3| | 2| | 2| 1| 5| 1| 2| | 2| 30| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 11| 11| 6| 17| | 2| | 2| 1| 5| 1| 2| | 2| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 97| 128| 106| 60| | 60| 70| 79| 91| 80| 80| 80| | 71| | 37| 27| 47| | 117| | 117| 80| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 88| 81| 86| 89| | 89| 85| 92| 77| 71| 92| 79| | 90| | 65| 41| 69| 90| 81| | 81| 81| | d)% Utilisation-SSH | 51| 57| 53| 58| | 58| 42| 48| 36| 34| 44| 38| | 38| | 36| 32| 36| 9| 58| | 58| 42| | -MAH | 58| 71| 62| 65| | 65| 50| 53| 47| 48| 47| 48| | 42| | 56| 78| 52| 10| 72| | 72| 52| | e)Down time/Hr worked | 0.23| 0.33| 0.27| 0.20| | 0.20| 0.35| 0.18| 0.63| 0.84| 0.19| 0.56| | 0.25| | 0.98| 1.88| 0.87| 1.12| 0.33| | 0.33| 0.44| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | 12| | 22| | | | | | | | | | | | | | 42| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 23| 18| 41| 11| | 11| 45| 25| 34| 28| | 28| | 10| | 9| 9| 28| 2| 15| | 15| 229| | TOTAL | 36| 18| 54| 11| | 11| 92| 25| 92| 63| 26| 89| | 10| | 9| 9| 28| 2| 15| | 15| 408| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 82| 69| 78| 67| | 67| 75| 75| 70| 59| 85| 67| | 89| | 40| 49| 62| 95| 56| | 56| 71| | c)% Utilisation-SSH | 32| 37| 34| 21| | 21| 29| 23| 25| 30| 40| 33| | 22| | 20| 11| 18| 7| 31| | 31| 28| | -MAH | 39| 54| 43| 32| | 32| 39| 30| 36| 51| 46| 49| | 24| | 51| 22| 30| 8| 56| | 56| 40| | f)Down time/Hr worked | 0.56| 0.83| 0.65| 1.57| | 1.57| 0.86| 1.08| 1.20| 1.36| 0.37| 1.00| | 0.53| | 2.96| 4.74| 2.09| 0.63| 1.42| | 1.42| 1.03| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| 2| | 2| 15| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 67| 91| 77| 59| | 59| 63| 84| 53| 73| 71| 72| | 97| | 65| 91| 85| 90| 59| | 59| 68| | c)% Utilisation-SSH | 31| 29| 30| 18| | 18| 31| 18| 21| 37| 35| 36| | 18| | 27| 40| 25| 16| 24| | 24| 29| | -MAH | 47| 32| 40| 30| | 30| 50| 21| 40| 51| 50| 50| | 19| | 43| 44| 29| 18| 41| | 41| 42| | f)Down time/Hr worked | 1.06| 0.30| 0.76| 2.36| | 2.36| 1.20| 0.91| 2.25| 0.73| 0.81| 0.77| | 0.18| | 1.29| 0.21| 0.62| 0.61| 1.69| | 1.69| 1.11| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Aug-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jul 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 7| 8| | 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 2| 2| | | | | | | | | | | 3| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| | 2| | 1| | 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 12| 11| 7| 18| | 2| | 1| | 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 20.92| 20.34| 20.73| 0.00| | 0.00| 30.12| 19.26| 27.40| 23.65| 31.46| 27.66| | 15.48| | 31.69| | 19.19| | 23.87| | 23.87| 26.36| | c)% Availability | 82| 64| 73| 75| | 75| 86| 87| 83| 77| 68| 73| | 95| | 44| | 77| | 79| | 79| 79| | d)% Utilisation-SSH | 34| 18| 26| 12| | 12| 21| 11| 21| 19| 31| 24| | 17| | 10| | 15| | 19| | 19| 22| | -MAH | 42| 28| 36| 16| | 16| 25| 12| 26| 25| 46| 33| | 18| | 22| | 19| | 24| | 24| 28| | e)Down time/Hr worked | 0.54| 2.00| 1.02| 2.04| | 2.04| 0.67| 1.20| 0.77| 1.20| 1.02| 1.11| | 0.28| | 5.92| | 1.57| | 1.11| | 1.11| 0.96| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 7| 2| 3| | 3| 3| | 1| | | 1| 2| | 2| | 2| 22| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| | 2| | 1| 1| 4| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 3| | 3| 11| 3| 7| 7| 4| 11| | 1| | 2| 2| 5| 1| 2| | 2| 49| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 6| 1| 7| 30| 9| 16| 14| 17| 31| 1| 5| | 4| 5| 14| 3| 7| | 7| 133| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 72| 81| 75| 65| 83| 68| 80| 80| 69| 68| 77| 73| 69| 64| | 72| 66| 67| 96| 78| | 78| 74| | c)% Utilisation-SSH | 20| 23| 21| 16| 6| 14| 27| 22| 25| 27| 16| 21| 33| 12| | 9| 26| 16| 11| 29| | 29| 21| | -MAH | 28| 28| 28| 24| 8| 21| 34| 28| 36| 39| 21| 29| 48| 19| | 13| 40| 24| 11| 37| | 37| 29| | d)Down time/Hr worked | 1.40| 0.82| 1.19| 2.22| 2.62| 2.25| 0.76| 0.90| 1.27| 1.19| 1.42| 1.29| 0.93| 2.87| | 2.99| 1.31| 2.05| 0.40| 0.75| | 0.75| 1.22| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 59| 32| 91| 22| 1| 23| 164| 43| 145| 112| 64| 176| 1| 22| | 18| 16| 56| 7| 28| | 28| 734| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 74| 78| 68| 83| 69| 76| 79| 70| 65| 80| 71| 69| 85| | 53| 56| 67| 94| 65| | 65| 72| | c)% Utilisation-SSH | 32| 35| 33| 22| 6| 22| 30| 24| 26| 30| 33| 31| 33| 20| | 20| 19| 20| 10| 31| | 31| 28| | -MAH | 40| 47| 42| 33| 8| 32| 39| 30| 36| 46| 41| 44| 48| 24| | 38| 35| 30| 11| 49| | 49| 39| | d)Down time/Hr worked | 0.62| 0.75| 0.67| 1.42| 2.62| 1.44| 0.80| 0.90| 1.17| 1.16| 0.61| 0.95| 0.93| 0.71| | 2.39| 2.25| 1.65| 0.59| 1.12| | 1.12| 0.97| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | 4.75| 2.73| | 2.73| | | | | | | | | | | 7.48| |b)Shovels(LCu.M)-Cap. | 4.32| 1.88| 6.21| 1.00| | 1.00| 14.55| 1.54| 12.00| 11.00| 8.10| 19.10| | 1.00| | 1.00| 0.67| 2.67| 0.50| 1.00| | 1.00| 58.57| | -OB | 2.78| 0.29| 3.07| | | | 6.08| 0.02| 9.37| 6.70| 5.95| 12.64| | | | | | | | | | | 31.17| | -Coal(LT) | 2.11| 3.17| 5.27| 0.89| | 0.89| 6.12| 1.81| 2.27| 3.18| 0.75| 3.93| | 1.06| | 0.55| 0.27| 1.89| | 1.75| | 1.75| 23.94| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No GK OC JVR OC 35T Dumper BEML 10093 GK OC JVR OC 35T Dumper BEML 10094 KRG OC DOR OC2 35T Dumper CPIL 00312 KRG OC DOR OC2 35T Dumper CPIL 00313 RK. OC SRP OC1 35T Dumper H.M. 00764 KRG OC DOR OC2 Water Tanker Hindustan 00261 B)List of Surveyed Off HEMM during the month: Mine Eqpt Make Mnfg Sl.No PK OC 85T Dumper BEML 01214 JK5OC 35T Dumper BEML 09763 RG OC3 85T Dumper H.M. 8JL52 RG OC1 35T Dumper BEML 11115 RG OC1 35T Dumper BEML 11118 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jul-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.50| 2.60| 5.10| 1.00| 1.50| 2.50| 5.82| 3.39| 3.42| 2.72| 1.20| 3.92| 1.00| 2.50| | 0.60| 0.60| 3.70| | 0.50| 1.60| 2.10| 30.95| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.50| 2.60| 5.10| 1.00| 1.50| 2.50| 5.82| 3.39| 3.42| 2.72| 1.20| 3.92| 1.00| 2.50| | 0.60| 0.60| 3.70| | 0.50| 1.60| 2.10| 30.95| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.50| 3.56| 6.06| 0.92| 2.26| 3.18| 6.76| 3.19| 2.36| 3.85| 0.71| 4.56| 0.37| 1.67| | 1.09| 1.09| 3.85| | 0.66| 1.33| 1.99| 32.32| | - Contractor | | 0.05| 0.05| | | | 0.83| | | | | | | | | | | | | | 0.06| 0.06| 0.94| | - Total | 2.50| 3.61| 6.11| 0.92| 2.26| 3.18| 7.60| 3.19| 2.36| 3.85| 0.71| 4.56| 0.37| 1.67| | 1.09| 1.09| 3.85| | 0.66| 1.39| 2.05| 33.26| | % Achievement | 100| 139| 120| 92| 150| 127| 131| 94| 69| 141| 59| 116| 37| 67| | 181| 182| 104| | 132| 87| 98| 107| | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.02| | 0.02| | | | 0.41| | | | 0.13| 0.54| | | | | 0.94| 0.94| | 1.30| | 1.30| 2.79| | % Rehandle in Total | 1| | 0| | | | 6| | | | 18| 12| | | | | | 34| | 197| | 65| 9| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | 3.69| 2.90| | 2.90| | | | | | | | | | | 6.59| | -Shovels | 5.80| | 5.80| | | | 19.40| 1.00| 18.21| 27.50| | 27.50| | | | | | | | | | | 71.91| | -Total | 5.80| | 5.80| | | | 19.40| 1.00| 21.90| 30.40| | 30.40| | | | | | | | | | | 78.50| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 9.00| 8.00| 17.00| 5.50| 6.94| 12.44| 25.00| 21.00| 9.04| | 10.00| 10.00| 8.00| 14.50| | 8.00| 7.85| 30.35| | 8.00| | 8.00| 140.83| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 14.80| 8.00| 22.80| 5.50| 6.94| 12.44| 44.40| 22.00| 30.94| 30.40| 10.00| 40.40| 8.00| 14.50| | 8.00| 7.85| 30.35| | 8.00| | 8.00| 219.33| | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | 1.41| 0.91| | 0.91| | | | | | | | | | | 2.33| | -Shovels | 3.67| 0.21| 3.87| 0.02| | 0.02| 10.79| 0.12| 11.10| 15.27| 1.76| 17.03| | | | | | | | | | | 42.94| | -Total | 3.67| 0.21| 3.87| 0.02| | 0.02| 10.79| 0.12| 12.51| 16.18| 1.76| 17.95| | | | | | | | | | | 45.26| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 13.07| 4.95| 18.02| 4.64| | 4.64| 17.91| 19.91| 4.77| | | | 7.24| 7.57| | 11.67| 10.11| 29.34| | 2.84| 4.84| 7.68| 109.52| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 16.73| 5.16| 21.89| 4.66| | 4.66| 28.70| 20.04| 17.29| 16.18| 1.76| 17.95| 7.24| 7.57| | 11.67| 10.11| 29.34| | 2.84| 4.84| 7.68| 154.79| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | 38| 31| | 31| | | | | | | | | | | 35| | -Shovels | 63| | 67| | | | 56| 12| 61| 56| | 62| | | | | | | | | | | 60| | -Total | 63| | 67| | | | 56| 12| 57| 53| | 59| | | | | | | | | | | 58| | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 145| 62| 106| 84| | 37| 72| 95| 53| | | | 90| 52| | 146| 129| 97| | 36| | 96| 78| | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 113| 64| 96| 85| | 37| 65| 91| 56| 53| 18| 44| 90| 52| | 146| 129| 97| | 36| | 96| 71| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | 1.47| 0.84| | 0.84| | | | | | | | | | | 2.31| | - Shovels | | | | | | | | | 0.40| | 5.54| 5.54| | | | 0.20| | 0.20| | | | | 6.13| | - Total | | | | | | | | | 1.86| 0.84| 5.54| 6.38| | | | 0.20| | 0.20| | | | | 8.44| | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | 15| 5| 314| 36| | | | | | | | | | | 19| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 71| 149| 86| 95| 150| 128| 66| 69| 58| 58| 280| 64| 37| 67| | 181| | 74| | 132| 83| 95| 67| | % Utiln. of Excav.Cap. | 118| 123| 120| 64| | 64| 106| 126| 112| 112| 97| 106| | 111| | 83| 65| 87| 0| 130| | 130| 107| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jul-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 90| | 90| 82| | 83| 90| 75| 90| 90| | 66| 90| 78| 90| 90| | | 81| 81| | | | - In O B | 90| 90| | 90| | | 83| 36| 75| 90| 90| | 87| | | | | | 78| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | 5| | 7| | 15| | | | | | | | | | | 9| 9| | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | 3| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9615| 10000| 19615| 3333| 5000| 8333| 19400| 13038| 13154| 10462| 4615| 15077| 3846| 9615| | 2308| 2308| 14231| | 1923| 6154| 8077| 114772| | Actual | 8334| 11857| 20191| 3082| 8257| 11339| 24447| 10618| 9426| 12828| 2374| 15203| 1678| 5559| | 3622| | 9181| | 2437| 4929| 7366| 109449| | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 22308| | 22308| | | | 64667| 3846| 84231|116923| |116923| | | | | | | | | | | 291974| | Actual | 12222| 685| 12907| 64| | 64| 39000| 1015| 50059| 53948| 5871| 59820| | | | | | | | | | | 162865| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 9.30| 41.05| 17.04| 13.20| 73.61| 31.59| 9.76| 20.19| 5.81| 5.62| 7.42| 5.84| 15.03| 22.58| | 21.42| | 21.50| | 25.80| 25.70| 25.73| 11.46| | Simple Formula | 12.43| 41.05| 21.05| 13.20| 73.61| 31.59| 15.62| 25.55| 6.48| 7.54| 7.41| 7.52| 15.03| 22.58| | 21.42| | 21.50| | 25.80| 25.70| 25.73| 14.54| | Excavation(Cu.M)| 26.52| 29.74| 27.49| 9.07| 49.08| 21.25| 35.33| 18.01| 38.74| 36.71| 23.26| 34.58| 10.02| 15.05| | 14.28| | 14.33| | 17.20| 17.14| 17.16| 30.78| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 915| 364| 1279| 325| 136| 461| 1860| 568| 1556| 2294| 429| 2723| 114| 338| 18| 242| 109| 707| 69| 98| 229| 327| 9664| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 7.74| 18.64| 26.38| 0.02| 0.12| 0.14| 16.17| 1.48| 6.39| 4.77| 0.35| 5.12| 0.54| 7.26| | 7.24| 2.39| 16.89| 0.02| 0.14| 0.59| 0.73| 73.85| | - Cost/Cu.M (Rs.) | 1.45| 7.23| 3.33| 0.03| 0.08| 0.07| 1.06| 0.66| 0.45| 0.25| 0.16| 0.24| 2.17| 6.53| | 9.99| | 9.20| | 0.33| 0.66| 0.55| 1.12| | - Cost/MOR/MTH (Rs.)| 845.7|5121.0|2062.5| 6.1| 90.5| 31.0| 869.4| 260.3| 410.7| 207.8| 81.1| 187.8| 469.4|2148.0| |2989.7|2194.4|2388.6| 32.2| 146.3| 257.3| 224.0| 764.2| | PLD Allowance-Rs.Lakhs | 26.63| 10.49| 37.12| 8.78| 4.48| 13.26| 58.52| 16.76| 59.95| 73.70| 13.74| 87.44| 2.49| 9.44| 0.31| 5.47| 2.77| 17.98| 0.29| 2.49| 5.81| 8.30| 302.10| | - Cost/Cu.M (Rs.) | 4.99| 4.07| 4.69| 13.81| 2.98| 6.19| 3.82| 7.46| 4.26| 3.93| 6.15| 4.17| 10.11| 8.49| | 7.55| | 9.79| | 5.67| 6.55| 6.26| 4.57| | - Cost/MOR/MTH (Rs.)|2910.9|2881.2|2902.4|2700.3|3293.9|2875.4|3146.0|2950.5|3852.7|3212.6|3203.3|3211.1|2182.7|2791.9|1710.4|2261.0|2537.1|2543.4| 420.4|2540.0|2536.3|2537.4| 3126.0| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.49| 0.35| 0.45| 0.41| | 0.12| 0.48| 0.56| 0.75| 0.52| 0.62| 0.57| | 0.60| | 0.54| | 0.59| | 1.68| | 0.55| 0.55| | b)Other Equipments | 0.36| 0.42| 0.38| 0.66| | 0.19| 0.32| 0.53| 0.31| 0.33| 0.50| 0.40| 0.14| 0.63| | 0.75| | 0.83| | 1.67| | 0.55| 0.38| | c)Total | 0.86| 0.77| 0.83| 1.07| | 0.32| 0.80| 1.09| 1.06| 0.85| 1.13| 0.97| 0.14| 1.23| | 1.29| | 1.42| | 3.34| | 1.11| 0.93| | d)Dumpers(Ltr/CuM/KM) | 0.31| 0.27| | 0.68| | | 0.36| 0.27| 0.23| 0.19| 0.87| | | 0.24| | 0.33| | | | 0.87| | | | | e)Lubricants -Ltrs | 11056| 5143| 16199| 6062| | 6062| 46858| 9305| 49884| 26862| 20755| 47617| | 6887| | 6887| 7120| 20894| 1985| 4771| | 4771| 299118| | -Ltrs/CuM| 0.02| 0.02| 0.02| 0.10| | 0.03| 0.03| 0.04| 0.04| 0.02| 0.03| 0.02| | 0.06| | 0.10| | 0.11| | 0.11| | 0.04| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 7.33| 6.39| 6.75| 9.99| | 9.99| 3.77| 8.07| 8.19| 3.38| 14.25| 3.84| | 1.12| | 3.02| | 1.49| | 6.83| 5.92| 6.20| 3.92| | Shovel-O B(CuM/Kg)| 2.07| 3.83| 2.12| | | | 2.21| 24.36| 2.04| 1.80| 1.45| 1.76| | | | | | | | | | | 1.97| | Dragline -O B(CuM/Kg)| | | | | | | | | 0.50| 1.60| | 1.60| | | | | | | | | | | 0.69| | b)% Cap Sensitive | 47.95| 24.96| 40.95| 20.00| | 20.00| 14.31| 6.17| 0.18| 2.92| 0.79| 2.69| | 10.20| | 2.53| 0.00| 6.09| | 23.63| 23.63| 23.63| 13.05| | c)Total Explosives(T) | 756| 331| 1087| 9| | 9| 1147| 685| 852| 1018| 127| 1145| | 344| | 215| 107| 665| | 10| 24| 34| 5624| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jul-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | 132| 102| | 102| | | | | | | | | | | 118| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | 77| 75| | 75| | | | | | | | | | | 76| | d)% Utilisation-SSH | | | | | | | | | 57| 51| | 51| | | | | | | | | | | 54| | -MAH | | | | | | | | | 75| 67| | 67| | | | | | | | | | | 71| | e)Down time/Hr worked | | | | | | | | | 0.41| 0.49| | 0.49| | | | | | | | | | | 0.45| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| 2| | 2| 6| 3| 1| 3| | 3| | 2| | 2| 1| 5| 1| 2| | 2| 30| | TOTAL | 6| 3| 9| 2| | 2| 15| 3| 11| 11| 6| 17| | 2| | 2| 1| 5| 1| 2| | 2| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 118| 123| 120| 64| | 64| 106| 126| 109| 113| 97| 106| | 111| | 83| 65| 87| | 130| | 130| 107| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 90| 94| 91| 88| | 88| 80| 94| 83| 81| 86| 82| | 95| | 64| 43| 71| 62| 87| | 87| 83| | d)% Utilisation-SSH | 61| 63| 61| 54| | 54| 47| 64| 47| 47| 57| 50| | 62| | 44| 43| 50| 15| 68| | 68| 52| | -MAH | 67| 67| 67| 61| | 61| 59| 68| 57| 58| 66| 61| | 66| | 68| 100| 71| 24| 77| | 77| 62| | e)Down time/Hr worked | 0.17| 0.10| 0.14| 0.22| | 0.22| 0.43| 0.09| 0.36| 0.41| 0.25| 0.35| | 0.08| | 0.81| 1.35| 0.57| 2.60| 0.19| | 0.19| 0.33| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | 13| | 23| | | | | | | | | | | | | | 44| | 60 T | 5| | 5| | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 25| 16| 41| 12| | 12| 45| 25| 34| 30| | 30| | 12| | 9| 7| 28| 3| 14| | 14| 232| | TOTAL | 38| 16| 54| 12| | 12| 93| 25| 93| 65| 26| 91| | 12| | 9| 7| 28| 3| 14| | 14| 413| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 77| 72| 75| 54| | 54| 70| 77| 59| 54| 75| 60| | 90| | 47| 26| 61| 82| 56| | 56| 65| | c)% Utilisation-SSH | 38| 38| 38| 23| | 23| 36| 34| 30| 39| 51| 42| | 33| | 30| 4| 26| 11| 37| | 37| 35| | -MAH | 50| 53| 51| 42| | 42| 51| 45| 51| 72| 67| 70| | 37| | 64| 17| 42| 14| 66| | 66| 54| | f)Down time/Hr worked | 0.61| 0.75| 0.65| 2.05| | 2.05| 0.83| 0.66| 1.37| 1.18| 0.49| 0.94| | 0.31| | 1.75| 16.97| 1.50| 1.56| 1.20| | 1.20| 1.00| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| 2| | 2| 10| 4| 3| 1| 2| 3| | 3| | 2| 1| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| 2| | 2| 15| 4| 13| 12| 8| 20| | 3| | 2| 1| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 67| 82| 73| 58| | 58| 57| 75| 57| 71| 72| 71| | 97| | 55| 84| 81| 90| 68| | 68| 67| | c)% Utilisation-SSH | 33| 25| 30| 20| | 20| 33| 24| 21| 40| 38| 39| | 21| | 20| 46| 24| 34| 27| | 27| 30| | -MAH | 49| 31| 41| 35| | 35| 58| 32| 37| 56| 52| 55| | 21| | 36| 56| 30| 37| 39| | 39| 46| | f)Down time/Hr worked | 1.02| 0.71| 0.92| 2.07| | 2.07| 1.32| 1.04| 2.04| 0.74| 0.73| 0.74| | 0.13| | 2.26| 0.35| 0.80| 0.28| 1.17| | 1.17| 1.10| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 21-Jul-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Jun 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|--------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | 6| | 7| 8| | 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | 2| 2| | | | | | | | | | | 3| | 150 mm | 2| 2| 4| 1| | 1| 6| 1| 5| 3| 4| 7| | 2| | 1| | 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| 1| | 1| 12| 2| 12| 11| 7| 18| | 2| | 1| | 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 22.10| 20.82| 21.75| 0.00| | 0.00| 27.41| 20.02| 23.60| 24.75| 28.44| 26.56| | 26.19| | 28.31| | 26.79| | 23.84| | 23.84| 25.10| | c)% Availability | 83| 74| 79| 81| | 81| 80| 98| 84| 66| 75| 70| | 95| | 57| | 82| | 87| | 87| 78| | d)% Utilisation-SSH | 38| 17| 28| 9| | 9| 24| 15| 27| 23| 35| 28| | 21| | 16| | 19| | 16| | 16| 25| | -MAH | 46| 22| 36| 12| | 12| 30| 15| 32| 35| 46| 40| | 23| | 28| | 24| | 19| | 19| 33| | e)Down time/Hr worked | 0.46| 1.54| 0.75| 2.00| | 2.00| 0.84| 0.14| 0.59| 1.43| 0.73| 1.09| | 0.23| | 2.74| | 0.94| | 0.80| | 0.80| 0.85| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| 1| 1| 2| 3| 1| 1| 2| | 2| 1| 1| | 1| 1| 3| 1| 1| | 1| 18| | LOADER | 1| 1| 2| 1| | 1| 7| 2| 3| | 3| 3| | 1| | | 1| 2| | 2| | 2| 22| | GRADER | 3| 1| 4| 1| | 1| 8| 3| 5| 5| 4| 9| | 2| | 1| 1| 4| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| 3| | 3| 11| 3| 7| 7| 4| 11| | 2| | 2| 1| 5| 1| 2| | 2| 49| | Pipe Layers | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | 4| 4| | | | | | | | | | | 4| | TOTAL | 10| 5| 15| 6| 1| 7| 30| 9| 16| 14| 17| 31| 1| 6| | 4| 4| 14| 3| 7| | 7| 133| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 68| 75| 70| 59| 17| 52| 73| 82| 76| 63| 66| 65| 59| 76| | 57| 60| 66| 96| 69| | 69| 69| | c)% Utilisation-SSH | 24| 26| 25| 12| 0| 10| 33| 31| 32| 36| 19| 27| 31| 21| | 25| 25| 23| 15| 29| | 29| 26| | -MAH | 36| 35| 35| 20| 0| 19| 45| 37| 42| 57| 28| 41| 53| 28| | 43| 41| 35| 16| 42| | 42| 39| | d)Down time/Hr worked | 1.32| 0.94| 1.19| 3.38| | 4.70| 0.81| 0.58| 0.75| 1.00| 1.81| 1.31| 1.30| 1.11| | 1.71| 1.59| 1.45| 0.30| 1.07| | 1.07| 1.18| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 61| 30| 91| 23| 1| 24| 165| 43| 146| 114| 64| 178| 1| 25| | 18| 13| 56| 8| 27| | 27| 739| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 76| 76| 76| 60| 17| 58| 71| 80| 65| 61| 73| 66| 59| 88| | 53| 43| 67| 85| 64| | 64| 68| | c)% Utilisation-SSH | 38| 36| 37| 22| 0| 21| 35| 34| 31| 38| 40| 39| 31| 30| | 29| 18| 27| 16| 35| | 35| 35| | -MAH | 50| 47| 49| 37| 0| 36| 50| 43| 48| 62| 54| 59| 53| 34| | 54| 41| 41| 18| 55| | 55| 50| | d)Down time/Hr worked | 0.63| 0.67| 0.64| 1.84| | 2.02| 0.82| 0.57| 1.15| 1.02| 0.67| 0.89| 1.30| 0.38| | 1.64| 3.23| 1.24| 0.94| 1.01| | 1.01| 0.91| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | 2.19| 1.73| | 1.73| | | | | | | | | | | 3.92| | -Actual | | | | | | | | | 2.88| 1.75| | 1.75| | | | | | | | | | | 4.63| |b)Shovels(LCu.M)-Cap. | 4.52| 2.09| 6.61| 1.00| | 1.00| 14.65| 1.76| 12.00| 11.00| 8.10| 19.10| | 1.00| | 1.12| 0.95| 3.07| 0.50| 1.00| | 1.00| 59.68| | -OB | 3.66| 0.21| 3.87| 0.02| | 0.02| 10.77| 0.12| 11.50| 9.90| 7.30| 17.20| | | | 0.20| | 0.20| | | | | 43.68| | -Coal(LT) | 2.52| 3.54| 6.06| 0.92| | 0.92| 7.17| 3.14| 2.34| 3.85| 0.84| 4.69| | 1.67| | 1.09| 0.94| 3.69| | 1.96| | 1.96| 29.98| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mfg Sl.No PK OC RG. OC3 Loader GMMCO 10202 MED OC DOR OC1 2.8Cu.M. Shovel L & T B-592 MED OC DOR OC2 35T Dumper GMMCO 00271 MED OC DOR OC2 35T Dumper GMMCO 00265 DOR OC2 KRG OC Dozer BEML 12654 B)List of Surveyed Off HEMM during the month: Mine Eqpt Make Mfg Sl.No PK OC 1.0 Cu.M Support Shovel BEML 01017 (in May,2012) RG OC1 35T Dumper BEML 11112 RG OC2 1.0 Cu.M.Support Shovel BEML 16065 C)List of Re-commissioned HEMM during the month: Mine Eqpt Make Mfg Sl.No RG OC2 Sub-system S.S. GRS 1000 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 23-Jun-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2012 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.50| 2.60| 5.10| 1.00| | 1.60| 2.60| 5.82| 3.48| 3.42| 2.82| 1.20| 4.02| 1.00| 2.50| | 0.60| 0.60| 3.70| | 0.50| 1.60| 2.10| 31.24| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.50| 2.60| 5.10| 1.00| | 1.60| 2.60| 5.82| 3.48| 3.42| 2.82| 1.20| 4.02| 1.00| 2.50| | 0.60| 0.60| 3.70| | 0.50| 1.60| 2.10| 31.24| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 2.50| 3.55| 6.05| 0.64| 0.14| 2.21| 2.99| 5.15| 3.49| 3.13| 3.78| 0.55| 4.33| 0.29| 1.81| | 1.45| 0.67| 3.93| | 0.50| 1.82| 2.31| 31.66| | - Contractor | | 0.11| 0.11| | | | | 0.64| 0.37| | | | | | | | | | | | | 0.22| 0.22| 1.34| | - Total | 2.50| 3.67| 6.17| 0.64| 0.14| 2.21| 2.99| 5.79| 3.86| 3.13| 3.78| 0.55| 4.33| 0.29| 1.81| | 1.45| 0.67| 3.93| | 0.50| 2.04| 2.53| 33.00| | % Achievement | 100| 141| 121| 64| | 138| 115| 99| 111| 91| 134| 46| 108| 29| 72| | 241| 112| 106| | 99| 127| 121| 106| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 0.11| | 0.11| | 0.64| | 0.64| 0.40| | | | 0.39| 0.79| | | | | | | | 1.64| | 1.64| 3.17| | % Rehandle in Total | 4| | 2| | 446| | 21| 8| | | | 72| 18| | | | | | | | 330| | 71| 10| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 3.69| 2.90| | 2.90| | | | | | | | | | | 6.59| | -Shovels | 5.80| | 5.80| | | | | 21.00| 1.00| 18.61| 28.30| | 28.30| | | | | | | | | | | 74.71| | -Total | 5.80| | 5.80| | | | | 21.00| 1.00| 22.30| 31.20| | 31.20| | | | | | | | | | | 81.30| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 13.50| 26.00| 5.50| | 6.93| 12.43| 35.00| 24.00| 11.50| | 10.00| 10.00| 13.00| 20.25| | 14.00| 13.50| 47.75| | 13.00| | 13.00| 192.68| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.30| 13.50| 31.80| 5.50| | 6.93| 12.43| 56.00| 25.00| 33.80| 31.20| 10.00| 41.20| 13.00| 20.25| | 14.00| 13.50| 47.75| | 13.00| | 13.00| 273.98| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 1.91| 1.09| | 1.09| | | | | | | | | | | 3.00| | -Shovels | 3.84| 0.21| 4.06| | 0.17| | 0.17| 12.50| 0.19| 11.50| 19.70| 1.74| 21.43| | | | | | | | | | | 49.86| | -Total | 3.84| 0.21| 4.06| | 0.17| | 0.17| 12.50| 0.19| 13.41| 20.79| 1.74| 22.52| | | | | | | | | | | 52.86| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 14.00| 5.17| 19.17| 6.45| | | 6.45| 18.34| 27.54| 5.33| | | | 9.40| 13.25| | 14.60| 11.70| 39.55| | 3.27| 7.77| 11.04| 136.81| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 17.85| 5.38| 23.23| 6.45| 0.17| | 6.62| 30.84| 27.73| 18.74| 20.79| 1.74| 22.52| 9.40| 13.25| | 14.60| 11.70| 39.55| | 3.27| 7.77| 11.04| 189.67| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 52| 38| | 38| | | | | | | | | | | 46| | -Shovels | 66| | 70| | | | | 60| 19| 62| 70| | 76| | | | | | | | | | | 67| | -Total | 66| | 70| | | | | 60| 19| 60| 67| | 72| | | | | | | | | | | 65| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 112| 38| 74| 117| | | 52| 52| 115| 46| | | | 72| 65| | 104| 87| 83| | 25| | 85| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 98| 40| 73| 117| | | 53| 55| 111| 55| 67| 17| 55| 72| 65| | 104| 87| 83| | 25| | 85| 69| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.58| 1.59| | 1.59| | | | | | | | | | | 3.17| | - Shovels | | | | | | | | | | 0.50| | 7.27| 7.27| | | | | | | | | | | 7.77| | - Total | | | | | | | | | | 2.08| 1.59| 7.27| 8.86| | | | | | | | | | | 10.94| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 16| 8| 419| 39| | | | | | | | | | | 21| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 74| 149| 88| 64| | 138| 125| 64| 76| 63| 70| 263| 75| 29| 72| | 241| 112| 106| | 99| 114| 110| 72| | % Utiln. of Excav.Cap. | 64| 69| 65| | 35| | 35| 69| 60| 62| 72| 59| 67| | 60| | 48| 100| 58| 0| 71| | 71| 64| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 23-Jun-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2012 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 93| 93| | 54| 39| 74| | 88| 93| 93| 90| 90| | 57| 93| 78| 93| 93| | | 93| 93| | | | - In O B | 93| 93| | 54| 39| | | 88| 31| 93| 90| 90| | 90| | | | | | 81| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | 1| | 2| | | | | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | 18| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9615| 10000| 19615| 5556| | 5161| 10717| 19400| 13385| 13680| 10846| 4615| 15462| 3846| 9615| | 2308| 2308| 14231| | 1923| 6154| 8077| 118412| | Actual | 8066| 11456| 19523| 3548| 1101| 8957| 13606| 17542| 11260| 10088| 12597| 1820| 14417| 1504| 5846| | 4665| 2160| 12671| | 1599| 5863| 7463| 108073| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 22308| | 22308| | | | | 70000| 3846| 89200|120000| |120000| | | | | | | | | | | 305354| | Actual | 12399| 692| 13091| | 1309| | 1309| 42614| 1882| 43258| 69291| 5792| 75083| | | | | | | | | | | 177237| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 9.45| 39.77| 17.10| 15.25| 4.74| 71.00| 28.98| 9.85| 21.32| 6.17| 6.58| 6.27| 6.54| 10.87| 23.24| | 26.90| | 23.88| | 29.42| 28.67| 28.83| 12.13| | Simple Formula | 12.23| 39.77| 20.60| 15.25| 4.74| 71.00| 28.98| 11.58| 26.37| 8.29| 6.98| 6.27| 6.88| 10.87| 23.24| | 26.90| | 28.78| | 29.42| 28.67| 28.83| 14.24| | Excavation(Cu.M)| 26.96| 28.91| 27.55| 10.16| 8.79| 47.33| 20.97| 35.84| 19.05| 41.08| 43.04| 24.12| 40.42| 7.24| 15.49| | 17.93| | 19.19| | 19.62| 19.11| 19.22| 33.28| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 914| 365| 1279| 329| 329| 136| 794| 1870| 572| 1561| 2356| 378| 2734| 116| 338| 18| 246| 103| 705| 67| 69| 258| 327| 10025| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 8.54| 21.39| 29.93| 0.14| 0.03| 0.43| 0.61| 19.89| 3.04| 6.60| 4.06| 0.36| 4.42| 0.25| 8.16| | 6.40| 1.78| 16.34| 0.18| 0.05| 0.23| 0.28| 81.53| | - Cost/Cu.M (Rs.) | 1.55| 8.28| 3.70| 0.34| 0.12| 0.29| 0.28| 1.25| 1.20| 0.43| 0.17| 0.17| 0.17| 1.33| 6.75| | 6.64| 3.98| 6.24| | 0.15| 0.19| 0.18| 1.10| | - Cost/MOR/MTH (Rs.)| 934.2|5860.8|2340.2| 44.0| 9.9| 317.1| 76.6|1063.7| 531.1| 422.6| 172.3| 94.8| 161.6| 218.1|2414.0| |2602.9|1725.3|2317.7| 261.3| 72.8| 88.5| 85.2| 813.3| | PLD Allowance-Rs.Lakhs | 27.08| 10.46| 37.54| 5.68| 1.27| 3.60| 10.54| 58.71| 21.88| 76.60| 99.98| 15.89|115.88| 2.40| 9.28| 0.31| 5.90| 2.47| 17.96| 0.44| 1.78| 6.68| 8.46| 350.40| | - Cost/Cu.M (Rs.) | 4.91| 4.05| 4.64| 13.33| 4.79| 2.44| 4.87| 3.69| 8.68| 4.94| 4.29| 7.56| 4.56| 12.61| 7.68| | 6.12| 5.54| 6.86| | 5.37| 5.51| 5.48| 4.74| | - Cost/MOR/MTH (Rs.)|2962.4|2866.8|2935.1|1725.4| 386.6|2644.3|1328.1|3139.4|3824.4|4907.3|4243.8|4204.7|4238.4|2070.6|2745.5|1703.6|2397.6|2402.5|2547.4| 649.5|2573.3|2589.0|2585.7| 3495.3| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.59| 0.38| 0.52| | 1.05| | 0.13| 0.48| 0.51| 0.84| 0.56| 0.54| 0.57| | 0.52| | 0.38| 0.06| 0.39| | 2.53| | 0.54| 0.57| | b)Other Equipments | 0.40| 0.46| 0.42| | 1.66| 0.01| 0.21| 0.34| 0.50| 0.29| 0.29| 0.48| 0.37| 0.29| 0.59| | 0.56| 0.50| 0.57| | 2.47| | 0.53| 0.37| | c)Total | 0.99| 0.84| 0.94| | 2.71| 0.01| 0.34| 0.82| 1.01| 1.14| 0.85| 1.02| 0.94| 0.29| 1.11| | 0.95| 0.56| 0.96| | 5.00| | 1.07| 0.94| | d)Dumpers(Ltr/CuM/KM) | 0.36| 0.27| | | 1.08| | | 0.34| 0.26| 0.22| 0.28| 0.21| | | 0.21| | 0.21| 0.06| | | 1.34| | | | | e)Lubricants -Ltrs | 17602| 6058| 23660| 2714| 608| | 3322| 51576| 10330| 49900| 28548| 26390| 54938| | 2580| | 6059| 1625| 10264| 3838| 4746| | 4746| 309504| | -Ltrs/CuM| 0.03| 0.02| 0.03| 0.06| 0.02| | 0.02| 0.03| 0.04| 0.04| 0.02| 0.02| 0.02| | 0.02| | 0.06| 0.04| 0.04| | 0.14| | 0.03| 0.04| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 4.16| 6.36| 5.21| 7.01| 7.01| | 7.01| 3.47| 7.43| 6.01| 3.80| 2.70| 3.62| | 2.93| | 4.93| | 4.31| | 5.53| 5.39| 5.42| 4.34| | Shovel-O B(CuM/Kg)| 1.92| 1.74| 1.91| | | | | 2.02| 38.90| 2.03| 1.92| 1.54| 1.88| | | | | | | | | | | 1.96| | Dragline -O B(CuM/Kg)| | | | | | | | | | 2.16| 1.00| | 1.00| | | | | | | | | | | 1.52| | b)% Cap Sensitive | 45.62| 21.41| 39.29| 19.96| 19.94| | 19.96| 2.59| 6.29| 0.18| 2.46| 0.00| 2.22| | 3.62| | 2.48| 0.00| 2.75| | 93.70| 93.70| 93.70| 17.17| | c)Total Explosives(T) | 946| 335| 1280| 9| 2| | 11| 1200| 885| 708| 1235| 133| 1369| | 362| | 262| 88| 712| | 114| 429| 542| 6707| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 80| 78| | 78| | | | | | | | | | 79| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 84| 67| | 67| | | | | | | | | | 76| | d)% Utilisation-SSH | | | | | | | | | | 67| 60| | 60| | | | | | | | | | 63| | -MAH | | | | | | | | | | 79| 90| | 90| | | | | | | | | | 84| | e)Down time/Hr worked | | | | | | | | | | 0.24| 0.55| | 0.55| | | | | | | | | | 0.38| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| 2| | 4| 1| 2| | 2| 30| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| 2| | 4| 1| 2| | 2| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 64| 69| 65| | 35| | 35| 69| 60| 59| 71| 59| 66| | 60| 48| 100| 58| | 71| | 71| 63| | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 87| 92| 89| | 78| | 78| 78| 77| 83| 65| 81| 71| | 95| 63| 100| 80| 70| 92| | 92| 79| | d)% Utilisation-SSH | 64| 63| 63| | 46| | 46| 50| 55| 51| 50| 62| 54| | 59| 46| 100| 55| 31| 73| | 73| 54| | -MAH | 73| 68| 71| | 59| | 59| 65| 71| 61| 77| 77| 77| | 62| 72| 100| 69| 45| 79| | 79| 69| | e)Down time/Hr worked | 0.20| 0.13| 0.17| | 0.48| | 0.48| 0.44| 0.41| 0.34| 0.69| 0.31| 0.54| | 0.08| 0.80| | 0.36| 0.96| 0.11| | 0.11| 0.39| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 23| | | | | | | | | | | | | 44| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | 15| | 35 T | 25| 16| 41| | 12| | 12| 45| 27| 34| 31| | 31| | 12| 9| 5| 26| 3| 14| | 14| 233| | TOTAL | 38| 16| 54| | 12| | 12| 93| 27| 93| 66| 29| 92| | 12| 9| 5| 26| 3| 14| | 14| 414| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 78| 66| 75| | 58| | 58| 68| 73| 56| 59| 76| 64| | 87| 46| 35| 63| 84| 59| | 59| 65| | c)% Utilisation-SSH | 42| 40| 42| | 21| | 21| 38| 35| 34| 45| 56| 48| | 36| 28| 5| 28| 20| 42| | 42| 39| | -MAH | 54| 61| 56| | 37| | 37| 57| 47| 60| 76| 73| 75| | 42| 61| 15| 44| 23| 72| | 72| 59| | f)Down time/Hr worked | 0.51| 0.83| 0.60| | 1.96| | 1.96| 0.84| 0.78| 1.29| 0.90| 0.42| 0.74| | 0.37| 1.93| 12.30| 1.33| 0.82| 0.99| | 0.99| 0.90| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| | 2| | 2| 10| 4| 3| 1| 2| 3| | 2| 2| 2| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | | 5| | 10| 11| 6| 17| | | | | | | | | | 36| | TOTAL | 4| 3| 7| | 2| | 2| 15| 4| 13| 12| 8| 20| | 2| 2| 2| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 57| 94| 71| | 66| | 66| 59| 74| 63| 75| 65| 71| | 98| 31| 43| 56| 90| 71| | 71| 66| | c)% Utilisation-SSH | 31| 28| 30| | 21| | 21| 35| 23| 25| 41| 34| 38| | 28| 11| 12| 17| 25| 24| | 24| 31| | -MAH | 56| 30| 42| | 32| | 32| 59| 32| 39| 55| 53| 54| | 29| 37| 29| 31| 28| 34| | 34| 46| | f)Down time/Hr worked | 1.39| 0.22| 0.95| | 1.61| | 1.61| 1.20| 1.12| 1.49| 0.60| 1.01| 0.76| | 0.08| 6.08| 4.65| 2.53| 0.38| 1.23| | 1.23| 1.11| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : May 2012 +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |---------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 8| | 8| | | | | | | | | | 22| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | | 2| 2| | | | | | | | | | 3| | 150 mm | 2| 2| 4| | 1| | 1| 6| 1| 5| 3| 4| 7| | 2| 1| | 3| | 1| | 1| 28| | TOTAL | 3| 3| 6| | 1| | 1| 12| 2| 12| 11| 7| 18| | 2| 1| | 3| | 1| | 1| 55| | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 24.35| 22.18| 23.75| | 0.00| | 0.00| 29.67| 21.75| 21.94| 25.68| 29.77| 27.68| | 16.10| 28.17| | 18.52| | 38.68| | 38.68| 25.82| | c)% Availability | 83| 58| 71| | 89| | 89| 77| 85| 87| 72| 72| 72| | 98| 60| | 84| | 90| | 90| 78| | d)% Utilisation-SSH | 40| 17| 29| | 15| | 15| 25| 16| 26| 27| 38| 31| | 26| 12| | 21| | 26| | 26| 27| | -MAH | 48| 30| 41| | 17| | 17| 33| 19| 29| 38| 53| 44| | 26| 19| | 24| | 29| | 29| 35| | e)Down time/Hr worked | 0.42| 2.44| 0.97| | 0.75| | 0.75| 0.91| 0.93| 0.49| 1.06| 0.75| 0.91| | 0.08| 3.47| | 0.76| | 0.37| | 0.37| 0.82| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 4| 1| 1| 2| 1| 3| 1| 1| 1| 1| 3| 1| 1| | 1| 20| | LOADER | 1| 1| 2| | 1| | 1| 8| 2| 2| | 3| 3| | 1| | 1| 2| | 2| | 2| 22| | GRADER | 3| 1| 4| | 1| | 1| 8| 3| 5| 5| 4| 9| | 2| 1| 1| 4| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| | 3| | 3| 11| 3| 7| 7| 4| 11| | 2| 2| 1| 5| 1| 2| | 2| 49| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 6| 1| 7| 32| 9| 15| 14| 17| 31| 1| 6| 4| 4| 14| 3| 7| | 7| 134| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 76| 84| 79| | 62| 69| 63| 71| 71| 71| 68| 57| 62| 87| 77| 62| 76| 72| 97| 81| | 81| 70| | c)% Utilisation-SSH | 32| 30| 31| | 17| 19| 17| 34| 30| 38| 45| 18| 30| 34| 31| 28| 31| 30| 3| 42| | 42| 31| | -MAH | 42| 36| 40| | 27| 27| 27| 48| 43| 54| 67| 32| 48| 39| 40| 45| 41| 42| 4| 52| | 52| 44| | d)Down time/Hr worked | 0.73| 0.55| 0.68| | 2.27| 1.64| 2.16| 0.85| 0.96| 0.77| 0.70| 2.34| 1.27| 0.38| 0.77| 1.36| 0.76| 0.94| 0.81| 0.46| | 0.46| 0.97| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 61| 30| 91| | 23| 1| 24| 167| 46| 145| 115| 64| 179| 1| 24| 18| 11| 53| 8| 27| | 27| 741| | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 78| 74| 77| | 63| 69| 63| 69| 74| 63| 64| 70| 66| 87| 87| 50| 53| 67| 88| 70| | 70| 69| | c)% Utilisation-SSH | 42| 38| 41| | 22| 19| 22| 37| 34| 34| 44| 42| 43| 34| 35| 27| 19| 29| 16| 42| | 42| 38| | -MAH | 54| 52| 53| | 35| 27| 35| 54| 46| 54| 69| 60| 65| 39| 40| 54| 35| 43| 18| 60| | 60| 55| | d)Down time/Hr worked | 0.53| 0.68| 0.58| | 1.67| 1.64| 1.67| 0.82| 0.78| 1.07| 0.82| 0.73| 0.79| 0.38| 0.38| 1.82| 2.55| 1.13| 0.77| 0.73| | 0.73| 0.83| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | 7.83| | -Actual | | | | | | | | | | 3.49| 2.68| | 2.68| | | | | | | | | | 6.17| |b)Shovels(LCu.M)-Cap. | 8.78| 3.72| 12.50| | 2.00| | 2.00| 23.55| 4.19| 24.00| 22.00| 16.20| 38.20| | 2.00| 2.00| 0.35| 4.35| 1.00| 2.00| | 2.00| 111.78| | -OB | 3.84| 0.21| 4.06| | 0.17| | 0.17| 12.50| 0.19| 12.00| 13.03| 9.01| 22.04| | | | | | | | | | 50.96| | -Coal(LT) | 2.61| 3.55| 6.15| | 0.78| | 0.78| 5.54| 3.47| 3.13| 3.78| 0.94| 4.72| | 1.81| 1.45| 0.52| 3.78| | 2.13| | 2.13| 29.70| +---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Commissioned during the Mines: Mine Eqpt Make Mnfg Sl.No PK OC 1.0 Cu.M Shovel Telco 14193 RG OC3 Water Tanker Cater Piller 00298 B)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mnfg Sl.No GDK.1 CHP MED OC Loader TELCO 1803 C)List of Surveyed Off HEMM during the month: Mine Eqpt Make Mnfg Sl.No GK OC 150mm Drill RECP 00071 PK OC Water Tanker BEML 00175 RG OC3 85T Dumper GMMCO 8JL29 RG OC1 35T Dumper BEML 11113 THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-May-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2012 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |1) COAL PRODUCTION | | | | | | | | | | | | | | | | | | | | | | | | | | COAL (L T) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - SCCL | 2.40| 2.50| 4.90| 1.00| | 1.60| 2.60| 5.82| 3.48| 3.32| 2.82| 1.00| 3.82| 0.98| 2.40| | 0.50| 0.50| 3.40| | 0.48| 1.50| 1.98| 30.30| | - Contractor | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | 2.40| 2.50| 4.90| 1.00| | 1.60| 2.60| 5.82| 3.48| 3.32| 2.82| 1.00| 3.82| 0.98| 2.40| | 0.50| 0.50| 3.40| | 0.48| 1.50| 1.98| 30.30| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - SCCL | 0.71| 1.84| 2.55| | 0.25| 1.97| 2.22| 3.63| 2.18| 2.24| 3.42| 0.81| 4.23| 0.12| 1.66| | 0.80| 0.09| 2.46| | 0.21| 1.36| 1.57| 21.28| | - Contractor | | | | | | | | 0.64| | | | | | | | | | | | | | 0.59| 0.59| 1.23| | - Total | 0.71| 1.84| 2.55| | 0.25| 1.97| 2.22| 4.27| 2.18| 2.24| 3.42| 0.81| 4.23| 0.12| 1.66| | 0.80| 0.09| 2.54| | 0.21| 1.94| 2.15| 22.51| | % Achievement | 30| 74| 52| | | 123| 86| 73| 63| 67| 121| 81| 111| 12| 69| | 159| 18| 75| | 44| 130| 109| 74| | | | | | | | | | | | | | | | | | | | | | | | | | | | Coal Rehandling | 2.07| 1.55| 3.62| | | | | 0.48| 1.57| | | | 2.05| | | | | 0.09| 0.09| | 2.24| | 2.24| 8.00| | % Rehandle in Total | 291| 84| 142| | | | | 13| 72| | | | 49| | | | | | 4| | 1060| | 143| 38| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | 2) O.B.(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | a)DIGGING | | | | | | | | | | | | | | | | | | | | | | | | | | Target-SCCL-Dragline | | | | | | | | | | 3.55| 2.78| | 2.78| | | | | | | | | | | 6.33| | -Shovels | 5.56| | 5.56| | | | | 21.40| 1.00| 18.75| 28.30| | 28.30| | | | | | | | | | | 75.01| | -Total | 5.56| | 5.56| | | | | 21.40| 1.00| 22.30| 31.08| | 31.08| | | | | | | | | | | 81.34| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 12.50| 13.00| 25.50| 5.25| | 6.93| 12.18| 35.00| 24.00| 11.50| | 5.00| 5.00| 13.00| 20.25| | 14.00| 13.00| 47.25| | 13.00| | 13.00| 186.43| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 18.06| 13.00| 31.06| 5.25| | 6.93| 12.18| 56.40| 25.00| 33.80| 31.08| 5.00| 36.08| 13.00| 20.25| | 14.00| 13.00| 47.25| | 13.00| | 13.00| 267.77| | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual-SCCL-Dragline | | | | | | | | | | 3.26| 0.88| | 0.88| | | | | | | | | | | 4.14| | -Shovels | 4.48| 0.62| 5.11| | 0.29| | 0.29| 11.88| 0.05| 12.90| 20.76| 3.09| 23.85| | | | | | | | | | | 54.07| | -Total | 4.48| 0.62| 5.11| | 0.29| | 0.29| 11.88| 0.05| 16.16| 21.63| 3.09| 24.72| | | | | | | | | | | 58.21| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 14.67| 6.16| 20.82| 6.10| | 0.68| 6.79| 21.31| 27.53| 6.85| | | | 3.23| 19.33| | 15.21| 11.26| 45.79| | 9.27| 2.06| 11.33| 143.65| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 19.15| 6.78| 25.93| 6.10| 0.29| 0.68| 7.07| 33.19| 27.58| 23.01| 21.63| 3.09| 24.72| 3.23| 19.33| | 15.21| 11.26| 45.79| | 9.27| 2.06| 11.33| 201.86| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement-Dragline | | | | | | | | | | 92| 32| | 32| | | | | | | | | | | 65| | -Shovels | 81| | 92| | | | | 56| 5| 69| 73| | 84| | | | | | | | | | | 72| | -Total | 81| | 92| | | | | 56| 5| 72| 70| | 80| | | | | | | | | | | 72| | | | | | | | | | | | | | | | | | | | | | | | | | | | -Contractor| 117| 47| 82| 116| | 10| 56| 61| 115| 60| | | | 25| 95| | 109| 87| 97| | 71| | 87| 77| | | | | | | | | | | | | | | | | | | | | | | | | | | | SCCL+Contractor | 106| 52| 83| 116| | 10| 58| 59| 110| 68| 70| 62| 69| 25| 95| | 109| 87| 97| | 71| | 87| 75| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | b)OB REHANDLING(L Cu.M) | | | | | | | | | | | | | | | | | | | | | | | | | | Target - Dragline | | | | | | | | | | | | | | | | | | | | | | | | | | - Shovels | | | | | | | | | | | | | | | | | | | | | | | | | | - Total | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Actual - Dragline | | | | | | | | | | 1.25| 0.47| | 0.47| | | | | | | | | | | 1.72| | - Shovels | | | | | | | | | | 0.50| | 7.12| 7.12| | | | | | | | | | | 7.62| | - Total | | | | | | | | | | 1.75| 0.47| 7.12| 7.59| | | | | | | | | | | 9.34| | | | | | | | | | | | | | | | | | | | | | | | | | | | % Achievement | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | % Rehandled in Digging | | | | | | | | | | 11| 2| 230| 31| | | | | | | | | | | 16| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | % Ach.-Excav.Target-SCCL | 69| 111| 77| | | 123| 102| 57| 45| 72| 73| 545| 82| 12| 69| | 159| | 72| | 44| 90| 79| 71| | % Utiln. of Excav.Cap. | 70| 79| 73| | 23| | 23| 51| 63| 68| 69| 66| 68| | 55| | 27| 100| 42| 0| 82| | 82| 63| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-May-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2012 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |3) Shifts | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts Worked - In Coal | 90| 90| | | 78| 87| | 87| 90| 89| 90| 90| | 27| 90| 75| 90| 90| | | 90| 90| | | | - In O B | 90| 90| | | 78| 40| | 87| 13| 89| 90| 90| | 90| | | | | | 57| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Shifts lost due to - | | | | | | | | | | | | | | | | | | | | | | | | | | - Rains | | | | | | | | 3| | 1| | | | | | | | | | | | | | | | - Strikes | | | | | | | | | | | | | | | | | | | | | | | | | | - Layoff | | | | | | | | | | | | | | | | | | | | | | | | | | - Others | | | | | | 3| | | | | | | | | | | | | | | | | | | |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |4) Output/Day - SCCL | | | | | | | | | | | | | | | | | | | | | | | | | | a) Coal (T) Target | 9600| 10000| 19600| | | 5333| 5333| 19400| 13385| 12769| 10846| 3846| 14692| 3920| 9600| | 2000| 2000| 13600| | 1920| 6000| 7920| 110619| | Actual | 2371| 6137| 8508| | 970| 6797| 7767| 12532| 7255| 7547| 11391| 2702| 14093| 1283| 5536| | 2650| | 8186| | 705| 4519| 5224| 72396| | | | | | | | | | | | | | | | | | | | | | | | | | | | b) O.B.(Cu.M) Target | 22240| | 22240| | | | | 71333| 3846| 85769|119538| |119538| | | | | | | | | | | 302727| | Actual | 14949| 2073| 17022| | 1103| | 1103| 40966| 1141| 54472| 72111| 10303| 82414| | | | | | | | | | | 197117| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |5) O M S: CIL Formula | 8.48| 21.63| 15.10| | 3.54| 65.53| 21.92| 8.92| 13.24| 7.32| 6.78| 11.47| 7.36| 4.70| 21.70| | 15.78| | 18.81| | 20.83| 19.97| 20.08| 10.84| | Simple Formula | 3.52| 21.63| 8.89| | 3.54| 65.53| 21.92| 8.27| 17.11| 6.21| 6.35| 11.47| 6.94| 4.70| 21.70| | 15.78| | 18.81| | 20.83| 19.97| 20.08| 9.82| | Excavation(Cu.M)| 24.54| 21.73| 23.71| | 6.38| 43.69| 17.44| 32.56| 11.80| 48.95| 44.43| 51.38| 45.24| 3.14| 14.47| | 10.52| | 12.54| | 13.89| 13.31| 13.39| 33.52| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |6) Men On Roll | 913| 360| 1273| | 330| 136| 466| 1874| 575| 1560| 2427| 318| 2745| 113| 338| 19| 246| 103| 706| 67| 42| 281| 323| 9702| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |7) OT Allowance -Rs.Lakhs | 7.28| 19.07| 26.35| | 0.02| 0.76| 0.78| 16.39| 1.94| 10.60| 3.35| 0.27| 3.63| 0.26| 8.64| | 6.36| 0.93| 15.93| 0.31| 0.19| 1.41| 1.61| 77.80| | - Cost/Cu.M (Rs.) | 1.47| 10.31| 3.87| | 0.04| 0.58| 0.44| 1.15| 1.30| 0.60| 0.14| 0.08| 0.13| 3.38| 7.80| | 11.99| | 9.73| | 1.38| 1.57| 1.54| 1.08| | - Cost/MOR/MTH (Rs.)| 797.8|5296.2|2069.9| | 6.0| 557.5| 166.9| 874.7| 338.2| 679.2| 138.2| 86.2| 132.2| 230.0|2556.4| |2583.8| 905.6|2256.3| 468.6| 461.7| 503.5| 498.0| 801.9| | PLD Allowance-Rs.Lakhs | 33.95| 13.03| 46.98| | 7.25| 3.80| 11.04| 74.53| 16.40| 58.96| 76.87| 10.07| 86.94| 2.94| 11.72| 0.37| 7.57| 3.24| 22.91| 0.54| 1.36| 9.07| 10.43| 331.65| | - Cost/Cu.M (Rs.) | 6.85| 7.04| 6.90| | 15.93| 2.89| 6.24| 5.21| 10.93| 3.34| 3.21| 2.77| 3.16| 38.13| 10.59| | 14.29| | 13.99| | 9.62| 10.04| 9.98| 4.58| | - Cost/MOR/MTH (Rs.)|3718.5|3618.4|3690.2| |2195.5|2790.9|2369.3|3977.0|2851.9|3779.4|3167.1|3167.8|3167.2|2598.0|3468.1|1960.1|3079.1|3142.1|3244.4| 807.6|3228.1|3228.9|3228.8| 3418.4| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |8) HSD Consmptn.(Ltr/CuM) | | | | | | | | | | | | | | | | | | | | | | | | | | a)Dumpers | 0.68| 0.58| 0.65| | 0.69| | 0.18| 0.62| 0.96| 0.82| 0.52| 0.53| 0.53| | 0.73| | 0.86| | 0.83| | 5.97| | 0.81| 0.63| | b)Other Equipments | 0.45| 0.65| 0.50| | 0.94| 0.02| 0.26| 0.38| 0.76| 0.29| 0.29| 0.45| 0.35| 0.47| 0.69| | 1.05| | 0.98| | 5.53| | 0.75| 0.39| | c)Total | 1.13| 1.23| 1.16| | 1.63| 0.02| 0.44| 0.99| 1.72| 1.11| 0.80| 0.98| 0.89| 0.47| 1.42| | 1.91| | 1.82| | 11.50| | 1.55| 1.02| | d)Dumpers(Ltr/CuM/KM) | 0.44| 0.46| | | 0.71| | | 0.33| 0.48| 0.24| 0.21| 0.86| | | 0.30| | 0.40| | | | 2.97| | | | | e)Lubricants -Ltrs | 20641| 6619| 27260| | 3332| | 3332| 52327| 9960| 50310| 29940| 22956| 52896| | 6100| | 6672| 1085| 13857| 965| 5997| | 5997| 320246| | -Ltrs/CuM| 0.04| 0.04| 0.04| | 0.07| | 0.02| 0.04| 0.07| 0.03| 0.02| 0.02| 0.02| | 0.06| | 0.13| | 0.08| | 0.43| | 0.06| 0.05| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |9) Blasting Performance | | | | | | | | | | | | | | | | | | | | | | | | | | a)PowderFactor-Coal(T/Kg)| 1.99| 2.47| 2.31| | 12.01| | 12.01| 2.00| 3.36| 4.04| 5.84| 3.98| 5.36| | 1.89| | 1.89| | 1.89| | 4.14| 3.97| 3.99| 2.60| | Shovel-O B(CuM/Kg)| 1.99| 4.40| 2.13| | | | | 2.16| | 2.08| 2.01| 1.16| 1.84| | | | | | | | | | | 2.00| | Dragline -O B(CuM/Kg)| | | | | | | | | | 3.91| 1.33| | 1.33| | | | | | | | | | | 2.77| | b)% Cap Sensitive | 51.89| 17.41| 41.35| | 20.24| | 20.24| 2.04| 9.00| 0.60| 1.76| 0.70| 1.55| | 3.99| | 3.23| 0.00| 3.22| | 94.45| 94.45| 94.45| 17.33| | c)Total Explosives(T) | 888| 391| 1279| | 2| | 2| 1448| 719| 758| 1156| 288| 1444| | 407| | 260| 98| 765| | 74| 493| 566| 6981| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-May-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2012 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| |10) H E M M PERFORMANCE | | | | | | | | | | | | | | | | | | | | | | | | | | A) D R A G L I N E | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 30.6 & 24 Cu.M | | | | | | | | | | 1| 1| | 1| | | | | | | | | | | 2| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | | | | | | | | | | 103| 39| | 39| | | | | | | | | | | 75| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | | | | | | | | | | 76| 29| | 29| | | | | | | | | | | 53| | d)% Utilisation-SSH | | | | | | | | | | 70| 25| | 25| | | | | | | | | | | 47| | -MAH | | | | | | | | | | 92| 84| | 84| | | | | | | | | | | 90| | e)Down time/Hr worked | | | | | | | | | | 0.34| 2.84| | 2.84| | | | | | | | | | | 0.99| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | B) S H O V E L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 12.0 Cu.M | | | | | | | | 1| | 1| 1| 4| 5| | | | | | | | | | | 7| | 10.0 Cu.M | 1| | 1| | | | | 6| | 5| 4| | 4| | | | | | | | | | | 16| | 6.5 Cu.M | 1| | 1| | | | | 2| | 2| 2| | 2| | | | | | | | | | | 7| | 5 Cu.M | | | | | | | | | | 2| 1| 2| 3| | | | | | | | | | | 5| | 3.0 Cu.M | 4| 3| 7| | 2| | 2| 6| 4| 1| 3| | 3| | 2| | 2| | 4| 1| 2| | 2| 30| | TOTAL | 6| 3| 9| | 2| | 2| 15| 4| 11| 11| 6| 17| | 2| | 2| | 4| 1| 2| | 2| 65| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Capacity Utilisation | 70| 79| 73| | 23| | 23| 51| 63| 62| 74| 66| 71| | 55| | 27| 100| 42| | 82| | 82| 62| | | | | | | | | | | | | | | | | | | | | | | | | | | | c)% Availability | 89| 95| 91| | 85| | 85| 83| 92| 86| 67| 83| 72| | 88| | 70| 100| 80| 84| 89| | 89| 83| | d)% Utilisation-SSH | 67| 68| 67| | 48| | 48| 54| 60| 51| 53| 64| 57| | 63| | 49| 100| 58| 37| 68| | 68| 57| | -MAH | 75| 72| 74| | 56| | 56| 65| 65| 59| 79| 77| 78| | 72| | 70| 100| 73| 44| 76| | 76| 69| | e)Down time/Hr worked | 0.16| 0.08| 0.13| | 0.30| | 0.30| 0.31| 0.13| 0.28| 0.63| 0.27| 0.49| | 0.20| | 0.62| | 0.34| 0.43| 0.17| | 0.17| 0.30| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | C) D U M P E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 100 T | | | | | | | | 30| | 31| 35| 26| 61| | | | | | | | | | | 122| | 85 T | 8| | 8| | | | | 13| | 24| | | | | | | | | | | | | | 45| | 60 T | 5| | 5| | | | | 5| | 5| | | | | | | | | | | | | | 15| | 35 T | 25| 16| 41| | 12| | 12| 45| 27| 34| 32| | 32| | 12| | 9| 5| 26| 3| 14| | 14| 234| | TOTAL | 38| 16| 54| | 12| | 12| 93| 27| 94| 67| 26| 93| | 12| | 9| 5| 26| 3| 14| | 14| 416| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 80| 74| 78| | 64| | 64| 70| 68| 56| 62| 80| 68| | 78| | 53| 31| 61| 86| 61| | 61| 66| | c)% Utilisation-SSH | 45| 47| 45| | 23| | 23| 40| 35| 35| 45| 59| 49| | 41| | 36| 22| 36| 19| 43| | 43| 41| | -MAH | 56| 64| 58| | 36| | 36| 58| 52| 62| 71| 73| 72| | 53| | 68| 71| 59| 22| 71| | 71| 61| | f)Down time/Hr worked | 0.44| 0.55| 0.47| | 1.56| | 1.56| 0.74| 0.92| 1.28| 0.84| 0.33| 0.67| | 0.52| | 1.33| 3.17| 1.07| 0.72| 0.91| | 0.91| 0.83| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | D) D O Z E R S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | D155 A-1 | 2| 1| 3| | 2| | 2| 10| 4| 3| 1| 2| 3| | 2| | 2| 2| 6| 1| 3| | 3| 35| | D355 A-3 | 2| 2| 4| | | | | 5| | 10| 11| 6| 17| | | | | | | | | | | 36| | TOTAL | 4| 3| 7| | 2| | 2| 15| 4| 13| 12| 8| 20| | 2| | 2| 2| 6| 1| 3| | 3| 71| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 50| 69| 57| | 51| | 51| 60| 86| 56| 68| 69| 68| | 94| | 63| 53| 70| 90| 76| | 76| 65| | c)% Utilisation-SSH | 30| 24| 27| | 15| | 15| 37| 22| 22| 40| 32| 37| | 31| | 16| 15| 21| 7| 25| | 25| 30| | -MAH | 59| 34| 48| | 29| | 29| 61| 25| 40| 59| 47| 54| | 33| | 26| 29| 30| 7| 34| | 34| 46| | f)Down time/Hr worked | 1.68| 1.31| 1.56| | 3.34| | 3.34| 1.07| 0.63| 1.98| 0.80| 0.97| 0.87| | 0.20| | 2.30| 3.07| 1.42| 1.59| 0.96| | 0.96| 1.18| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ THE SINGARENI COLLIERIES COMPANY LIMITED KOTHAGUDEM - 507101 Printed on : 22-May-2012 OPENCAST MANAGEMENT CONTROL STATEMENT Report Month : Apr 2012 +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ | | KGM | YLD | MNG | RG1 | RG2 | RG3 | BHP | BPA | MM | SRP | ALL | | PROJECT |--------------------|---------------------------| | | |--------------------| |----------------------------------| |--------------------| | | | GKOC | JOC-I| Area |JK5 OC| BLK-E|KOC II| Area | PK OC| MEDOC|RGOC-3|RGOC-1|RGOC-2| Area | KTKOC|KRG OC|OC-2Ex|Dorli1|Dorli2| Area |RKP OC|SRPOC1|SRPOC2| Area |PROJECTS| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | E) D R I L L S | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | 250 mm | 1| | 1| | | | | 6| | 7| 8| | 8| | | | | | | | | | | 22| | 160 mm | | | | | | | | | 1| | | 1| 1| | | | | | | | | | | 2| | 152 mm | | 1| 1| | | | | | | | | 2| 2| | | | | | | | | | | 3| | 150 mm | 3| 2| 5| | 1| | 1| 6| 1| 5| 3| 4| 7| | 2| | 1| | 3| | 1| | 1| 29| | TOTAL | 4| 3| 7| | 1| | 1| 12| 2| 12| 11| 7| 18| | 2| | 1| | 3| | 1| | 1| 56| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)Meterage Drilled/Hour | 23.95| 22.10| 23.34| | 0.00| | 0.00| 25.88| 23.40| 25.03| 26.81| 33.04| 29.93| | 24.17| |226.74| | 78.31| | 40.37| | 40.37| 29.42| | c)% Availability | 85| 62| 75| | 89| | 89| 79| 69| 80| 80| 77| 79| | 96| | 67| | 86| | 93| | 93| 79| | d)% Utilisation-SSH | 32| 22| 28| | 3| | 3| 26| 19| 24| 27| 41| 32| | 24| | 17| | 22| | 32| | 32| 27| | -MAH | 38| 36| 37| | 4| | 4| 32| 27| 30| 34| 53| 41| | 25| | 25| | 25| | 34| | 34| 34| | e)Down time/Hr worked | 0.47| 1.71| 0.88| | 3.55| | 3.55| 0.80| 1.67| 0.84| 0.76| 0.55| 0.66| | 0.15| | 1.97| | 0.64| | 0.21| | 0.21| 0.77| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | F) OTHER HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a)Equipment On Roll | | | | | | | | | | | | | | | | | | | | | | | | | | SUPPORT SHOVEL | 2| 1| 3| | 1| 1| 2| 3| 1| 1| 2| 1| 3| 1| 1| | 1| 1| 3| 1| 1| | 1| 19| | LOADER | 1| 1| 2| | 1| | 1| 8| 1| 2| | 3| 3| | 1| | | 1| 2| | 2| | 2| 21| | GRADER | 3| 1| 4| | 1| | 1| 8| 3| 5| 5| 4| 9| | 2| | 1| 1| 4| 1| 2| | 2| 37| | WATER TANKER | 4| 2| 6| | 3| | 3| 12| 3| 6| 7| 4| 11| | 2| | 2| 1| 5| 1| 2| | 2| 49| | Pipe Layers | | | | | | | | 1| | | | 2| 2| | | | | | | | | | | 3| | SUB-SYSTEM | | | | | | | | | | | | 3| 3| | | | | | | | | | | 3| | TOTAL | 10| 5| 15| | 6| 1| 7| 32| 8| 14| 14| 17| 31| 1| 6| | 4| 4| 14| 3| 7| | 7| 132| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 74| 85| 78| | 64| 90| 68| 72| 81| 65| 77| 68| 72| 55| 79| | 74| 61| 73| 64| 83| | 83| 73| | c)% Utilisation-SSH | 31| 31| 31| | 18| 23| 19| 34| 31| 37| 48| 24| 35| 29| 27| | 27| 31| 28| 9| 30| | 30| 32| | -MAH | 42| 36| 40| | 28| 25| 28| 48| 39| 56| 62| 36| 48| 52| 34| | 37| 51| 39| 14| 36| | 36| 43| | d)Down time/Hr worked | 0.83| 0.49| 0.72| | 2.01| 0.45| 1.71| 0.81| 0.59| 0.94| 0.48| 1.32| 0.80| 1.57| 0.76| | 0.95| 1.23| 0.94| 4.15| 0.59| | 0.59| 0.85| |--------------------------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|------|--------| | G) TOTAL HEMM | | | | | | | | | | | | | | | | | | | | | | | | | | a) HEMM on Roll | 62| 30| 92| | 23| 1| 24| 167| 45| 145| 116| 64| 180| 1| 24| | 18| 11| 53| 8| 27| | 27| 742| | | | | | | | | | | | | | | | | | | | | | | | | | | | b)% Availability | 78| 77| 78| | 66| 90| 67| 71| 74| 61| 66| 75| 70| 55| 82| | 61| 48| 68| 77| 71| | 71| 70| | c)% Utilisation-SSH | 43| 42| 43| | 23| 23| 23| 39| 35| 34| 44| 45| 44| 29| 37| | 32| 26| 34| 15| 39| | 39| 39| | -MAH | 55| 55| 55| | 34| 25| 34| 55| 47| 56| 65| 59| 63| 52| 45| | 53| 55| 49| 19| 56| | 56| 56| | d)Down time/Hr worked | 0.50| 0.55| 0.52| | 1.51| 0.45| 1.46| 0.73| 0.74| 1.13| 0.77| 0.55| 0.69| 1.57| 0.48| | 1.22| 2.00| 0.95| 1.55| 0.73| | 0.73| 0.76| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ DragLine and Shovels Capacity and Actuals - +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ |a)DragLine(LCu.M)-Cap. | | | | | | | | | | 4.38| 3.45| | 3.45| | | | | | | | | | | 7.83| | -Actual | | | | | | | | | | 4.51| 1.34| | 1.34| | | | | | | | | | | 5.85| |b)Shovels(LCu.M)-Cap. | 9.04| 3.63| 12.67| | 2.00| | 2.00| 28.78| 4.05| 24.00| 22.00| 16.20| 38.20| | 2.00| | 2.00| 0.06| 4.06| 0.73| 2.00| | 2.00| 116.49| | -OB | 4.48| 0.62| 5.11| | 0.29| | 0.29| 11.87| 0.05| 13.40| 13.98| 10.21| 24.19| | | | | | | | | | | 54.90| | -Coal(LT) | 2.78| 3.39| 6.17| | 0.25| | 0.25| 4.11| 3.75| 2.24| 3.42| 0.81| 4.23| | 1.66| | 0.80| 0.09| 2.54| | 2.45| | 2.45| 25.75| +----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------+ A)List of HEMM Transfered between the Mines: From Mine To Mine Eqpt Make Mfg Sl.No Local_Code RG. OC3 PK. OC LOADER H.M. 10202 LOADER-5 RG. OC2 RG. OC1 250mm Drill ATLAS 10181 DM-12 KRG OC DOR OC2 35T Dumper CPIL AO301 KGH - 7 KRG OC DOR OC1 Support Shovel Tata Hitachi 09938 DS - 3 DOR OC1 DOR OC2 35T Dumper GMMCO A0307 DH - 2 SRP OC1 RK. OC 35T Dumper H.M. 00761 TC-373 SRP OC1 RK. OC 35T Dumper H.M. 00764 TC-374 SRP OC1 RK. OC 35T Dumper H.M. 00765 TC-375 SRP OC1 RK. OC 3 Cu.M Shovel L & T TB-544 S5 MED OC GDK.1 CHP Loader TELCO 1803 Loader-6 B)List of Surveyed Off HEMM during the month: Mine Eqpt Make Mnfg Sl.No JK OC 150mm Drill LMP 01202 GK OC 35T Dumper H.M. 06035 GK OC 35T Dumper H.M. 06038 GK OC 35T Dumper H.M. 06040 RG.OC1 85T Dumper BEML 01643 RG.OC1 85T Dumper BEML 01741 RG.OC1 85T Dumper BEML 01744 RG.OC1 85T Dumper BEML 01745 RG.OC1 85T Dumper BEML 01640 RG.OC1 85T Dumper BEML 01641 RG.OC1 85T Dumper BEML 01642